Elk Grove Florin Road Complete Street & Resurfacing Project

Closed
20260722012State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
SLED
General Paving and Drainage Pricing Agreement
Solicitation # PD 25-26.113
Solicitation PD 25-26.113 is an Invitation to Bid issued by Escambia County, Florida, for a General Paving and Drainage Pricing Agreement to replace contract PD 22-23.126. The agreement establishes a framework for various as-needed projects, including drainage, roadway widening, resurfacing, dirt road paving, traffic calming, and community improvement projects. To be eligible, contractors must hold a General Contractor’s or Underground Utility Contractor’s License. A key constraint of the agreement is that no single project may exceed a total value of $250,000, and no more than 25 percent of a project's value may consist of Balance-of-Line items. The contract has an initial term of 36 months, with options to renew for two additional 12-month periods, totaling a maximum of 60 months. Award decisions will be based on the lowest responsive and responsible bid, with the possibility of multiple awards. Selected contractors must mobilize within 10 days of a Notice to Proceed and provide performance and payment bonds within 10 days of a project award. Bidders are required to submit firm unit prices and provide various certifications, including anti-human trafficking affidavits and certifications regarding scrutinized companies. Following several extensions due to Hurricane Isaias, the final response deadline is November 13, 2026, at 9:30 am CST, with submissions required electronically via the OpenGov portal.
Purchasing

POSTED

about 3 hours ago

DEADLINE

in 15 days
NAICS: 237310
New
SLED
General Aviation Apron Rehabilitation
Solicitation # 7385 25
The Hillsborough County Aviation Authority is soliciting bids for the General Aviation Apron Rehabilitation project at Tampa International Airport, identified as Project Number 7385 25. The project aims to restore a 34-year-old asphalt apron in the Fixed Base Operators area that has exceeded its structural design life and exhibits widespread weathering. The scope of work includes milling and overlaying asphalt surfaces, adjusting or removing tie-downs, reestablishing pavement markings, and modifying airfield signage. The estimated value includes a base bid of approximately 100 million dollars, a subdivision bid of 50 million dollars, and an additive alternate of 50 million dollars. Bids must be submitted electronically via the e-Procurement Portal by November 16, 2026, at 2:00 p.m. E.T. The anticipated Notice to Proceed date is January 4, 2027. Qualified bidders must provide a bid bond, financial statements, and a current contractor's license, while certifying compliance with E-Verify, non-collusion, and anti-human trafficking laws. Performance will be monitored through a Contractor Quality Control Program, with the Construction Manager handling all quality assurance testing. The contract incorporates FAA Construction Contract Clauses for federal grant funding and requires adherence to Davis-Bacon wage rates and Equal Employment Opportunity standards.
Procurement

POSTED

about 4 hours ago

DEADLINE

in 18 days
NAICS: 237310
New
SLED
Virginia Dr., Forest Dr., and Corrine Dr., Complete Streets Project
Solicitation # IFB27-0003
The City of Orlando is soliciting sealed electronic responses for the Virginia Dr., Forest Dr., and Corrine Dr., Complete Streets Project (IFB27-0003). This infrastructure project involves roadway and pedestrian improvements across approximately 2.6 miles between State Road 527 (Orange Avenue) and Bennett Road. The scope includes drainage, landscaping, lighting, signalization, signing, and pavement markings, with a requirement for all work to meet ADA compliance and the Trench Safety Act. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Base Bid. Submissions must be uploaded via the OpenGov portal by 2:00 pm local time on November 19, 2026. The project timeline requires substantial completion within 1,095 days and final completion within 1,130 days, with mobilization required within 10 calendar days of the Notice to Proceed. Contractors must utilize the Critical Path Method for scheduling and adhere to FDOT Standard Specifications and the City of Orlando's Engineering Standards Manual. Key compliance requirements include the Davis-Bacon Act for wages, Build America, Buy America (BABA) sourcing preferences for steel and iron, and FHWA 1273 federal contract provisions. Payment is processed through signed Applications for Payment with a 20-business-day payment period, requiring surety consent and weekly certified payroll submissions. Successful bidders must provide performance and payment bonds and certificates of insurance within two weeks of the notification of intended award.
Public Works

POSTED

about 4 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The project entails comprehensive street improvements along approximately three miles of Elk Grove Florin Road between Calvine Road and Elk Grove Boulevard, focusing on pavement rehabilitation, restriping to create a continuous bike route, and infrastructure upgrades to meet accessibility and safety standards. Key elements include replacing twenty-one existing curb ramps with ADA-compliant versions, constructing a 240-foot sidewalk segment near West Camden Drive, and rehabilitating damaged pavement sections through cold planing and placement of hot mix asphalt in both binder and surface layers. Additional scope covers installation of traffic signs, delineators, temporary and permanent pavement markings, concrete curbs and gutters, raised bike crossings, and bike racks. The work must adhere to State Standard Specifications, California Public Contract Code, and local municipal codes, with strict compliance required for materials, workmanship, and testing. All construction activities must be completed within eighty working days from the Notice to Proceed, excluding weekends, holidays, and days rendered unworkable by weather or legal mandates. The project is administered by the City of Elk Grove under a Lowest Price Technically Acceptable (LPTA) procurement process, meaning award will be made to the responsive bidder offering the lowest price that meets all technical requirements. Bidders must hold an active SAM Unique Entity Identifier, comply with federal regulations including Davis-Bacon wage requirements, and adhere to 49 CFR Part 26 for Disadvantaged Business Enterprise participation. Contractors are required to self-perform at least 30% of the work using their own resources, submit certified payrolls, and maintain records for three years post-completion. Materials must be properly marked with manufacturer, model, and lot information, and ocean shipments must comply with U.S. flag vessel requirements under 46 CFR Part 381. All submissions must be made electronically through the PlanetBids portal by the deadline of August 25, 2026, and the City will not accept late bids. No contract value is disclosed because unit and total pricing are to be submitted confidentially by bidders, and formal payment, accounting, or contracting officer details are not included in the public documentation.

General Info

Elk Grove street project: pavement rehab, bike lane, 21 ADA ramps, new sidewalk, traffic and utility upgrades on Florin Road.

Place of Performance

Elk Grove, CA, USA

Set-Aside

NONE

Documents

2

City of Elk Grove WTR078 Plans for Elk Grove-Florin Road Project

PDF, High priority: read this firstplans
High

WTR078 Elk Grove Florin Road Complete Street & Resurfacing Project Specifications

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Elk Grove
Contacts5 people available
OfficeN/A
Office AddressN/A
Contacts
Kim BrownProject Coordinator
Travis KuhnProject Manager

Full Description

Show more
Bid #WTR078, STPL-5479(077): The project involves complete street improvements along approximately three miles of Elk Grove Florin Road between Calvine Road and Elk Grove Boulevard. Key work items include pavement rehabilitation and restriping to establish a continuous bike route along northbound Elk Grove Florin Road. Additionally, the project requires replacing twenty-one existing curb ramps with Americans with Disabilities Act (ADA) compliant curb ramps and constructing a 240-foot long sidewalk segment on the east side of Elk Grove Florin Road near West Camden Drive. Pavement rehabilitation will focus on replacing damaged, failed, or cracked pavement sections. The scope also covers traffic control systems, utility adjustments, landscaping, and electrical system modifications.

More opportunities from California → City of Elk Grove

Same awarding agency

NAICS: 237310
SLED
The Laguna Creek Trail And Bruceville Road Sidewalk Improvements Project
Solicitation # WTL019
The Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project, solicitation WTL019, is a public works initiative by the City of Elk Grove, California, designed to fulfill the goals of the 2014 Bicycle, Pedestrian, and Trails Master Plan. The scope of work involves the construction of approximately 0.6 miles of new six-foot wide sidewalks along Bruceville Road, the installation of a 300-foot vehicular right-turn lane, and the development of trail and multi-use path facilities. Key technical deliverables include Hot Mixed Asphalt paved surfaces with stabilized Decomposed Granite shoulders, ADA-compliant ramps, user-actuated warning systems at trail crossings, and various utility adjustments, landscaping, and traffic signal modifications. The project is located in Sacramento County, specifically near Bruceville Road and Big Horn Boulevard. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation based on technical organization, financial resources, equipment availability, and comparable experience. Bidders must submit electronic proposals via the PlanetBids portal by November 17, 2026. Compliance requirements are extensive, including the provision of 100 percent payment and performance bonds, adherence to prevailing wage laws, and strict Buy America standards for construction materials. Additionally, the contractor must maintain an active SAM.gov registration and provide various certifications, including Noncollusion, Equal Employment Opportunity, and Debarment and Suspension affidavits. Work is subject to inspection by the City Engineer and must follow Caltrans Highway Design Manual standards and specific protocols for the protection of Native American cultural resources.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS