Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Elk Grove Florin Road Complete Street & Resurfacing Project

Active
20260722012State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project entails comprehensive street improvements along approximately three miles of Elk Grove Florin Road between Calvine Road and Elk Grove Boulevard, focusing on pavement rehabilitation, restriping to create a continuous bike route, and infrastructure upgrades to meet accessibility and safety standards. Key elements include replacing twenty-one existing curb ramps with ADA-compliant versions, constructing a 240-foot sidewalk segment near West Camden Drive, and rehabilitating damaged pavement sections through cold planing and placement of hot mix asphalt in both binder and surface layers. Additional scope covers installation of traffic signs, delineators, temporary and permanent pavement markings, concrete curbs and gutters, raised bike crossings, and bike racks. The work must adhere to State Standard Specifications, California Public Contract Code, and local municipal codes, with strict compliance required for materials, workmanship, and testing. All construction activities must be completed within eighty working days from the Notice to Proceed, excluding weekends, holidays, and days rendered unworkable by weather or legal mandates. The project is administered by the City of Elk Grove under a Lowest Price Technically Acceptable (LPTA) procurement process, meaning award will be made to the responsive bidder offering the lowest price that meets all technical requirements. Bidders must hold an active SAM Unique Entity Identifier, comply with federal regulations including Davis-Bacon wage requirements, and adhere to 49 CFR Part 26 for Disadvantaged Business Enterprise participation. Contractors are required to self-perform at least 30% of the work using their own resources, submit certified payrolls, and maintain records for three years post-completion. Materials must be properly marked with manufacturer, model, and lot information, and ocean shipments must comply with U.S. flag vessel requirements under 46 CFR Part 381. All submissions must be made electronically through the PlanetBids portal by the deadline of August 25, 2026, and the City will not accept late bids. No contract value is disclosed because unit and total pricing are to be submitted confidentially by bidders, and formal payment, accounting, or contracting officer details are not included in the public documentation.

General Info

Elk Grove street project: pavement rehab, bike lane, 21 ADA ramps, new sidewalk, traffic and utility upgrades on Florin Road.

Agency

California → City of Elk GroveView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Elk Grove, CA, USA

Set-Aside

NONE

Documents

(2)

WTR078 Elk Grove Florin Road Complete Street & Resurfacing Project Specifications

PDFspecifications

City of Elk Grove WTR078 Plans for Elk Grove-Florin Road Project

PDFplans

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Elk Grove
Contacts5 people available
OfficeN/A
Organization / Agency
California → City of Elk Grove
View Agency Profile
Office AddressN/A
Contacts
Kim BrownProject Coordinator
Travis KuhnProject Manager

Full Description

Show more
Bid #WTR078, STPL-5479(077): The project involves complete street improvements along approximately three miles of Elk Grove Florin Road between Calvine Road and Elk Grove Boulevard. Key work items include pavement rehabilitation and restriping to establish a continuous bike route along northbound Elk Grove Florin Road. Additionally, the project requires replacing twenty-one existing curb ramps with Americans with Disabilities Act (ADA) compliant curb ramps and constructing a 240-foot long sidewalk segment on the east side of Elk Grove Florin Road near West Camden Drive. Pavement rehabilitation will focus on replacing damaged, failed, or cracked pavement sections. The scope also covers traffic control systems, utility adjustments, landscaping, and electrical system modifications.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract entails the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water supplies. The project requires integrated engineering solutions to meet regulatory standards for drinking water safety, with scope covering all phases from site preparation to system commissioning, ensuring seamless integration with existing infrastructure. All work must comply with industry best practices and performance benchmarks for PFAS mitigation. Interested parties must submit responses by September 3, 2026, under solicitation number lacsd-surface-water-pfas-removal-project-no-251-ca, with the project designated for Disadvantaged Business Enterprise participation under Department of Transportation guidelines. The North American Industry Classification System code is 237310, reflecting wastewater and sewage system construction. The contracting entity is Pyramid Building & Engineering, Inc., and inquiries should be directed to John Garrison at estimating@pyramidbuilding.net or 760-949-9005. Performance is limited to California locations, with no specified city or zip details provided for the worksite.
Pyramid Building & Engineering, Inc.

POSTED

about 3 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
2026/2027 Street Rehabilitation
Solicitation # 20260811030
The City of Yucaipa is soliciting bids for the 2026/2027 Street Rehabilitation project, identified as Project No. 11256. This public works construction project involves the rehabilitation of various street segments, including Fremont Street and Calimesa Boulevard. The scope of work encompasses asphalt concrete paving, full width milling, full depth removals and patching, AC overlays, and geogrid installation. Additional requirements include the adjustment of sewer manholes and water utility valve covers to grade, construction of asphalt concrete dikes, installation of new signage, and the application of pavement striping and markings. All work must adhere to the Standard Specifications for Public Works Construction (Greenbook), Caltrans standards, and City Engineer specifications. The contract will be awarded to the lowest responsible bidder based on the total bid amount for Base Bid Schedule A. Bidders must provide proof of a valid California Contractor’s License, comply with California Labor Code prevailing wage and apprenticeship requirements, and maintain comprehensive insurance coverages, including General Liability and Automobile Liability of 5 million dollars per occurrence. Required surety bonds include bid, performance, payment, and maintenance bonds. The successful contractor must start work within 15 calendar days of the Notice to Proceed and complete all activities within 40 working days. Proposals must be submitted as physical hard copies in sealed envelopes to the Yucaipa Public Works Department by the specified deadline.
City of Yucaipa

POSTED

about 4 hours ago

DEADLINE

in 14 days
View Details