EMERGENCY RESPONSE REVISED

Closed
FA304712EMERGENCYFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for the Atterbury Job Corps Center in Edinburgh, Indiana. The project requires comprehensive mold remediation for Theatre Building 1086 following a sprinkler system failure. The scope of work includes remediating all visible and exposed interior components and cleaning or replacing damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. Key technical requirements include the provision of a Certified Industrial Hygienist to verify materials and perform final clearance, the implementation of a detailed remediation plan featuring HEPA filtration and negative air pressure, and maintaining interior humidity levels at or below 50 percent. The contract will be awarded based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Mandatory requirements include attendance at a site visit on October 27, 2026, and submission of a 90-day bid guarantee. Selected contractors must provide proof of automobile liability and workers compensation insurance, certify compliance with Davis Bacon Act wage rates, and start work within 14 days of the Notice to Proceed. Payment terms are Net 30.
Atterbury Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 20 days
NAICS: 562910
New
Maui JCC Mold Remediation and Removal of Water-Damaged Materials
Solicitation # maui-jcc-mold-remediation-removal-water-damaged-materials
Management & Training Corporation (MTC), acting as the Center Operator for the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract for mold remediation and the removal of water-damaged materials at the Maui Job Corps Center in Makawao, Hawaii. The project focuses on Building 11, specifically the cafeteria, food service areas, restrooms, and adjoining spaces, which sustained significant water intrusion during a severe windstorm on August 15, 2026. The scope of work includes selective demolition, cleaning, drying, and the installation of HEPA-filtered negative air pressure containment systems in accordance with EPA guidance. The estimated price range for the project is between $25,000 and $100,000. Bids are due by October 23, 2026, and will be awarded based on overall best value. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids of $25,000 or more, contractors must provide a bid bond guarantee equal to 20% of the base bid, and the awarded contractor will be required to provide performance and payment bonds from a surety company with at least an A- rating. Submission requirements include a detailed cost breakout on company letterhead, the MTC Supplier Packet, proof of insurance, and three references for comparable projects. The contract is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Awardees must comply with Davis-Bacon Act wage determinations and federal safety requirements. Payment will be processed via AIA Document G702 and G703 forms based on an approved Schedule of Values, with a 10% retainage withheld until substantial completion and final acceptance by the center. Performance will begin within five business days of an agreed-upon start date determined during a pre-construction meeting.
Management & Training Corporation/Hawaii/Maui Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 4 days

General Info

NAICS

562910 - Remediation Services

Place of Performance

Joint Base San Antonio Lackland AFB, Texas 78236, Lackland AFB, TX, 78236, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA
Contacts
Mary Lou WaltherContract Specialist
Allison L. HartContracting Officer

Full Description

Show more
Emergency Response Statement of Work 1. DESCRIPTION OF SERVICES: The Contractor shall provide hazardous material/hazardous waste/hazardous substance spill response for all Joint Base San Antonio assets which includes Lackland AFB, Randolph AFB, Fort Sam Houston, Camp Bullis, Canyon Lake, and Seguin Auxiliary field, at the installation or location of the incident. The scope of work shall include, but not be limited to, remediation (on soil and/or water), transportation, and disposal while providing additional assets as required. The contractor shall have 24-hour, 365 days a year, emergency response coverage and be a U.S. Coast Guard certified Oil Spill Removal Organization (OSRO) qualified in river/canal and inland operating environments for both facilities and vessels. The contractor must provide proof that they are OSRO qualified. The contractor shall respond with maximum capabilities, labor and equipment, and meet initial response time of one hour to the scene of the incident within the San Antonio Metro area, and two hours outside the San Antonio Metro area. The contractor shall be able to respond to job site within one hour of the initial call and lay 1000 feet of absorbent boom on a water way within that one hour in accordance with the Oil Pollution Act 1990 (OPA 90), the Facility Emergency Response Plan, and the Spill Prevention Control and Countermeasure Plan. Upon initial notification of the incident, the contractor will be informed of the nature and apparent extent of the incident based on an initial reconnaissance. Based on the information provided, the contractor will be expected to report to the scene with all necessary equipment, tools, personnel, etc. to accomplish the following tasks as a minimum: - 1. Stop the release if not done so. - 2. Assess the nature and extent of the release, including but not limited to impact to storm drains, surface water bodies, ground surface, and building interiors. Ensure exposure pathways are stabilized using appropriate equipment to mitigate discharges and stabilize the spill. - 3. Contain any visible liquid or solid released or spilled product and/or waste. - 4. Remove all contained product and waste and visibly affected environmental media (soil, surface water, groundwater, sediment) and store in on-site containers (drums, dumpsters, tanks, etc.) for pending disposal or treatment (ensure underground utilities are properly located PRIOR to excavating beyond 18 inches below ground surface in accordance with Air Force policy). Alternatively, large amounts of excavated soil can be stored on plastic/covered with plastic to prevent stormwater exposure as long as the plastic is adequately anchored. Upon completion of response activities, all on-site containers shall be covered or closed to contain the stored material or waste and prevent escape of contaminants and infiltration of storm water. Collect confirmation samples of affected media to demonstrate response actions have been completed according to Federal/State/Local regulations, as applicable. Additional rounds of response actions and sampling may be required to reach unrestricted site closure. - 5. If directed to do so, perform demolition of affected structures, pavements, drains, etc. - 6. Provide safety barricades and flasher equipment, as needed, to cordon off work area. - 7. Decontaminate all equipment, tools, personnel, etc. used to accomplish tasks 1 through 5. - 8. Contact a permitted treatment, storage, and/or disposal facility (TSDF) to ascertain requirements for characterization of the waste materials and begin the characterization and approval process. The TSDF shall be acceptable to the Environmental Section, Asset Management Flight, Civil Engineer Squadron at the responsible base. - 9. Collect samples of contained waste materials for immediate delivery to an environmental laboratory for waste characterization testing. - 10. Upon receipt of the characterization sample analytical results (maximum of 15 business days), provide the data to the TSDF. Immediately upon acceptance of the waste materials (maximum of 5 business days), transport the waste materials to the TSDF. - 11. Provide disposal documentation to the Environmental Section representative at the responsible base. Service provider shall possess the required mitigation, containment, and cleanup capabilities for a broad range of incidents involving discharge of petroleum products, chemicals and/or other hazardous materials resulting from transformers, vehicular accidents, derailments, aviation accidents, abandonment, crime scene and biological incidents, natural disasters, homeland security threats, terrorist acts, and industrial facility incidents. Following completion of initial response activities, provider may be called upon to return to environmentally remediate contaminated and environmentally impaired sites, as well as cleanup, handling and disposal of hazardous materials. This work may include the following: classify, profile, manifest, and transport to a permitted TSDF(s) and characterize and manage waste streams for recycling, fuel blending, neutralization macro/micro encapsulation, and water treatment, and shall be accomplished as indicated in tasks 1 through 11 above. This work will follow a work plan provided by the Environmental Section representative at the responsible base. Response Services will vary by the type and scope of the incident. The provider shall be capable to provide the following services: Spill containment; debris removal and reduction; temporary debris storage; marine/vessel removal, recovery, and salvage (Canyon Lake); hazardous waste collection, transport, staging, and permanent disposal; demolition of unsafe structures; decontamination and cleanup; beach restoration and replenishment (Canyon Lake); fuel and water delivery; environmental media testing; contaminated soil removal and disposal; environmental containment systems; environmental restoration; dredging/sediment remediation; soil stabilization, solidification, and mixing; in situ/ex-situ bioremediation; surgical source removal; and facility decontamination/demolition, also be called upon to provide support during training exercises (when needed) in support of Unit Compliance Inspections (Inspector General), Spill Prevention Control & Countermeasures Plan (SPCC) and Facility Response Plan (FRP) exercises and implementations. All services completed under this Statement of Work will be coordinated with an assigned representative of the Environmental Section representative at the responsible base and that representative will approve all services before they commence. The contractor shall provide documentation of self certifications of biannual equipment deployment drills and 100 percent inspection and maintenance program of response equipment. The contractor will also provide a list of response equipment that can be available within a one-hour notice. Proof of adequate insurance shall also be provided. 2. LOCATION: Any location within the boundaries of Lackland AFB, Randolph AFB, Fort Sam Houston, Camp Bullis, Canyon Lake, and Seguin Auxiliary field, all of which are located within the San Antonio, Texas metropolitan area. Access to these secure facilities will be coordinated through Environmental Section representative at the responsible base. 3. PROJECT SCHEDULE: Emergency response services must be completed within the schedule stated in Task 10 in Section 1. Additional remediation services must be completed within the scheduled stated in the work plan provided by the Environmental Section representative at the responsible base. 4. HOURS OF OPERATION: Non-emergency services shall be performed during normal duty hours (7:30 A. M. to 4:30 P.M., Monday thru Friday). Hours of operation for emergency services will be coordinated through the Environmental Section representative at the responsible base. 5. WORKMANSHIP: The Contractor shall perform all operations in a manner that will result in a professional and expeditiously completed project. Workmanship shall be in accordance with the best standards of the profession. 6. ACCESSORIES AND INCIDENTALS: Contractor shall provide all personnel, equipment, tools, supplies, supervision, and other incidentals necessary to complete the required scope of work. 7. DEMOLITION: If required by the scope of work for this project, demolition of structures, equipement, etc. shall be accomplished with care to prevent damage or disturbance to adjacent and nearby structures and facilities. 8. QUALITY ASSURANCE: The government shall inspect all work performed by the Contractor. Work performance shall be deemed satisfactory and acceptable to the government when the Environmental Section representative at the responsible base declares the project satisfactory. 9. COMPLIANCE WITH LAWS: The Contractor shall comply with, and ensure that all subcontractors comply with, all applicable federal, state, and local laws, regulations, ordinances, and standards. 10. SITE MAINTENANCE: Work areas shall be maintained in a neat, clean, and safe condition, and shall, at a minimum, be cleaned at the end of each day. All waste materials and equipment shall be stored in locations directed by the Environmental Section representative at the responsible base. 11. CLEANUP: The Contractor shall collect all trash, debris, refuse, garbage, etc., which they generate, and remove it from the site. All debris shall be removed from the Base on a daily basis. 12. PROTECTION: The Contractor shall protect roads, adjacent property, offices, and their contents from dust, dirt, or other materials. The contractor shall also take precautions to prevent damage to government property. The contractor shall repair or replace damaged items at no additional cost to the government. 13. COMPLETION OF WORK: The Contractor shall ensure that work for this project is performed in accordance with the criteria herein, and that all relevant materials, finishes, equipment, and systems shall be fully operational at the completion of work for this project. The contractor shall provide documentation of proper disposal of all waste materials removed from the site. 14. Any changes: The contractor shall coordinate any changes to the work with the Environmental Section representative at the responsible base: 802 CES/CEAN, Lackland AFB Primary: Steve Diaz, 210-671-5350 802 CES/CEAN, Lackland AFB Alternate: Roland Lopez, 210-671-7212 902 CES/CEAN, Randolph AFB Primary: Katy Breyer, 210-652-4668 902 CES/CEAN, Randolph AFB Alternate: Verna Payne, 210-652-4668 502 CES/CEAN, Ft. Sam Houston Primary: Bill Burton, 210-221-3296 502 CES/CEAN, Ft. Sam Houston Alternate: Brian Smith, 210-221-3296 15. GOVERNMENT FURNISHED PROPERTY: None

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

New
Federal
DCF3 PROJECTION SYSTEM
Solicitation # A070977
The Department of Defense, specifically the 502 Cons Cl under the Office of the Air Force, is issuing a sources-sought Request for Information (RFI) for the DCF3 Projection System, solicitation number A070977. The objective is to identify capable providers for the installation of standalone audio-visual (AV) classroom equipment in sixteen classrooms at the BMT DCF3 (Building 9270) located at JBSA-Lackland, Texas. The scope of work includes providing all personnel, equipment, and materials to install laser projectors, zoom lenses, lecterns, scaling switchers, and associated cabling. The system must operate as a standalone solution and is strictly prohibited from interfacing with the Air Force network. Key deliverables include the integration of Apple Government-Furnished Equipment, the provision of technical documentation, and the delivery of user training for staff. Technical requirements specify that projectors and extension columns must be Trade Agreement Act (TAA) compliant, and touch panels must be FCC Class A certified. The contractor is responsible for ensuring high video resolution and sound quality, with final acceptance based on a post-installation walkthrough and inspection at the project site. Security requirements are stringent, requiring criminal history checks and background investigations for all personnel accessing the base, as well as strict adherence to Force Protection Condition procedures and a total prohibition of weapons on site. This RFI is strictly voluntary and is not a formal solicitation for quotes; interested parties must submit their capabilities and open-market pricing via email to Tommie Low by October 27, 2026, at 10 a.m. CST.

POSTED

about 22 hours ago

DEADLINE

in 7 days
View Details
NAICS: 811310
New
Federal
Aviation Support Equipment Load Testing
Solicitation # F2MT2M6146AQ01
This Sources Sought Notice, solicitation number F2MT2M6146AQ01, is a market research effort to identify qualified sources capable of providing aviation support equipment load testing and maintenance for the 433rd MXS/AMXS at Joint Base San Antonio-Lackland, Texas. The scope of work involves non-personal services including annual preventive maintenance inspections, load tests, certification, and both scheduled and unscheduled repairs to ensure the safe operation of aircraft support equipment. All services must adhere to OSHA Standards 1910 and 1926, ANSI Standards B30.16 and B30-5, and applicable Air Force Instructions and Technical Orders. Key deliverables include an initial annual preventive maintenance schedule, certification reports due within two workdays of completion, and repair estimates provided within 48 hours of an initial survey. Performance requirements specify that standard preventive maintenance must be completed and equipment returned within 48 hours of pickup, while approved repairs must be returned within three business days. Interested vendors must submit their response, including company details, CAGE code, and a statement of capability with product literature, to Dalwyn Corporan-Polanco by 10:00 AM CDT on October 20, 2026. This notice is for research purposes only and does not constitute a solicitation or a promise to issue one.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in about 5 hours
View Details
NAICS: 238220
New
Federal
Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement
Solicitation # A070764SS
The 502d Contracting Squadron is conducting market research via a Sources Sought Synopsis to identify capable industry sources for the turnkey removal and replacement of 48 ceiling-suspended Dedicated Outside Air System Water-Source Heat Pumps at the JBSA Ft Sam Houston San Antonio Military Medical Center Dormitory Annex, specifically in buildings B3631 and B3635. The project is projected as a Firm-Fixed Priced Purchase Order under NAICS code 238220. The contractor must provide all personnel, equipment, and supervision to install units that meet strict technical specifications, including a 1.25-ton capacity, horizontal ceiling-plenum configuration, and the use of low-GWP refrigerants such as R-454B or R-32, as R-410A is strictly prohibited. A critical requirement is that replacement units must fit through existing access openings measuring approximately 3 feet 11.5 inches by 2 feet to avoid structural demolition. The scope of work includes the integration of the units into the central Building Automation System via BACnet IP/MSTP and the use of AHR/ISO 13256-1 certified water-to-refrigerant coaxial heat exchangers. Performance must be completed within 275 days of award. Interested respondents must provide company identification, SAM.gov certifications, and confirmation that technicians hold EPA Section 608 Universal Certifications. Small business prime contractors must also verify they can cover at least 51 percent of the contract cost with their own personnel. Responses are due by October 26, 2026, and must be submitted in PDF format with a maximum length of ten pages, excluding equipment cut sheets.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS