Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Georgia was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical Installation and Wiring Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 3 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

This contract involves the installation of electrical systems at the project site, covering power distribution, lighting, and control wiring. It is a subcontract opportunity issued by the City of Augusta, Georgia, aimed at providing comprehensive electrical installation and wiring services in alignment with the specified NAICS code 238210. The solicitation was posted on May 28, 2026, with a response deadline set for June 30, 2026, at 4:00 PM. While specific details regarding the exact location and point of contact are not provided, the contract emphasizes the importance of expert electrical work to ensure proper functionality and safety of the systems installed. Interested parties can access further information through the designated online portal.

General Info

Electrical installation subcontract in Augusta, Georgia; power distribution, lighting, wiring; response by June 30, 2026.

Agency

Georgia → City of AugustaView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-72155-NONST-2026-000000192.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

26-400 Fire Alarm System Replacement for Charles B. Webster Detention Center

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Augusta
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → City of Augusta
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of electrical systems, including power distribution, lighting, and control wiring for the project site.

More opportunities from Georgia → City of Augusta

Same awarding agency

NAICS: 238220
New
SLED
26-177 Energy Recovery Ventilator Repair
Solicitation # 26-177
The City of Augusta, Georgia, is soliciting bids under solicitation number 26-177 for a qualified vendor to rebuild two energy recovery ventilators located at the Charles B. Webster Detention Center. The scope of work includes the removal and replacement of major mechanical and electrical components, inspection of mounting hardware, alignment, and belts, and the final reassembly and testing of supply, exhaust, and energy recovery wheel assemblies. Bids are due by October 9, 2026, at 11:00 a.m. and must be submitted as one original and one electronic version on a USB drive, delivered by mail or hand to the Procurement Department. Award decisions will be based on the bidder's responsiveness and responsibility, with a local bidder preference applied to projects of 100,000 dollars or less if the local bid is within 10 percent or 10,000 dollars of the lowest non-local bid. Required documentation includes a business license, W-9, E-Verify affidavit, and certifications regarding non-discrimination and non-collusion. Contractors must maintain all necessary liability and workman's compensation insurance and hold appropriate General or Utility Contractor licenses per Georgia state law. The contract allows for termination for cause if the contractor fails to cure non-compliance within five days of notice, or termination by either party with thirty days' written notice for failure to perform.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 333996
New
SLED
26-173 Chafee Lift Station Pumps
Solicitation # 26-173
The City of Augusta, Georgia, is soliciting bids under solicitation number 26-173 for the furnishing and delivery of three new submersible wastewater pump assemblies for the Chaffee Lift Station. These pumps must be new, unused, and suitable for continuous-duty municipal wastewater service, with specifications approximately 200 HP and 11,900 GPM at 49 feet TDH. The scope of work also includes the provision of 150-pound flanged components, such as EPDM gasket and bolt kits, bell reducers, elbows, eccentric plug valves, and MEGAFLANGE adapters. While Augusta Utilities will typically handle field installation, the supplier is responsible for providing all necessary technical support, installation manuals, operation and maintenance documentation, and certified pump performance curves. Bids are due by October 15, 2026, at 11:00 a.m., and must be submitted in both original and electronic formats. Award will be granted to the lowest responsive and responsible bidder based on technical suitability, delivery requirements, warranty, and compatibility. All freight, handling, and packaging costs must be included in the bid price. Required submission documents include a business license, W-9, E-Verify affidavit, and statements regarding non-discrimination, non-collusion, and conflict of interest. Additionally, contractors must maintain liability and workman's compensation insurance and adhere to M/WBE program reporting requirements.
Fluid Power Pump and Motor Manufacturing

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 332996
New
SLED
27-116 Various Pipe, Coupling & End Sections
Solicitation # 27-116
The City of Augusta, Georgia, is soliciting bids for solicitation 27-116 to establish an annual contract for the provision of various High-Density Polyethylene (HDPE) pipe, couplings, and end sections for the Engineering and Environmental Services Department. These materials are required for the installation and maintenance of water diversion down drains on side slopes and must comply with Georgia Rules for Solid Waste Management and Georgia Erosion and Sedimentation Control Rules. The scope includes a wide range of single-walled and double-walled type S HDPE pipes ranging from 8 to 36 inches, as well as 45-degree elbows, 90-degree bends, and tees. Items will be ordered on an as-needed basis, with delivery required within 60 days of purchase. The successful bidder must agree that no additional shipping, delivery, tariff, or restocking fees will be charged to the city. Bids are due by September 29, 2026, at 11:00 a.m., and must include one original and one electronic version on USB. The award will be granted to the lowest responsive bid that meets all technical specifications, provided the bidder does not require a minimum order amount. A local bidder preference applies to projects of 100,000 dollars or less if the local bidder is within 10 percent or 10,000 dollars of the lowest non-local bidder. Required documentation includes business licenses, W-9s, E-Verify affidavits, and a non-collusion affidavit. Contract terms include a price escalation limit of three percent per item, requested 60 days prior to renewal, and a 30-day written notice requirement for termination. Bidders must also maintain liability and workman's compensation insurance and adhere to strict non-discrimination policies.
Fabricated Pipe and Pipe Fitting Manufacturing

POSTED

1 day ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS