Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Electronic Payroll Compliance Reporting

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

State of California, Department of TransportationView Agency

NAICS

541611 - Administrative Management and General Management Consulting ServicesView NAICS

Place of Performance

Los Molinos, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 06-0H22U4.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction On State Highway In Madera County Near Madera From San Joaquin River Bridge To 0.6 Mile North Of Avenue 12 Overcrossing

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyState of California, Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
State of California, Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Submit certified payroll records electronically via LCPtracker Pro to ensure compliance with prevailing wage laws.

Similar Contracts

Same NAICS industry code

More opportunities from State of California, Department of Transportation

Same awarding agency

NAICS: 237310
SLED
Construction On State Highway In Madera County Near Madera From San Joaquin River Bridge To 0.6 Mile North Of Avenue 12 Overcrossing
Solicitation # 06-0H22U4
The project involves the construction and rehabilitation of approximately 8 miles of State Highway 99 in Madera County, California, extending from the San Joaquin River Bridge to 0.6 mile north of the Avenue 12 overcrossing. Work includes roadway excavation, placement of Hot Mix Asphalt, Rubberized Hot Mix Asphalt, and Class 2 Aggregate Base, along with installation and removal of concrete and temporary barriers, Midwest Guardrail Systems and associated end treatments. Drainage improvements require installation and abandonment of culverts, drainage inlets, and rock slope protection. Several bridges and overcrossings, including Little Dry Creek Bridge, will undergo barrier replacement and structural work. Extensive traffic control measures, including ramp and lane closures, are necessary to ensure safety during construction. The contract is issued by the California Department of Transportation under solicitation number 06-0H22U4, with an estimated value of $85 million and a bid submission deadline of September 3, 2026. Performance is expected to commence within 55 days of contract approval, with liquidated damages applying for missed milestones. Work must adhere to Caltrans specifications including Sections 12-3.11, 87-19, and 52-4.01D, as well as ASTM and NTCIP standards for equipment and materials. The contract mandates the use of specified slurry products, Buy America compliance, and requires all certified payroll submissions through LCPtracker Pro. Special requirements include the on-site presence of a certified Safety Quality Control Manager with a Cal/OSHA 30-hour or OSHA 510 certification responsible for maintaining the Site-Specific Safety Plan. The contractor must coordinate with utility providers including PG&E and AT&T, and with Union Pacific Railroad for impacted operations. Temporary staging areas may be leased on Parcels 86534-01-01 and 86535-1. All materials and systems, including portable changeable message signs and lighting, must comply with source quality assurance testing conducted at the manufacturer’s facility before delivery. Electronic submissions are required through the designated portal, and payment processing is managed via Caltrans systems with strict timelines for subcontractor and supplier payments. The award is expected to follow a Lowest Price Technically Acceptable methodology, where technical acceptability is verified through compliance checks and the lowest responsive bid is selected without trade-off analysis. No formal FAR clauses apply, as this is a state-led infrastructure project governed
Highway, Street, and Bridge Construction

POSTED

about 1 month ago

DEADLINE

in 7 days
View Details