Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Homeland Security was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical Installation and Wiring Services

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 10 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract is for electrical installation and wiring services under a Total Small Business Set-Aside, classified under NAICS code 238210 for electrical contractors. It encompasses the full scope of installing power distribution systems, lighting systems, and associated control wiring for a project located in Dulac, Louisiana, with a zip code of 70353. The solicitation was posted on April 28, 2026, and responses are due by May 5, 2026, at 8:00 PM Eastern Time. The contracting agency is the Department of Homeland Security, operating under the Base New ORLEANS (00029) entity. This is a subcontract opportunity, meaning the awardee will work under a prime contractor, and only small businesses eligible under SBA guidelines may respond. Performance will take place entirely at the specified location in Dulac, with no further details provided regarding the end user or specific site requirements beyond the scope of electrical systems installation.

General Info

Electrical installation contract in Dulac, LA for small businesses, due May 5, 2026, DHS Base New ORLEANS.

Agency

Department Of Homeland Security → Base New ORLEANS(00029)View Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Dulac, LA, 70353, USA

Set-Aside

SBA

Documents

This scope was carved out of 41966Q260000002.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Replace Emergency Generator

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base New ORLEANS(00029)
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Homeland Security → Base New ORLEANS(00029)
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of electrical systems including power distribution, lighting, and control wiring for the project.

More opportunities from Department Of Homeland Security → Base New ORLEANS(00029)

Same awarding agency

NAICS: 238220
New
Federal
Remove and replace commercial water heaters
Solicitation # 37160Q260000027
Solicitation 37160Q260000027 is a Request for Quotation for a Firm-Fixed Price construction contract to remove and replace three commercial water heaters and associated plumbing components at U.S. Coast Guard Station Dauphin Island in Alabama. The scope of work includes the replacement of two 120-gallon water heaters and a 14-gallon thermal expansion tank in the utility room, as well as one 85-gallon water heater in the kitchen utility closet. The contractor is responsible for providing all labor, commercial-grade materials, and equipment, including the replacement of mixing valves, pumps, and piping, and the lawful disposal of all removed debris. The project must be completed within a 30-day performance period, and the contractor must provide a temporary hot water source if service is unavailable for more than 24 consecutive hours. This procurement is a total small business set-aside under NAICS code 238220. Award will be based on the lowest price, technical acceptability, and past performance. Interested offerors must be registered in the System for Award Management and are strongly encouraged to conduct a site visit coordinated through the Contracting Officer Representative. All quotes and written inquiries must be submitted by 3:00 pm CST on September 17, 2026. The contract adheres to FAR Part 36 and includes specific requirements for domestic construction materials, Department of Labor wage rates, and compliance with national electrical and plumbing codes.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 238290
Federal
Repair & Perform A 1-For-1 In-Kind Replacement of Elevator Equipment at USCG Base New Orleans
Solicitation # 70Z02926QNEWO432
The United States Coast Guard is seeking proposals for a firm-fixed price contract to perform a 1-for-1 in-kind replacement of elevator equipment at Base New Orleans, located at 1790 Saturn Blvd, New Orleans, LA. The project involves replacing obsolete ThyssenKrupp TAC20 hydraulic ram equipment with non-proprietary microprocessor-based controllers and hydraulic power equipment to ensure service continuity. All work must be performed by a state-licensed contractor in accordance with ASME A17.1/CSA B44 safety codes, OSHA regulations, and ADA requirements. A mandatory site visit is required prior to submitting a quote to verify existing conditions and take field measurements. This acquisition is a total small business set-aside under NAICS code 238290, requiring active registration in SAM.gov. Award will be made to the lowest priced technically acceptable offer, with evaluations based on price, technical approach, and past performance. The contractor must adhere to Davis-Bacon Act wage determinations for Orleans Parish and follow a strict performance timeline, including providing submittals within 7 days of award and completing the project within 15 days of commencing work. Final acceptance is contingent upon a successful code compliance inspection, the issuance of a certificate of operation, and approval of the job site appearance by the Contracting Officer's Representative.
Other Building Equipment Contractors

POSTED

12 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS