Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on April 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Emanuel County 2025 LMIG Resurfacing Project

Closed
PE-77623-NONST-2025-000000015State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
T6026-1 North River Gap Sidewalk Project
Solicitation # 27-018
The City of Sandy Springs is soliciting bids for the T6026-1 North River Gap Sidewalk Project, which involves the construction of approximately 300 linear feet of sidewalk on the east side of North River Drive, spanning from 100 North River Drive to 501 North River Parkway. The scope of work includes site preparation through the removal of granite, concrete, and vegetation, the supply and grading of clean fill and topsoil, the reconstruction of two driveways, and the installation of ADA-compliant ramps. All work must adhere to Georgia Department of Transportation (GDOT) Standard Specifications and the Manual of Uniform Traffic Control Devices (MUTCD), with materials sourced from GDOT certified suppliers. The project requires a 75-day performance period from the issuance of the Notice to Proceed, with work permitted on weekdays from 8:00 AM to 5:00 PM and traffic-interfering activities restricted to 9:00 AM to 4:00 PM. Bids for solicitation 27-018 must be submitted by January 7, 2027. Required documentation includes a bid schedule, price certification, drug-free workplace certification, and a Georgia Security and Immigration Compliance Act affidavit. A bid bond is mandatory if the bid price exceeds $100,000, and the successful contractor must provide performance and payment bonds, as well as a certificate of insurance. Key deliverables include before-and-after project videos, independent testing for concrete and sub-grade compaction, and a two-year warranty on sod installation. There is no specified set-aside status for this solicitation.
City of Sandy Springs

POSTED

about 9 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
International
EN27TFM021 South Peter FSR Extension - Arrow
Solicitation # EN27TFM021
The EN27TFM021 South Peter FSR Extension - Arrow is a Major Works Contract for forest road construction issued by the BC Timber Sales Branch of the Province of British Columbia. The scope of work involves mobilization and demobilization, site preparation including clearing and debris disposal, and roadway and drainage excavation such as embankments, ballasting, and excavation in solid rock. The project is located in British Columbia, Canada, and requires the contractor to commence work immediately upon execution of the agreement, with completion dates defined in the contract schedules. Award is based on identifying the lowest compliant bidder, with evaluation factors focusing on the bidder's technical experience, qualifications, and possession of necessary machinery and equipment. Key requirements include mandatory BC Forest Safety Council SAFE certification for all subcontractors and adherence to strict camp standards regarding health, sanitation, and water safety. The contract is administered by the Minister of Forests through the Kootenay Business Area, with payments typically processed between 30 to 60 days after invoice certification. Bidders must provide bid security, and the successful contractor is required to provide performance and labour and material payment bonds, as well as WorkSafe BC coverage.
BC Timber Sales Branch

POSTED

about 11 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Emanuel County 2025 LMIG Resurfacing Project involves extensive roadway improvements across multiple routes within Emanuel County, Georgia. The scope includes resurfacing approximately 8.05 miles of roads, specifically Stevens Crossing, Watson Road, Old Wadley Road North, Bird Flanders Road, and Modoc Lane. All designated roads will undergo asphalt patching as necessary, followed by leveling, double surface treatment as the final surface, striping, and shoulder construction to enhance durability and safety. Additionally, Bird Flanders Road requires four pipe replacements and related work as part of the project scope. Qualified bidders can access the detailed contract documents and specifications by purchasing digital copies for $150 each from EMC Engineering Services in Statesboro, Georgia, with Stacy Turk as the contact person. The project is managed by the Emanuel County Board of Commissioners under the Georgia Department of Transportation’s LMIG program, with a total estimated value ranging from one to three million dollars. The solicitation was posted on April 10, 2025, with a response deadline of May 9, 2025. Interested contractors are encouraged to contact Dan Chicola via email or phone for further information. The project aims to improve roadway conditions and safety across the specified routes, contributing to regional infrastructure development.

Documents

1
DOCX, High priority: read this firstifb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 7 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 77623 EMANUEL PE-77623-NONST-2025-000000015 to PE-77623-NONST-2025-000000015.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Emanuel County Board of Commissioners
Contacts1 person available
OfficeN/A

Full Description

Show more
The project includes the resurfacing and associated work of Stevens Crossing from Wadley Coleman Lake RD North for 1.05 miles to the end of pavement, Watson Road from Wadley Coleman Lake Road West for 1.40 miles to Piney Grove Road, Old Wadley Road North from Wadley Coleman Lake Road North for 1.3 miles to the Johnson County Line, Bird Flanders Road from US HWY 1 west for 3.65 miles to Pinetucky Road, and Modoc Lane from GA HWY 56 West for 0.65 miles to Modoc Road. All roads will receive asphalt patching as required, leveling, double surface treatment as final surface, striping, and shoulder building. Bird Flanders has four pipe replacements and associated work included in its scope. Qualified Bidders may obtain digital copies of the CONTRACT DOCUMENTS, Specifications, and upon a non-refundable payment of $150.00 for each set at the Statesboro office of EMC Engineering Services, Inc. Please contact Stacy Turk at Sign up to see this detail, stacy Sign up to see this detail.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS