Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Elimination of the Use of Upper Miocene Canal and Alternate Point of Measurement for Delivery of PG&E Non-Project Water to California Water Service

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project titled Elimination of Use of Upper Miocene Canal and Alternate Point of Measurement for the Delivery of PG&E Non-Project Water to the California Water Service Oroville District Treatment Plant involves a modification to the existing SWPAO Agreement #17021 between the County of Butte and the Department of Water Resources. Originally established to deliver water from Pacific Gas and Electric to the California Water Service Company via Lake Oroville, the delivery method was disrupted when the 2018 Camp Fire destroyed a portion of the Miocene Canal. To address this emergency, an agreement was amended to allow for the diversion of approximately 3,000 acre-feet of non-project water from the Upper Miocene Canal via a spillgate into the West Branch of the Feather River. This project seeks to permanently eliminate the use of the Upper Miocene Canal for this conveyance by allowing the water to remain in the West Branch of the Feather River and flow directly into Lake Oroville without diversion. Under the proposed plan, water measurement will transition from the canal to an existing California Data Exchange Center gauge, specifically the WFR Gauge, located downstream of the Miocene Canal Head Dam. This project utilizes existing facilities and has been designated as a categorical exemption because it involves the operation of existing facilities with negligible or no expansion to provide public services. The continued delivery of this water is critical for the California Water Service Oroville District, which provides domestic water service to approximately 75 percent of the residents in the City of Oroville. The extended term for this temporary diversion and the associated water conveyance agreement is set to continue through December 2027.

General Info

Amends agreement to permanently reroute water delivery to Oroville via Feather River through 2027.

Agency

California → Butte County

NAICS

221310 - Water Supply and Irrigation SystemsView NAICS

Place of Performance

Various, Oroville, CA, 95965

Set-Aside

NONE

Documents

(1)

Elimination of Use of Upper Miocene Canal for PG&E Non-Project Water Delivery

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Butte County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Butte County
Office AddressN/A
Contacts
Arian ZamanianSenior Engineer

Full Description

Show more
In 2017, the County of Butte entered into an Agreement (SWAPO #17021) with the Department of Water Resources (DWR) to utilize Lake Oroville, a State Water Project facility, to deliver water from Pacific Gas & Electric (PG&E) to the California Water Service Company (CWS) Oroville District. On November 14, 2017, the Butte County Board of Supervisors adopted a Negative Declaration for the project (Resolution No. 17-193). The Negative Declaration and the Agreement specified that the delivery to Lake Oroville would occur at PG&E’s Lime Saddle Powerhouse from the Miocene Canal. The Camp Fire incident, November 8, 2018, destroyed the middle portion of the Miocene Canal which prevented water from being delivered to the Lime Saddle Powerhouse. Due to the State of Emergency resulting from the Camp Fire (Executive Order B57-18), DWR and Butte County temporarily amended the Agreement to allow the CWS to redirect approximately 3,000 acre-feet of its 33,000 acre-feet contract PG&E water from the Upper Miocene Canal via a spillgate to the West Branch of the Feather River (Figure 2 - Upper Miocene Head Dam and Spillgate Location) through to Lake Oroville into the Thermalito Power Canal, and to CWS’s Filtration Plant (Water Treatment Plant – WTP). On December 14, 2021 the Butte County Board of Supervisors directed staff to extend the existing agreement to continue to allow for the diversion of water from Upper Miocene Canal spillgate into the West Branch of the Feather River for the duration of the original agreement (2018-2027). The extended agreement went into effect on January 1, 2022. PG&E is proposing to discontinue use of the Upper Miocene Canal for the conveyance and measurement of non-project water. The proposed project is to allow the non-project water that is delivered to CWS to remain in the West Branch of the Feather River continuing past the Miocene Canal Head Dam (where it would have been diverted into the Upper Miocene Canal) and continue down into Lake Oroville without any diversion. The non-project water would be measured by an existing California Data Exchange Center (CDEC) Gauge WFR (Figure 3 – Existing Point of Diversion and Flow Measurement and Proposed Flow Measurement Location). CWS Oroville District provides water service to approximately 75 percent of the City of Oroville residents, the continued use of PG&E non-project water will benefit the residents of Oroville that rely on CWS for domestic water needs.

Similar Contracts

Same NAICS industry code

NAICS: 221310
New
Federal
4610--Engineering Request - SPS REVERSE OSMOSIS | 538-26-3-6064-0049 (VA-26-00079545) - VAMC Chillicothe
Solicitation # 36C25026Q1034
Solicitation 36C25026Q1034 is a 100% small business set-aside request for quotation issued by the Department of Veterans Affairs Network Contracting Office 10. The project involves providing equipment to replace end-of-life and undersized sterile processing water equipment at the Chillicothe VAMC to comply with ANSI/AAMI ST108:2023 water safety mandates. The scope of work includes the provision of Reverse Osmosis systems, including one unit with a minimum of 15,000 to 20,000 GPD and 95% NACL percent rejection, as well as filter housings, UV lights, and drain tanks. All equipment must be delivered to the Chillicothe VAMC Building 23 Warehouse. Notably, the installation and testing of equipment, as well as the provision of pumps and tank vent cartridges, are explicitly excluded from the scope. The contract is awarded based on a comparative evaluation where technical capabilities and past performance are weighted more heavily than price. The period of performance is 90 days from the date of award, and the contractor must submit specification documentation to the COR for review prior to purchasing equipment. Deliveries must be marked FAST PAY, and the contractor is required to provide operations and maintenance manuals and cutsheets for review prior to acceptance. The response deadline for this procurement is September 22, 2026, at 3:00 PM Eastern Time.
250-NETWORK Contract Office 10 (36C250)

POSTED

1 day ago

DEADLINE

in about 1 hour
View Details
NAICS: 221310
New
Federal
J046--Water Treatment & Maintenance BASE 2 YEAR OPTION
Solicitation # 36C24626Q1007
Solicitation 36C24626Q1007 is a request for quotes for water treatment and maintenance services at the Salisbury VA Medical Center in Salisbury, North Carolina, issued by the Department of Veterans Affairs Network Contracting Office 6. The scope of work includes chemical treatment for cooling towers to control scale, corrosion, and biological growth, as well as quarterly testing for chilled and hot water loops. The contractor is responsible for providing all necessary chemicals and supplies, maintaining equipment such as controllers and sensors, performing legionella testing, and responding to system failures within 24 hours. The procurement is set aside for HUBZone small businesses under NAICS code 221310. The contract structure consists of a base year and two option years, with the base period beginning on October 2, 2026. Award will be based on the lowest price among responsible offerors who meet the technical and experience requirements. Offerors must submit a comprehensive quote including a signed Standard Form 1449, a detailed pricing schedule, and a technical approach demonstrating their experience and understanding of the statement of work. Key requirements include adherence to OSHA and EPA regulations, the provision of Safety Data Sheets for all chemicals, and compliance with Service Contract Act wage determinations. Invoicing is to be handled monthly in arrears through the VA Financial Service Center electronic system.
246-NETWORK Contracting Office 6 (36C246)

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 221310
New
SLED
Valve Turning And Valve Nut Replacement
Solicitation # 20260917044
The City of South Gate is soliciting proposals for citywide valve turning and valve nut replacement services for its water distribution system. The scope of work involves locating, inspecting, exercising, and repairing valves ranging from 4 to 24 inches in diameter across all streets within the city's water service area. Key deliverables include performing at least two full cycles of valve exercising until torque and turn counts stabilize, managing traffic control in compliance with the California Manual for Uniform Traffic Control Devices, and providing real-time data entry into the City's GeoViewer 3.0 system. The contract term runs from February 1, 2025, to January 31, 2028, with the possibility of two one-year extensions. Qualified contractors must possess at least 10 years of experience in valve services and municipal or regional water systems. The selection process is managed by a committee that evaluates proposals based on responsiveness and qualifications, with a shortlist of at least three candidates potentially selected for interviews. Mandatory requirements include obtaining a South Gate business license, adhering to California prevailing wage laws, and maintaining comprehensive insurance coverage, including general liability, professional liability, and automobile liability. Proposals are due by October 7, 2026, at 1:00 pm and must include a cost form, subcontractor list, qualification statement, and performance history.
South Gate City

POSTED

4 days ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS