Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Electrical Subcontractor

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This electrical subcontract through The Ohio State University involves performing specialized electrical work for prime contractors on Ohio Facilities Construction Commission projects located at Harding Hospital. The scope of work focuses on the disconnection of electrical components before roof tear-off, followed by the reconnection and certification of sensors, lighting, and roof-mounted equipment after PVC installation. The selected vendor must utilize appropriate wiring, conduits, and electrical testing equipment to deliver fully certified connections. To be eligible, the subcontractor must be a prequalified vendor and employ licensed electricians. The solicitation was posted on October 28, 2026, with a response deadline of November 16, 2026. This project falls under NAICS code 238210 and requires strict adherence to the technical standards necessary for healthcare facility infrastructure.

General Info

Electrical subcontract for Harding Hospital roof equipment disconnection, reconnection, and certification services.

Documents

This scope was carved out of OSU-265568.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Harding Hospital - Roof 2 replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyThe Ohio State University
ContactsNo contacts available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical work for prime contractors on Ohio Facilities Construction Commission projects at Harding Hospital. Disconnects electrical components prior to roof tear-off and performs reconnection and certification of roof-mounted equipment, lighting, and sensors after PVC installation. Uses electrical testing equipment, wiring, and conduits. Requires licensed electrician and prequalified vendor status. Delivers certified electrical connections.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity with Atterbury Job Corps Center and Adams & Associates, Inc., operated for the U.S. Department of Labor. The project requires the installation of emergency shut-off switches on power tools within the Facility Engineering Storage/Maintenance Shop in Edinburgh, Indiana. Specifically, the contractor must provide and install two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel featuring a 60A shunt-trip main circuit breaker. All work must comply with FNC guidelines, OSHA and EPA regulations, and Indiana state and local codes. The procurement is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. A mandatory site visit was scheduled for November 10, 2026, with a proposal deadline of November 20, 2026. Bidders must submit a single lump sum contract bid on company letterhead, including a detailed cost breakdown, a timeline for completion, and proof of a valid Indiana Contractor's License. Award will be based on Best Value, evaluated across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Contractors are required to maintain comprehensive insurance, including General Liability of at least 1 million dollars per occurrence and Automobile Liability. Compliance with Davis-Bacon Act wage rates is mandatory. The contract includes Net 30 payment terms, and final payment is contingent upon the submission of certified payroll records, a completed SF 1413, and a release of liens. All workmanship is guaranteed for one year following the acknowledgment of substantial completion.
Atterbury Job Corps. – Adams & Associates

POSTED

about 4 hours ago

DEADLINE

in 22 days
View Details
NAICS: 238210
New
26-138 Main grounding electrode conductor is not provided
Solicitation # 26-138
Solicitation 26-138 is a subcontracting opportunity for the Atterbury Job Corps Center in Edinburgh, Indiana, operated by Adams and Associates. The project requires a licensed electrical contractor to correct grounding system deficiencies where the main grounding electrode conductor from incoming water pipes is not connected to service distribution panels. Specific technical requirements include installing a new #4AWG main grounding electrode conductor from the water main to the 200A service panelboard in the Storage Room, providing two supplemental 5/8 inch by 8 foot grounding electrodes connected via #6AWG bare copper conductor, and separating the ground bus from the neutral inside the distribution panel. All work must comply with NEC 2020, 250, as well as current EPA and OSHA regulations. The solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Interested bidders must attend a mandatory site visit on November 10, 2026, and submit a single lump sum bid with a detailed cost breakdown by November 20, 2026. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Required submission documents include a Vendor Questionnaire, W9, proof of an Indiana Contractor's License, and certification of compliance with Davis Bacon Act wage rates. The successful contractor must start work within 14 days of the Notice to Proceed and provide proof of automobile liability and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30, and the center is tax-exempt.
Atterbury Job Corps. – Adams & Associates

POSTED

about 4 hours ago

DEADLINE

in 22 days
View Details
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: performing visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and conducting comprehensive oil testing analysis. Additionally, the selected contractor will evaluate nitrogen blanket systems, provide operating pressure recommendations, and deliver on-site training and standard operating procedures to agency staff. All work must adhere to NETA MTS, IEEE, ASTM D923, and NFPA 70E safety protocols, with infrared inspections performed by ASNT Level 1 certified technicians or equivalent. The agency intends to make a single award to the most capable and cost-effective offeror. Evaluation criteria include a proven track record of at least two similar projects within the last five years, the proposed staffing plan, personnel availability, and the fee structure. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed company profile, project methodology, and required certifications such as a non-collusion statement and workers compensation certificate. The resulting contract will utilize fixed pricing with a not-to-exceed total cost, and payments will be processed electronically via ACH within 30 days of invoice approval.
Inland Empire Utilities Agency

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 238210
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-2
Axia Electric LLC is soliciting bids from SBE/DBE certified firms for the Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility Project for the Eastern Municipal Water District in California. The scope of work is divided between the San Jacinto Valley Advanced Water Purification Facility and Brine Ponds, specifically requesting subcontractors for low voltage systems, fiber optics, and electrical materials and supply. Bids must be submitted by 2:00 PM on November 18th, with a final bid date of November 19th at 10:00 AM. Quotes should be directed to lead estimator Ryan Falk. Qualified bidders must be registered to perform public work pursuant to Labor Code Sections 1725.5 and 1771.1 (a) and must agree to abide by the AGC Master Labor Agreements and the terms of Axia's Standard Long Form Subcontract or Purchase Order. Minimum insurance requirements include 1 million dollars for General Liability per occurrence, 2 million dollars for Aggregate and Completed Operations, 5 million dollars for Excess Liability, 1 million dollars for Auto Liability, and 1 million dollars for Workers Compensation and Employer Liability. Evaluation will prioritize SBE/DBE certification, though non-certified firms may provide lower-tier participation details for consideration.
Axia Electric

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves inspecting, testing, repairing, and certifying emergency lighting systems across the facility, including specific areas such as the cafeteria, education building, recreation center, and men's and women's dormitories. The contractor is responsible for providing all labor, materials, and equipment to ensure compliance with NFPA 101 (2024 Edition), NFPA 70, and OSHA standards. Key deliverables include a full inventory of fixtures, functional testing via simulated power outages, the application of durable tracking labels to each fixture, integration of maintenance requirements into the operator's Computerized Maintenance Management System (CMMS), and the provision of hazardous material disposal certificates. The estimated contract value ranges from $25,000 to $100,000, with awards based on overall best value. Bidders must complete a mandatory physical site visit and submit their proposals by December 1, 2026. For bids of $25,000 or more, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone. Compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, Federal Contractor Minimum Wage standards, and FAR regulations regarding debarment disclosure for subcontracts exceeding $45,000 and FFATA reporting for contracts of $40,000 or more.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from The Ohio State University

Same awarding agency

NAICS: 236220
New
SLED
Wooster - Fisher Aud Renovation
Solicitation # RFQ-OSU-200473
The Ohio State University is seeking a Construction Manager at Risk for the renovation of the Fisher Auditorium building on the CFAES Wooster Campus to create the Campus Commons. The project involves renovating approximately 18,000 square feet of space to include a library, learning lab, bookstore, offices, food service, dining, and lounge areas, while maintaining the original auditorium. A potential 3,000 square foot addition on the north side is being considered to improve campus circulation and accessibility. The project requires a collaborative BIM-enabled environment following university standards, including specific use cases for model authoring, clash prevention, and asset tagging. The procurement process is divided into two stages, beginning with a qualifications-based RFQ to establish a short list of at least three candidates, followed by a best-value RFP stage considering both qualifications and fees. The selected CM will initially provide preconstruction services, including constructability reviews, target value budgeting, and schedule development, with the possibility of a contract amendment for full construction and closeout services. Key requirements include participation in the EDGE program, use of the e-Builder project management system, and adherence to university sustainability and safety standards. Preconstruction services are slated to begin in March 2027, with substantial completion of all work targeted for April 2029.
Commercial and Institutional Building Construction

POSTED

about 22 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238160
New
SLED
Harding Hospital - Roof 2 replacement
Solicitation # OSU-265568
The Ohio State University is seeking a Design-Build firm for project OSU-265568 to replace approximately 5,530 square feet of Roof 2 at Harding Hospital in Columbus, Ohio. The project involves replacing an existing EPDM roof with ballast on a concrete deck with a new 60 mil PVC roofing system. The scope includes ballast removal, roof tear-off, substrate repairs, insulation updates to meet current codes, and the installation of new coping and modified rooftop equipment. Because Harding Hospital provides behavioral health services, the selected contractor must implement rigorous site logistics, noise mitigation, and sequencing to ensure uninterrupted hospital operations. The project is expected to begin preconstruction in February 2027, with construction starting in June 2027 and substantial completion targeted for August 2027. The selection process is a two-stage approach, beginning with a qualifications-based Request for Qualifications to create a short list, followed by a best value Request for Proposal where a Competitive Guaranteed Maximum Price (GMP) will be requested. The Design-Build firm will be responsible for the entire project lifecycle, including schematic design, budgeting, and closeout via the e-Builder system. Key requirements include adherence to OSU Sustainability Standards, compliance with State prevailing wages, and participation in the EDGE Business Assistance Program. The selected firm must also comply with Wexner Medical Center policies regarding background checks and vaccinations and provide a comprehensive manufacturer-backed full-system roofing warranty upon completion.
Roofing Contractors

POSTED

about 22 hours ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS