Site Modifications At The Palmyrita Water Treatment Plant For Pfas Removal

Active
20261021041State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Riverside Public Utilities Department is soliciting bids for solicitation RPU-8289 to perform site modifications at the Palmyrita Water Treatment Plant for PFAS removal. The scope of work includes the construction of a prefilter system, booster pump station, electrical building, and emergency generator, as well as the furnishing and loading of IX media. Additional requirements include SCADA integration, programming, and the implementation of an identification system for vessels and piping. The project is subject to Build America Buy America and American Iron and Steel requirements, and the award will be granted to the lowest responsive and responsible bidder. Bids are due by November 24, 2026, and must be submitted electronically via the designated bidding website. Required documentation includes a bid bond of at least 10 percent of the bid amount, a non-collusion declaration, and specific technical data for the IX system, such as resin breakthrough projections and layout drawings. The contractor must adhere to California prevailing wage laws and Davis-Bacon requirements, providing weekly certified payrolls. Performance and payment bonds totaling 100 percent of the contract price are required. Operational constraints include a prohibition on treatment plant shutdowns between March 1 and November 1, with any approved shutdowns requiring a plan submitted three weeks in advance. Equipment delivery is restricted to within one month of installation unless authorized by the Engineer. Final system acceptance is contingent upon successful performance for a three-week period following installation and final inspection. Payment is based on progress applications that must include up-to-date as-built drawings, certified payroll records, and a schedule of values.

General Info

Riverside seeks bids for PFAS removal site modifications at Palmyrita Water Treatment Plant.

Place of Performance

Riverside, CA, 92507, USA

Set-Aside

NONE

Documents

3

Bid No. RPU-8289: Site Modifications at Palmyrita WTP for PFAS Removal

PDF, High priority: read this firstspecifications
High

City of Riverside - Palmyrita WTP PFAS Removal Technical Specifications

PDF, High priority: read this firstspecifications
High

City of Riverside RFB RPU-8289: Site Modifications at the Palmyrita Water Treatment Plant for PFAS Removal

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Riverside
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Bid #RPU-8289: $19

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves comprehensive wastewater infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of 20-inch ductile iron force main and significant improvements to the Morgans Branch Pumping Station. Key station upgrades include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers and manholes, with a total project estimate of 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MBE/WBE compliance, including an EPA MBE participation goal of 10.9 percent. Bidders must provide a completed EJCDC C-410 Bid Form, bid security, and evidence of authority to sign. The successful contractor will be required to provide performance and payment bonds and maintain proof of insurance. Performance is subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment terms are set at thirty days after presentation to the owner, and the work must adhere to strict technical standards, including AWS D1.2 for welding and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of small and large diameter steel and ductile iron pipes and associated supports. Additional requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and the replacement of motor control center components. The project also encompasses electrical and instrumentation improvements, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is specifically targeting DBE, MBE, WBE, and SBE subcontractors, with a focus on services such as lead abatement, metals fabrication, painting, coatings, and trucking. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions to these documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 26 days
View Details

More opportunities from California → City of Riverside

Same awarding agency

NAICS: 238160
New
SLED
Wash, Repair And Re-Coat The Metal Roof Over The Fire Apparatus Maintenance Facility At The City Of Riverside Corporation Yard
Solicitation # 8263
The City of Riverside is soliciting bids for the washing, repair, and re-coating of the metal roof at the Fire Apparatus Maintenance Facility located at the Corporation Yard. The project scope includes thorough cleaning, demolition, sealing penetrations, and the application of a fluid-applied roofing restoration system using Cool-Sil products. All work must be completed within 60 calendar days from the Notice to Proceed. The project is estimated at 130,000 dollars and includes a 30,000 dollar allowance for unforeseen conditions. Bidders must hold a valid California C-39 Roofing Contractor License and adhere to the 2021 Standard Specifications for Public Works Construction. The contract will be awarded to the lowest responsive and responsible bidder. Submission requirements include electronic bids due by November 4, 2026, and a mandatory 10 percent bid security provided via a notarized City-approved bond or certified check. Awarded contractors must provide performance and payment bonds, maintain on-site supervision, and comply with California Labor Code Section 1720 prevailing wage rates and DIR registration. Quality assurance requires daily inspections by a manufacturer's representative and a final written acceptance from the roofing system manufacturer. Materials must be stored according to strict temperature and environmental guidelines to ensure warranty compliance.
Roofing Contractors

POSTED

7 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS