Electrical Pump Replacement and Control System Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails replacing all natural gas-powered pumps at the wastewater lift station in Arcata with electric pumps, requiring the installation of a new three-phase electrical service to support the upgraded infrastructure. This includes running dedicated conduit and wiring from the power source to the pump units, as well as retrofitting and modernizing the control panels to ensure seamless operation and enhanced system monitoring. The work must be performed at the existing lift station location in Arcata, California, with all materials and labor meeting current electrical and wastewater industry standards. The project is being managed under NAICS code 238210, indicating it falls under electrical contracting services, and is structured as a subcontract tied to the City of Arcata’s broader facility improvement agenda. The contract was posted in July 2026, and the work will directly contribute to reducing emissions, improving reliability, and aligning operations with sustainable infrastructure goals.
General Info
Agency
NAICS
Place of Performance
Arcata, CA, 95521Set-Aside
Documents
This scope was carved out of First Street Lift Station Improvement Project.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
