Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Industrial Painting & Protective Coatings

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Industrial Painting and Protective Coatings involves providing specialized coating systems for prime contractors working on Riverside Public Utilities Water Division facility projects in Riverside, California. The scope of work includes surface preparation and the application of prime, intermediate, and finish coats to buried, exposed, and submerged metal, specifically utilizing organic zinc primers and Cashew 9225 color for vessels and piping. Additionally, the contractor is responsible for installing polyethylene identification tape and ANSI A 13.1 pipe markers while ensuring all operations comply with SCAQMD standards. The opportunity is managed by the City of Riverside under NAICS code 238320. Interested parties must submit their responses by the deadline of November 24, 2026. The final deliverables for this contract include the delivery of fully coated and identified structural steel and piping.

General Info

Industrial painting and protective coatings for Riverside Public Utilities projects due November 24, 2026.

Place of Performance

Riverside, CA, 92507, USA

Set-Aside

NONE

Documents

This scope was carved out of RPU-8289.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Site Modifications At The Palmyrita Water Treatment Plant For Pfas Removal

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Riverside
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Applies painting and coating systems for prime contractors on Riverside Public Utilities (RPU) Water Division facility projects. Prepares surfaces and applies prime, intermediate, and finish coats to submerged, exposed, and buried metal. Applies organic zinc primers and Cashew #9225 color to piping and vessels. Installs ANSI A 13.1 pipe markers and polyethylene identification tape. Complies with SCAQMD standards. Delivers coated and identified piping and structural steel.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Riverside

Same awarding agency

NAICS: 237110
New
SLED
Site Modifications At The Palmyrita Water Treatment Plant For Pfas Removal
Solicitation # RPU-8289
The City of Riverside Public Utilities Department is soliciting bids for solicitation RPU-8289 to perform site modifications at the Palmyrita Water Treatment Plant for PFAS removal. The scope of work includes the construction of a prefilter system, booster pump station, electrical building, and emergency generator, as well as the furnishing and loading of IX media. Additional requirements include SCADA integration, programming, and the implementation of an identification system for vessels and piping. The project is subject to Build America Buy America and American Iron and Steel requirements, and the award will be granted to the lowest responsive and responsible bidder. Bids are due by November 24, 2026, and must be submitted electronically via the designated bidding website. Required documentation includes a bid bond of at least 10 percent of the bid amount, a non-collusion declaration, and specific technical data for the IX system, such as resin breakthrough projections and layout drawings. The contractor must adhere to California prevailing wage laws and Davis-Bacon requirements, providing weekly certified payrolls. Performance and payment bonds totaling 100 percent of the contract price are required. Operational constraints include a prohibition on treatment plant shutdowns between March 1 and November 1, with any approved shutdowns requiring a plan submitted three weeks in advance. Equipment delivery is restricted to within one month of installation unless authorized by the Engineer. Final system acceptance is contingent upon successful performance for a three-week period following installation and final inspection. Payment is based on progress applications that must include up-to-date as-built drawings, certified payroll records, and a schedule of values.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 238160
New
SLED
Wash, Repair And Re-Coat The Metal Roof Over The Fire Apparatus Maintenance Facility At The City Of Riverside Corporation Yard
Solicitation # 8263
The City of Riverside is soliciting bids for the washing, repair, and re-coating of the metal roof at the Fire Apparatus Maintenance Facility located at the Corporation Yard. The project scope includes thorough cleaning, demolition, sealing penetrations, and the application of a fluid-applied roofing restoration system using Cool-Sil products. All work must be completed within 60 calendar days from the Notice to Proceed. The project is estimated at 130,000 dollars and includes a 30,000 dollar allowance for unforeseen conditions. Bidders must hold a valid California C-39 Roofing Contractor License and adhere to the 2021 Standard Specifications for Public Works Construction. The contract will be awarded to the lowest responsive and responsible bidder. Submission requirements include electronic bids due by November 4, 2026, and a mandatory 10 percent bid security provided via a notarized City-approved bond or certified check. Awarded contractors must provide performance and payment bonds, maintain on-site supervision, and comply with California Labor Code Section 1720 prevailing wage rates and DIR registration. Quality assurance requires daily inspections by a manufacturer's representative and a final written acceptance from the roofing system manufacturer. Materials must be stored according to strict temperature and environmental guidelines to ensure warranty compliance.
Roofing Contractors

POSTED

7 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS