Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ellis Lake Park Enhancement Project

Closed
20260721010State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
ACADEMY OF RICHMOND COUNTY PARKING LOT PAVEMENT REPAIR and STRIPING
Solicitation # 26-214
The Richmond County Board of Education has issued RFP 26-214 for turnkey pavement repair and striping services at the Academy of Richmond County, located at 910 Russel St., Augusta, Georgia. The scope of work includes patching designated areas to match existing pavement, installing curb and gutter to enclose grease trap access manholes, and performing line striping. Specific technical requirements include the use of 3,000 FSI concrete with a fine broom finish, 98% compacted subgrade, and MPI #32 alkyd traffic-marking paint. All new striping and hatching must be yellow, while stop bars and existing crosswalks must be recoated in white, adhering to Georgia DOT Construction Standards. Asphalt top courses must cure for at least 14 days before painting. The contract will be awarded to the lowest responsible and responsive bidder, with an anticipated award date of October 20, 2026. Sealed bids are due by 3:00 PM on October 7, 2026, and must include turnkey pricing, a project lead time, company references, and a signed Sex Offender Acknowledgement Form. Contractors must maintain commercial general liability insurance of 2 million dollars and worker's compensation insurance of 1 million dollars. Compliance with Georgia state laws is mandatory, including E-Verify affidavits, periodic criminal history record inquiries under O.C.G.A. 35-3-34, and adherence to a smoke-free environment on school property. All work coordination and deliveries must be cleared through David Perry.
Richmond County Board of Education

POSTED

about 12 hours ago

DEADLINE

in 26 days
NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 13 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Ellis Lake Park Enhancement Project involves a comprehensive overhaul of the eastern shoreline along Ellis Lake in Marysville, California, extending from 10th Street north to 14th Street. The work includes replacing the existing path with a wider combined concrete sidewalk and precast concrete boardwalk, alongside tree removal, relocation of park lighting, and significant landscaping modifications. New amenities such as fishing benches and trash receptacles will be installed, and Gazebo Island will be upgraded with a new accessible path and pedestrian bridge, along with enhanced landscaping. Additionally, a new play area will be constructed off 11th Street on the lake’s east side. The project demands full compliance with the California DOT Standard Specifications (2023), ANSI standards for nursery stock and tree maintenance, and guidelines from authoritative horticultural references. Work must be performed in accordance with detailed special provisions that override standard specifications where conflicts arise, and all materials and methods must adhere to strict environmental, safety, and labor requirements, including California’s prevailing wage laws and the use of domestically sourced materials. The contract mandates a one-year establishment period for landscape survival, during which the contractor is responsible for maintenance and repair, followed by a one-year warranty. The solicitation, issued as Bid #25-10 under solicitation number 20260721010 by the City of Marysville Public Works Department, is structured as a municipal construction contract with no application of Federal Acquisition Regulation clauses. All bids must be submitted as sealed hard copies to the City Clerk’s Office by 1:30 PM on August 13, 2026, with supporting documentation such as product data and as-built drawings acceptable in digital PDF format. The bid schedule lists estimated quantities for site preparation, concrete work, asphalt, park furnishings, and specialized services like mobilization and stormwater management, but all pricing fields remain blank, indicating that contractors are expected to submit competitive unit and line-item pricing. Contract administration is overseen by the City’s Owner’s Representative and Engineer, with retention held at five percent, subject to substitution with securities. No DBE goals are set, but subcontractor disclosures are mandatory, and all parties must comply with California Labor Code requirements, environmental spill plans, traffic control standards, and a waiver of subrogation in workers’ compensation coverage. The project is not classified under federal contracting mechanisms, and no CLIN, SLIN, or total estimated value is provided within the solicitation, leaving the final contract amount to be determined by

General Info

Replace east lake path, add boardwalk, new play area, benches, lighting, and gazebo upgrades in Marysville.

Agency

California → City of Marysville, Public Works DepartmentView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Marysville, CA, 95901, USA

Set-Aside

NONE

Documents

(4)

Ellis Lake Park Enhancement Project Contract No. 25-10 Specifications

PDFspecifications

Ellis Lake Park Enhancement Project Plan Holders List

PDFplan-holders-list

Ellis Lake Park Enhancement Project - Plan Holders List

PDFplan-holders-list

Ellis Lake Overall-Display.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Marysville, Public Works Department
Contacts4 people available
OfficeN/A
Organization / Agency
California → City of Marysville, Public Works Department
View Agency Profile
Office AddressN/A
Contacts
John Mallen (Consultant City Engineer
Director of Public Works

Full Description

Show more
Bid #25-10: This project consists of replacing the path along the east side of Ellis Lake from 10th Street north to 14th Street with a wider path that is a combination of concrete sidewalk and precast concrete boardwalk. This work includes tree removal, park lighting relocation, landscaping modifications, benches for fishing areas, and trash receptacles. The project also involves improving Gazebo Island by replacing the accessible path and pedestrian bridge and making landscaping enhancements. A new play area will be installed off of 11th Street on the east side of the lake.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS