Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Electrical Systems & Wiring

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Electrical Systems and Wiring involves performing electrical installation services for prime contractors on projects associated with the Riverside Public Utilities Water Division in Riverside, California. The scope of work includes the installation of wiring connections, receptacles, switches, accessible raceways, and metal-clad cables rated for 600V or less. Additionally, the contractor is responsible for installing stainless steel or neoprene gasketed weatherproof wall plates and ensuring all junction and pull boxes for Power, UPS, and Emergency Power systems are properly labeled. All work must be performed in strict compliance with NFPA 70 National Electrical Code standards and NRTL listings. The final deliverables consist of fully wired and labeled electrical systems accompanied by comprehensive as-built diagrams. This opportunity was posted on October 21, 2026, with a response deadline of November 24, 2026, under NAICS code 238210 for the City of Riverside.

General Info

Electrical installation subcontract for Riverside Public Utilities Water Division following NFPA 70 standards.

Documents

This scope was carved out of RPU-8289.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Site Modifications At The Palmyrita Water Treatment Plant For Pfas Removal

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Riverside
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical installation for prime contractors on Riverside Public Utilities (RPU) Water Division facility projects. Installs wiring connections, receptacles, switches, accessible raceways, and metal-clad cables (600V or less). Labels junction/pull boxes for Emergency Power, Power, and UPS systems and installs stainless steel or neoprene gasketed weatherproof wall plates. Complies with NFPA 70 (NEC) and NRTL listings. Delivers wired and labeled electrical systems with as-built diagrams.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency (IEUA) is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections on energized transformers under typical load, installing standardized external oil sampling devices to improve safety and access, and performing detailed oil testing analysis. Additionally, the contractor is responsible for evaluating nitrogen preservation systems to prevent oil oxidation and moisture intrusion, providing on-site training for up to 20 agency staff members, and developing comprehensive standard operating procedures. All work must adhere to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards, with thermography performed by ASNT Level 1 certified technicians or equivalent. The agency intends to make a single award to the most capable and cost-effective offeror, though it reserves the right to make multiple awards. Evaluation criteria include the offeror's experience with utilities or industrial facilities, the ability to provide both oil sampling and infrared inspections, the proposed staffing plan, and the fee structure. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as a Non-Collusion Statement and Workers' Compensation Certificate. The resulting contract will utilize fixed pricing with a not-to-exceed total value, and payments will be processed electronically via ACH within 30 days of invoice approval, with early payment discounts available for reductions of 1%, 2%, or 5%.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in 2 months
View Details
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves the inspection, functional testing, repair, and certification of emergency lighting systems across the facility to ensure full compliance with the National Life Safety Code (NFPA 101, 2024 Edition) and the National Electrical Code. The estimated contract value ranges between $25,000 and $100,000, with a required performance period of 30 business days following the written Notice to Proceed. Bids are due by December 1, 2026, and will be awarded based on overall best value. Mandatory requirements for submission include a physical site visit, a detailed cost breakout, and a completed supplier onboarding packet. For bids of $25,000 or more, contractors must provide a bid bond equal to 20% of the base bid, as well as performance and payment bonds from a surety with at least an A- rating. The contractor is responsible for all labor, materials, and equipment, and must adhere to Davis-Bacon Act prevailing wage rates, OSHA safety standards, and FAR regulations regarding small business certifications and debarment disclosures. Final acceptance is contingent upon a joint substantial completion inspection and the provision of manufacturer warranties and hazardous material disposal certificates.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → City of Riverside

Same awarding agency

NAICS: 237110
New
SLED
Site Modifications At The Palmyrita Water Treatment Plant For Pfas Removal
Solicitation # RPU-8289
The City of Riverside Public Utilities Department is soliciting bids for solicitation RPU-8289 to perform site modifications at the Palmyrita Water Treatment Plant for PFAS removal. The scope of work includes the construction of a prefilter system, booster pump station, electrical building, and emergency generator, as well as the furnishing and loading of IX media. Additional requirements include SCADA integration, programming, and the implementation of an identification system for vessels and piping. The project is subject to Build America Buy America and American Iron and Steel requirements, and the award will be granted to the lowest responsive and responsible bidder. Bids are due by November 24, 2026, and must be submitted electronically via the designated bidding website. Required documentation includes a bid bond of at least 10 percent of the bid amount, a non-collusion declaration, and specific technical data for the IX system, such as resin breakthrough projections and layout drawings. The contractor must adhere to California prevailing wage laws and Davis-Bacon requirements, providing weekly certified payrolls. Performance and payment bonds totaling 100 percent of the contract price are required. Operational constraints include a prohibition on treatment plant shutdowns between March 1 and November 1, with any approved shutdowns requiring a plan submitted three weeks in advance. Equipment delivery is restricted to within one month of installation unless authorized by the Engineer. Final system acceptance is contingent upon successful performance for a three-week period following installation and final inspection. Payment is based on progress applications that must include up-to-date as-built drawings, certified payroll records, and a schedule of values.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 238160
New
SLED
Wash, Repair And Re-Coat The Metal Roof Over The Fire Apparatus Maintenance Facility At The City Of Riverside Corporation Yard
Solicitation # 8263
The City of Riverside is soliciting bids for the washing, repair, and re-coating of the metal roof at the Fire Apparatus Maintenance Facility located at the Corporation Yard. The project scope includes thorough cleaning, demolition, sealing penetrations, and the application of a fluid-applied roofing restoration system using Cool-Sil products. All work must be completed within 60 calendar days from the Notice to Proceed. The project is estimated at 130,000 dollars and includes a 30,000 dollar allowance for unforeseen conditions. Bidders must hold a valid California C-39 Roofing Contractor License and adhere to the 2021 Standard Specifications for Public Works Construction. The contract will be awarded to the lowest responsive and responsible bidder. Submission requirements include electronic bids due by November 4, 2026, and a mandatory 10 percent bid security provided via a notarized City-approved bond or certified check. Awarded contractors must provide performance and payment bonds, maintain on-site supervision, and comply with California Labor Code Section 1720 prevailing wage rates and DIR registration. Quality assurance requires daily inspections by a manufacturer's representative and a final written acceptance from the roofing system manufacturer. Materials must be stored according to strict temperature and environmental guidelines to ensure warranty compliance.
Roofing Contractors

POSTED

7 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS