Elevator Design and Preconstruction Engineering

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Elevator Design and Preconstruction Engineering involves providing professional engineering and design services for elevator system repairs at California State University, Fresno. The selected provider will be responsible for developing comprehensive design plans, conducting constructability reviews, and coordinating with regulatory agencies to secure necessary Campus Building Permits. Key deliverables include final design documents, detailed constructability reports, and approved building permits. To qualify for this engagement, the provider must hold a valid California Professional Engineer license. The solicitation was posted on October 16, 2026, with a response deadline of November 24, 2026. This project falls under NAICS code 541330 and is managed through the state of California's procurement system.

General Info

Engineering and design services for elevator repairs at California State University, Fresno.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 2627-03.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Request for Qualifications - Task Order Construction Agreement - General Construction

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → CSU, Fresno
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → CSU, Fresno
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provides professional engineering and design services for elevator system repairs for prime contractors on California State University, Fresno facility projects. Develops design plans, performs constructability reviews, and coordinates with regulatory agencies to obtain Campus Building Permits. Requires a California Professional Engineer (PE) license. Delivers final design documents, constructability reports, and approved building permits.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Cooper City Stormwater Master Plan (H1470 | 4673-305-P14)
Solicitation # RFQ2026-2
The City of Cooper City, Florida, issued solicitation RFQ2026-2 to secure a consultant for the development of a comprehensive, grant-compliant Stormwater Master Plan (SWMP). Funded through the FEMA Hazard Mitigation Grant Program (HMGP), the project aims to improve the understanding of existing infrastructure, identify high-risk flooding areas, and assess water-quality practices to inform long-term capital improvement planning and increase flood resiliency. The scope is divided into two primary tasks: the creation of a preliminary SWMP based on initial flood modeling and the finalization of a completed SWMP for adoption into the Local Mitigation Strategy, with a total project fee of 281,000 dollars. Proposals must be submitted via the OpenGov Procurement Portal by November 30, 2026. The selection process is points-based, evaluating team qualifications, past experience, methodology, and staffing availability, with a potential second tier involving oral presentations. Awarded consultants must adhere to strict federal and state requirements, including the Davis-Bacon Act for prevailing wages, E-Verify, and certifications regarding scrutinized companies. The contract includes mandatory compliance with FEMA and FDEM regulations, and payments are processed within 45 days of receiving a proper invoice in accordance with the Florida Local Government Prompt Payment Act.
Utilities

POSTED

about 11 hours ago

DEADLINE

in 25 days
View Details
NAICS: 541330
New
SLED
Public Safety Training Center Roadway and Levee
Solicitation # 2026-GEN-00109
The Hamilton County Board of Commissioners is seeking Statements of Qualifications from Architectural and Engineering firms to provide professional design and engineering services for the Roadway and Levee Repair Project at the Public Safety Training Center in Noblesville, Indiana. The scope of work includes civil, geotechnical, and environmental engineering, topographic and boundary surveying, and the preparation of federal, state, and local permit applications. The ultimate goal is the delivery of a complete Plans, Specifications, and Estimates package ready for bidding and construction. This project may be eligible for federal-aid reimbursement through the FEMA Public Assistance Program, with funding administered by the Indiana Department of Homeland Security. Selection is based on a qualifications-based method consistent with 2 CFR 200.320(b)(2)(iv) and FEMA requirements, meaning price is not a factor in the evaluation or ranking of firms. Respondents are explicitly forbidden from providing cost information in their submissions. Evaluation is based on firm qualifications and availability, past performance on related projects over the last five years, project approach and timeline, and references. Qualified firms must submit their SOQs via the County eProcurement portal by November 9, 2026. The contract incorporates strict federal compliance standards, including the Davis-Bacon Act for prevailing wages, Title VI of the Civil Rights Act, and various non-discrimination and equal employment opportunity mandates. Required submission documents include a cover letter, firm description, and several certifications, such as Non-Lobbying, Debarment and Suspension, Non-Collusion, and E-Verify affidavits. Once the most qualified firm is ranked and selected, the County will enter into negotiations to establish a fair and reasonable price.
Buildings and Grounds

POSTED

about 11 hours ago

DEADLINE

in 4 days
View Details
NAICS: 541330
New
SLED
RFSOQ for Electrical Support
Solicitation # 26-196
The Tarrant Regional Water District is soliciting Statements of Qualifications for an Indefinite Delivery/Indefinite Quantity contract to provide electrical engineering support, owner's agent services, and electrical equipment acceptance testing. The scope of work is divided into functional categories, including reviewing electrical designs, providing engineering for internal maintenance and small Capital Improvement Projects, conducting energy audits, and performing acceptance testing for medium voltage cables, transformers, switchgear, VFDs, and MCCs. These services will support numerous projects across Texas, including pump stations, switching stations, and various facility improvements such as the BB1 Backup Power Project and the Waxahachie Oncor Transmission Upgrade Project. Selection is based on Qualifications-Based Selection Criteria, with scoring weighted toward the experience and qualifications of proposed personnel at 50 percent, the firm's prior experience and past performance at 30 percent, and staff commitment and schedule at 20 percent. The District may interview up to three top-ranked firms before making an award, and multiple vendors may be selected. Submissions must be limited to 16 pages and include a completed Conflict of Interest Questionnaire and confirmation of required insurance. The extended deadline for proposal submission is November 20, 2026, at 2:00 pm.
Infrastructure Engineering

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541330
New
International
Request for Proposals for Professional Consultant Services Required for the Citywide Flow Monitoring Program Implementation - Phase 2
Solicitation # C11-22-26
The City of Hamilton has issued solicitation C11-22-26 for professional consultant services to implement Phase 2 of its Citywide Flow Monitoring Program. The selected consultant will be responsible for providing all labor, materials, supervision, and equipment necessary to install and eventually remove flow monitoring equipment at ninety sites within the city's sanitary and combined servicing areas. Key requirements include managing data quality for all data sets, providing flow monitoring deliverables, and conducting monthly site inspection and maintenance visits to ensure equipment functionality. The consultant must also provide an installation report featuring documentation and photographs for each location and restore all sites to their pre-installation condition upon demobilization. The project requires the submission of a project management plan, a project-specific health and safety plan, and traffic control plans. Mobilization and installation must begin within 30 days of the project award. Monthly invoices are to be submitted to the City's Project Manager, with Stephanie Spada serving as the Procurement Specialist. Proposals must be submitted electronically via the City's Bidding System by December 3, 2026, at 3:00 PM Hamilton time, as hardcopy submissions will not be accepted. All inquiries must be submitted through the bidding portal no later than three business days before the closing deadline.
City of Hamilton

POSTED

about 12 hours ago

DEADLINE

in 29 days
View Details
NAICS: 541330
New
SLED
Snapfinger Advanced Wastewater Treatment Facility Expansion - Phase 3E - Design and Engineering Services During Construction
Solicitation # 2026-135-RFP
The County of DeKalb, Georgia, is soliciting proposals for design and engineering services for Phase 3E of the Snapfinger Advanced Wastewater Treatment Facility Expansion. This project, part of a 4.27 billion dollar Capital Improvement Projects Program, involves adding a primary solids handling unit process and modifying the dewatering centrifuge process to support a permitted capacity of 54 MGD MMADF. Utilizing a design-bid-build delivery method, the scope is divided into five primary tasks: project management, design, bid phase, construction, and post-construction services. The selected engineer will be responsible for providing complete design documents, managing permits, and conducting site visits to ensure work aligns with contract documents and DeKalb County Department of Watershed Management standards. Proposals must be submitted electronically via the County's eProcurement Portal by 3:00 p.m. ET on January 20, 2027, consisting of separate technical and cost uploads. Qualified firms must demonstrate experience completing at least three projects of similar scale within the last ten years. The contract includes a performance period of 3,014 days, with an absolute termination date of December 31, 2035. Award decisions are based on a points-based evaluation of team qualifications, project approach, and Local Small Business Enterprise participation. Additionally, the contract is subject to Davis-Bacon prevailing wage requirements and the DeKalb County First Source Jobs Ordinance, which encourages the hiring of local residents.
Purchasing & Contracting

POSTED

about 13 hours ago

DEADLINE

in 3 months
View Details

More opportunities from California → CSU, Fresno

Same awarding agency

NAICS: 236220
SLED
Request for Qualifications - Task Order Construction Agreement - General Construction
Solicitation # 2627-03
California State University, Fresno is seeking Statements of Qualifications from qualified general contractors for a three-year Task Order-Construction Agreement Master Enabling Agreement focused on elevator repairs across multiple campus buildings. The total maximum budgeted cost for the portfolio is 2,880,000 dollars, with no single project exceeding 400,000 dollars. The scope includes providing Design-Build, Collaborative Design-Build, and Construction Manager at Risk services, encompassing preconstruction, design management, procurement, and construction. Specific identified projects include repairs at McLane Hall, Grosse Industrial Tech Building, Engineering East Building, Valley Children's Stadium, and the Music Building, with a provision for additional projects up to 20 percent of the total value. The selection process is a two-step method consisting of an initial RFQ to shortlist the four highest-scoring firms, followed by an RFP stage involving proposals and interviews. Mandatory requirements for respondents include a California C-11 license, a CSU prequalification rating of at least 1,500,000 dollars, and the submission of a signed Skilled and Trained Workforce Agreement per PCC 2600. Contractors must comply with prevailing wage laws and subcontract a minimum of 3 percent of the project to Disabled Veteran Business Enterprises. Submissions must include five physical copies and one digital PDF copy delivered to the Managing Office by the specified deadline.
Commercial and Institutional Building Construction

POSTED

20 days ago

DEADLINE

in 20 days
View Details
NAICS: 238290
SLED
Request for Qualifications - Task Order Construction Agreement - Elevator Repairs
Solicitation # 2627-03
California State University, Fresno is seeking Statements of Qualifications from general contractors with a C-11 license to establish a three-year Task Order-Construction Agreement for Multiple Projects Master Enabling Agreement. The contract covers design-build, collaborative design-build, and construction manager at risk services for a portfolio of elevator repair projects across campus, including McLane Hall, the Music Building, and Valley Children’s Stadium. The total budget for all projects is not to exceed 3,000,000 dollars, with a maximum budgeted cost of 400,000 dollars per individual project. The agreement utilizes a two-phase approach consisting of Task Order Service Agreements for design and preconstruction, followed by Task Order Construction Agreements for the construction phase using lump sum or guaranteed maximum price pricing. The selection process is a two-step method starting with the evaluation of Statements of Qualifications, where the top four firms will be shortlisted to proceed to a Request for Proposals phase. Evaluation criteria include unique qualifications, cost and schedule processes, local experience within 50 miles, use of LEAN project management tools, and experience with Disabled Veteran Business Enterprises. Mandatory requirements for respondents include registration with the Department of Industrial Relations, compliance with prevailing wage laws, and adherence to the skilled and trained workforce requirements of PCC 2600. Statements of Qualifications must be submitted by November 24, 2026, and must include a signed Skilled and Trained Workforce Agreement and a CSU prequalification letter containing the firm's composite safety score.
Other Building Equipment Contractors

POSTED

20 days ago

DEADLINE

in 20 days
View Details
NAICS: 238210
SLED
Request for Qualifications - Task Order Construction Agreement - Fire Alarms
Solicitation # 2627-02
California State University, Fresno is seeking Statements of Qualifications from licensed general contractors to establish a three-year Task Order-Construction Agreement for Multiple Projects Master Enabling Agreement. The contract covers the design, preconstruction, and construction of a portfolio of fire alarm system replacement projects, specifically targeting the Music, McLane Hall, Engineering East, and Conley Art buildings, along with other potential projects. The selected contractor will provide Design-Build, Collaborative Design-Build, and Construction Manager at Risk services, utilizing either Lump Sum or Guaranteed Maximum Price pricing. The total budget for all projects is not to exceed 1,500,000 dollars, with a maximum limit of 200,000 dollars per individual project. Qualified respondents must hold a California B or C-10 license and be prequalified with the CSU Office of the Chancellor. Evaluation is based on a points system considering project experience from the last five years, design coordination capabilities, the firm's Composite Weighted Score from their prequalification letter, and their experience utilizing Disabled Veteran Business Enterprises, with a minimum 3 percent DVBE subcontracting requirement. Submissions must include a signed Skilled and Trained Workforce Agreement and a CSU prequalification letter containing a Composite Safety Score. Statements of Qualifications are due by November 24, 2026, at 14:00.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

20 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS