Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on August 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Elk Creek IRSC RMRP Stewardship Call Order

Awarded
12363N25Q4191Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in 8 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 115310
New
SLED
San Poil Forest, 4 PreCommercial thinning contrats, 21 Mile area
Solicitation # SanpoilForest2026Oct29.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forest Development, is soliciting bids for four Pre-Commercial Thinning (PCT) contracts in the 21 Mile area of the Colville Indian Reservation. The project encompasses a total of 120.1 acres divided into four units: SP-11-PCT-27 (56.3 acres), SP-12-PCT-27 (38.4 acres), SP-13-PCT-27 (41.5 acres), and SP-14-PCT-27 (40.2 acres). The scope of work requires contractors to identify desirable crop trees and remove competing trees and shrubs according to specific site treatment prescriptions. Performance is subject to strict quality standards, including stump heights of less than five inches, specific slash clearance requirements near roadways and streams, and the protection of boundary and surveyed blazed trees. Bids must be submitted via a locked drop-off box at the San Poil Forestry Office by 4:00 PM on October 29, 2026; electronic submissions are prohibited. A complete bid packet must include a work plan, contractor liability insurance, TERO compliance and utilization forms, Title X certification, a debarment form, a bid evaluation form, and sam.gov verification. Award evaluations will consider technical qualifications, price reasonableness, responsibility, and a strong emphasis on Indian preference. Payment is based on completed and accepted acreage at the bid price per acre, with 20 percent of each payment withheld until final inspection and approval by the Contracting Officer's Representative. Contractors must also comply with TOSHA safety regulations and maintain a valid Trader License.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in about 23 hours
NAICS: 115310
New
Federal
Green Mountain Finger Lakes Invasive Species Map and Control
Solicitation # 12444726Q0053
Solicitation 12444726Q0053 is a HUBZone Small Business set-aside request for quotation issued by the USDA Forest Service for the mapping and control of non-native invasive plant species within the Green Mountain and Finger Lakes National Forests in Vermont. The contractor is required to survey, map, and treat invasive species across various environments, including timber harvest units, disturbance corridors, and developed sites, using a combination of manual, mechanical, physical, and chemical treatments. Key technical requirements include the use of GPS/GIS technology for data collection and the mandatory use of aquatic-safe herbicides near wetland areas. The period of performance is scheduled from January 1, 2027, to December 31, 2027. The scope of work is divided into several line items covering herbicide applications via cut stump, basal bark, and foliar methods, as well as population surveying and mobilization. To be eligible, the contractor and on-site supervisors must possess current Vermont commercial pesticide applicator licenses. Award decisions will be based on a technical approach, past experience, and price reasonableness, rather than solely on the lowest price. Following several amendments, the final deadline for quotes was extended to November 2, 2026. Performance will be monitored through 100 percent visual inspections of treatment units conducted by the Contracting Officer's Representative.
Csa East 8 Usda-Fs

POSTED

2 days ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
NC27-127 Hurricane Cliffs
Solicitation # NC27-127
Solicitation NC27-127, titled Hurricane Cliffs, is an invitation for bids issued by the State of Utah Division of Purchasing for the Forestry, Fire, and State Lands unit. The project involves tree thinning and piling activities across approximately 180 acres in Iron County, Utah, specifically about two miles southeast of Cedar City. The primary objectives are to reduce the risk of catastrophic fire and promote vegetation diversity. The scope of work requires the cutting of pinyon and juniper trees six inches above ground level, with all slash exceeding three inches in diameter being piled. The contractor must provide a minimum 10-man crew equipped with chainsaws and GPS or smartphone mapping applications. The project budget is estimated at 128,700 dollars, and the work must be completed by December 31, 2027. Participation is strictly limited to prequalified contractors, and the contract will be awarded to the lowest cost responsive and responsible vendor. Bids must be submitted on both a per-acre and total cost basis, inclusive of all mobilization and operation costs, with pricing guaranteed through project completion. The contractor is required to maintain specific insurance coverages, including Workers Compensation and Commercial General Liability with limits of 1 million dollars per occurrence and 3 million dollars aggregate. Compliance with environmental standards is mandatory, including washing equipment to prevent the spread of noxious weeds and adhering to hazardous materials regulations. The contract is governed by the State of Utah's standard purchase order terms and conditions, including certifications against economic boycotts of Israel and adherence to federal and state non-discrimination laws.
Utah

POSTED

5 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This procurement is limited to pre-approved companies eligible to submit call orders under the Rocky Mountain Restoration Project Stewardship BPA. The contract may be awarded to up to two vendors through BPA Call Orders based on previously solicited offers via the Government Point of Entry. The Elk Creek Integrated Resource Service Contract encompasses multiple projects aimed at enhancing forest health and resilience, with potential awards for four specific projects named Atlantis, Diamond, Jade, and Pearl. The solicitation was posted on August 7, 2025, with a response deadline of September 8, 2025, and involves no set-aside restrictions, focusing on NAICS code 115310. The project is managed by the Black Hills National Forest under the Department of Agriculture, with the work to be performed in Spearfish, South Dakota. Interested parties can contact Keith Brugger via email or phone for further details.

General Info

USDA Forest Service solicits two vendors for Elk Creek forest restoration projects in South Dakota.

Contract Value

$5,751,000

NAICS

115310 - Support Activities for Forestry

Place of Performance

Spearfish, SD, 57783, USA

Set-Aside

NONE

Award Issued Date

Documents

26

A001 Pearl IRSC Logging Plan Map - Black Hills National Forest

PDF, High priority: read this first1 page · specifications
High

Atlantis IRSC Appendix C - Road Maintenance Requirements

PDF, High priority: read this firstspecifications
High

Atlantis IRSC Contract Area Map - Black Hills National Forest

PDF, High priority: read this first1 page · specifications
High

Atlantis IRSC Logging Plan Map

PDF, High priority: read this first1 page · specifications
High

Atlantis Timber Sale Cruise Report

PDF, High priority: read this first48 pages · specifications
High

Cruise of Record - Jade Timber Sale (08293)

PDF, High priority: read this first54 pages · specifications
High

Diamond IRSC Appendix C - Road Maintenance Requirements

PDF, High priority: read this firstspecifications
High

Diamond IRSC Contract Area Map - Black Hills National Forest

PDF, High priority: read this first1 page · specifications
High

Diamond I/RSC Logging Area Map - Jack Hill National Forest

PDF, High priority: read this firstspecifications
High

Diamond Timber Sale Cruise Report (08289)

PDF, High priority: read this first49 pages · specifications
High

Elk Creek IRSC Appendix A - Technical Specifications

PDF, High priority: read this firstspecifications
High

Elk Creek IRSC Appendix B - Timber Removal Specifications

PDF, High priority: read this first38 pages · specifications
High

Elk Creek IRSC Appendix C - Road Maintenance Requirements

PDF, High priority: read this first17 pages · specifications
High

Elk Creek IRSC Appendix C - Road Maintenance Requirements

PDF, High priority: read this first19 pages · specifications
High

Elk Creek IRSC Appendix D - Atlantis

PDF, High priority: read this first80 pages · specifications
High

Elk Creek IRSC Fire Plan

PDF, High priority: read this first2 pages · specifications
High

Elk Creek IRSC Traffic Control Plan

PDF, High priority: read this first4 pages · specifications
High

Jade IRSC Contract Area Map - Black Hills National Forest

PDF, High priority: read this first1 page · contract-document
High

Jade IRSC Logging Plan Map - Black Hills National Forest

PDF, High priority: read this first1 page · specifications
High

Jade IRSC Specifications and Drawings - Meade County, SD

PDF, High priority: read this firstspecifications
High

Pearl IRSC Contract Area Map - Black Hills National Forest

PDF, High priority: read this firstspecifications
High

Pearl IRSC Specifications and Drawings - Construction/Reconstruction of Specified Roads

PDF, High priority: read this firstspecifications
High

Pearl Timber Sale Cruise Report (08290)

PDF, High priority: read this first70 pages · specifications
High

SCA-WD 1979-1157 v73 (8 Jul 2025)

PDF, High priority: read this first4 pages · wage-determination
High

Solicitation 12363N25Q4191 - Elk Creek BPA Call Order

PDF, High priority: read this first45 pages · rfq
High

DB WR SD20240032

PDF, Low priority5 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Solicitation

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Black Hills National Forest
Contacts2 people available
OfficeCUSTER, SD, 57730, USA
Office AddressCUSTER, SD, 57730, USA

Full Description

Show more
Amendment 001 8/26/2025- This amendment replaces the previous attachment 7d. Elk Creek IRSC LPM-Pearl_INFORMATIONAL ONLY with an updated version including logging plan features. The response due date is not changed with this amendment. Description-This procurement is restricted to the approved companies eligible for call orders under the Rocky Mountain Restoration Project (RMRP) Stewardship BPA. This requirement may be awarded to two vendors as BPA Call Orders against BPA's previously solicited on the Government Point of Entry (GPE). The government will not provide feedback or evaluations to companies regarding their submissions in response to this notice. The Elk Creek Integrated Resource Service Contract (IRSC) is a multi-project solicitation focused on improving forest health and resilience while supporting local economies. This initiative may award four separate projects: Atlantis, Diamond, Jade, and Pearl.

More opportunities from Department Of Agriculture → Black Hills National Forest

Same awarding agency

NAICS: 237990
Federal
GAOA Grizzly Bear Campground
Solicitation # 127EAX27Q0004
Solicitation 127EAX27Q0004 is a Request for Quotation issued by the Black Hills National Forest under the Department of Agriculture for comprehensive updates to the Grizzly Bear Campground in South Dakota. This firm fixed price acquisition is a total small business set-aside under NAICS code 237990. The scope of work includes adjusting road alignments, enhancing subbases, and replacing the pumphouse, service lines, distribution lines, and point-of-use hydrants. Additional requirements involve redesigning campsites for accessibility and functionality, equipping host and volunteer sites with water, electric, and sewage services, and constructing a new stick-built double toilet and pump house. The project also emphasizes the preservation of historical Civilian Conservation Corps elements, such as stone pavilions and drainage structures, and requires adherence to ABA and ADA accessibility standards. The period of performance is scheduled from November 30, 2026, to December 10, 2027, with a response deadline of November 5, 2026. Award will be based on a comparative evaluation of best value, considering relevant experience, past performance from the last five years, and fair and reasonable pricing. Key deliverables include site work for campsites, the new pumphouse and toilet buildings, water system installations, signage, and gates. Contractors must provide an onsite superintendent at all times and engage an independent geotechnical engineering testing agency for quality control. Submissions must include a priced schedule of items, a technical approach, and five relevant past performance references.
Other Heavy and Civil Engineering Construction

POSTED

20 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS