Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 5, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Elevator Modernization, Laboratory Wing, AAFC Saskatoon Research and Development Centre

Closed
465-1-28-C49International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation (MTC) is soliciting bids for the installation of panic hardware on electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The project encompasses five specific locations, including the cafeteria, men's and women's dorms, recreation center, and vocational building. The scope of work requires the contractor to conduct site surveys, procure heavy-duty Grade I commercial-grade panic bars and matching hardware, and perform installations that ensure doors open in the direction of exit travel under simple pressure. All work must comply with NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and the Americans with Disabilities Act (ADA). Final acceptance is contingent upon the successful completion of at least 10 consecutive cycle tests to verify fail-safe operation. This is a fee-for-service subcontracting opportunity set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Bidders must be licensed in the state of Idaho and provide three references for projects of similar scope. Required submission documents include a completed bid sheet, a W-9, a supplier self-certification form, and SBA certification letters where applicable. All proposals must be emailed to Sandra Clore by December 1, 2026, at 3:00pm MST. The contract is subject to various federal regulations, including FAR 52.222-4 regarding safety standards and Davis-Bacon Act prevailing wage rates for building construction in Canyon and Gem Counties, Idaho.
Management & Training Corporation/Centennial Job Corps Center

POSTED

28 minutes ago

DEADLINE

in about 1 month
NAICS: 238290
New
SLED
Districtwide Elevator And Wheelchair Lift Service, Preventive Maintenance, And Repairs Maintenance Services
Solicitation # 27.004
The Hayward Unified School District is soliciting bids under solicitation number 27.004 for districtwide elevator and wheelchair lift service, preventive maintenance, and repairs. The selected contractor will be responsible for the systematic examination, maintenance, and repair of all owned or leased systems, including hydraulic, electrical, and mechanical components, to ensure they remain in safe and usable condition. This contract requires the provider to hold an active C-11 Elevator Contractor license from the State of California and comply with all local and state codes, including Title 24 of the California Code of Regulations. The award will be granted to the lowest responsive and responsible bidder based on the rates provided in the bid form. Performance of regular services typically occurs Monday through Friday during standard business hours, while emergency repairs must be available 24 hours a day, seven days a week. The contractor must provide a bid bond of at least 10 percent of the bid amount and subsequently provide payment and performance bonds upon award. Invoicing is conducted monthly, with a requirement that authorized materials be invoiced at no more than 15 percent above the vendor's cost. Key compliance requirements include paying prevailing wages per the California Labor Code, submitting to fingerprinting and felony conviction certifications, and maintaining a minimum one-year warranty on work. All contracts are governed by the laws of the State of California.
Hayward Unified School District

POSTED

about 4 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

Agriculture and Agri-Food Canada is seeking a contractor for the modernization of the traction elevator located in the laboratory wing of the Saskatoon Research and Development Centre. The project requires the replacement of all major components, including wiring, the gearless traction machine, sheaves, landing systems, controllers, and interior fixtures, to ensure compliance with ASME A17.1/CSA B44-2013 safety and reliability codes. There is an optional secondary scope of work involving the modernization of a hydraulic elevator in the building's front lobby, which would include the replacement of the power pack, hydraulic cylinder, and associated electrical and interior components. The selection process is conducted in two phases, where Phase One evaluates the qualifications and experience of bidders and Phase Two focuses on pricing for those deemed responsive. The required Phase One work must be completed by March 15, 2024, while any optional Phase Two work must be finished by March 15, 2025. Bids must be submitted electronically in PDF format to the designated procurement email address, adhering to a strict 5MB file size limit and specific subject line requirements.

General Info

Modernize traction elevator in Saskatoon; optional hydraulic elevator upgrade; two-phase selection process.

Documents

1

ITT 465-1-28-C49: Elevator Modernization, Laboratory Wing, AAFC Saskatoon R&D Centre

PDF, High priority: read this firstitt
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Agriculture and Agri-Food Canada
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Desta KissackPoint of Contact

Full Description

Show more
Elevator Modernization, Laboratory Wing, AAFC Saskatoon Research and Development Centre Description: Agriculture and Agri-Food Canada (AAFC) intends to retain a Contractor to provide construction services for the modernization of the traction elevator in the laboratory wing of Saskatoon Research and Development Centre. All major components will be replaced to increase the safety and reliability of the elevator. The elevator will be upgraded to meet ASME A17.1/CSA B44-2013 code. This will include (but may not be limited to): a. All wiring and travellers b. Gearless Traction machine c. Sheaves d. Landing system e. Controller, Operating Panels and other electrical components f. Fixtures, buttons, interior panels, flooring and g. Door operator, interlock and pickup rollers Optional work under this contract may include the construction services for the modernization of the hydraulic elevator in the front lobby of the same building at Saskatoon Research and Development Centre. All major components would be replaced to increase the safety and reliability of the elevator. The elevator would be upgraded to meet ASME A17.1/CSA B44-2013 code. This will include (but may not be limited to): a. All wiring and travellers b. Power pack including pump, motor and valve c. Hydraulic cylinder and buffers d. Controller, Operating Panels and other electrical components e. Fixtures, buttons, interior panels, flooring and f. Door operator, interlock and pickup rollers Basis of selection: This is a two phase selection process. Bidders responding to this ITT are to submit a bid in two phases. Phase One bids cover only the qualifications and experience of the Bidders, refer to SI05 ‘Submission of Bid’. Following evaluation of Phase One bids, Bidders are advised of their competitive standing and responsive Phase One Bidders will be invited to submit a Phase Two bid. Phase Two bids cover the pricing. A combination of the Phase One and Phase Two submissions constitutes the final bid. Initially, suppliers are invited to submit bids in the first phase of the selection procedure. Only the Phase One information asked for in the ITT is to be included in Phase One bids, and evaluation of Phase One bids will be carried out only on the Phase One information requested. Construction Time: The Contractor must perform and complete the Required Phase 1 Work by March 15, 2024 from the date of contract award. The Contractor must perform and complete the Optional Phase 2 Work by March 15, 2025 from the date of contract award. Phase One submission of bid 1. The Phase One electronic bid shall be submitted in one electronic file in PDF format. 2. The Phase One electronic bid shall be submitted by email only to the Bid Receiving email address (contact@example.gov) on the front page of the "Invitation to Tender". The electronic bid must be received on or before the date and time set for the Phase One solicitation closing. The Bidder must ensure the subject line of the email identifies the electronic Phase One bid submission, and should include at minimum the solicitation number. The Bidder should ensure that the following information is included in the main body of the Phase One electronic bid submission email: a. Solicitation number; b. Name of Contracting Authority; c. Bidder name and contact information (contact name, contact email, contact telephone number); d. Bidder return address; and e. Phase One solicitation closing date and time. 3. The Phase One Qualifications Form, and any required associated document(s), shall be in PDF format. The Bidder should ensure that the following information is included in the electronic title of the Phase One Qualification Form PDF document and in the body of the Qualification Form PDF document: a. PHASE ONE QUALIFICATIONS; b. Solicitation number; and c. Name of Bidder. 4. Bids sent in hard copy or transmitted by facsimile will not be accepted. 5. Electronic submissions: Timely and correct delivery of electronic bids is the sole responsibility of the Bidder. a. Canada will not be responsible for any failure attributable to the email transmission or email receipt of the bid including, but not limited to, the following: i. receipt of a garbled or an incomplete bid; ii. delay in the email transmission or email receipt of the bid to the Bid Receiving (contact@example.gov) e-mail inbox (the date & time on the email received by the Bid Receiving email inbox is considered the date & time of receipt of the bid submission); iii. failure of the Bidder to properly identify the bid and RFP number in the email subject line and in the electronic Bid Documents; iv. illegibility of the bid; v. AAFC server blocking emails and/or attachments (such as potential malware, file size, file formats (unacceptable file formats include, but are not limited to, .zip, .exe, .mp3, etc.); vi. Security of bid data. b. Bids transmitted via email constitutes the formal bid submission. AAFC has restrictions on incoming email messages. The maximum email message size including all file attachments must not exceed 5MB. Zip/exe/mp3 files or links to Bid Documents will not be accepted. Incoming email messages exceeding the maximum file size and/or containing zip/exe/mp3 file attachments will be blocked from entering AAFC’s email system. A bid transmitted by email that gets blocked by AAFC’s email system will be considered not received. It is the responsibility of the Bidder to ensure receipt. Refer to the attached tender documents to obtain further information. The Crown retains the right to negotiate with any supplier on any procurement. Documents may be submitted in either official language of Canada.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS