Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 27, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Emergency Streambank Protection Project - K20 Little Delaware River

Awarded
W912DQ18B1017Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 3 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Kansas City District, is seeking a small business contractor for the Stockton Lake Project Dam Spillway Repair, also referred to as the Emergency Streambank Protection Project for the Little Delaware River. This heavy construction project involves clearing, grubbing, minor excavation, and grading of streambanks, as well as placing rock at the streambank toe and on the banks. The scope includes site restoration using native trees, grasses, and willow stakes across both the left and right descending banks, spanning from 400 feet upstream to 100 feet downstream of the bridge, though no work will be performed on the bridge structure itself. The project is a 100 percent small business set-aside under NAICS code 237990, with an estimated value between 500,000 and 1,000,000 dollars. The contract will be awarded as a single firm-fixed-price agreement with a performance period of 60 calendar days from the Notice to Proceed. Bidders are required to provide a bid bond of 20 percent of the proposed price or 3,000,000 dollars, whichever is less, and the winning contractor must provide payment and performance bonds for the full amount of the contract.

General Info

Contract Value

$578,682.12

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Kansas Highway 20 Bridge and Delaware River Crossing Located approximately 6.5 miles west, HORTON, KS, 66439, USA

Set-Aside

NONE

Award Issued Date

Documents

5

Solicitation_-_W912DQ18B1017_-_0001_-_Attachment_A_-_Copy.pdf

PDF

Solicitation_-_W912DQ18B1017_-_0001_-_Copy.pdf

PDF

Solicitation_-_W912DQ18B1017_-_0002_-_Copy.pdf

PDF

Solicitation_-_W912DQ18B1017_-_0002_K-20_-_Supp_Bid_Sched_-_Copy.pdf

PDF

W912DQ18B1017_-_K20_As_Advertised_Specs.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline added: Sep 18, 2018. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Kansas City
Contacts2 people available
OfficeKANSAS CITY, MO, 64106-2896, USA
Office AddressKANSAS CITY, MO, 64106-2896, USA
Contacts

Full Description

Show more
The following is a Pre-Solicitation Notice for this requirement. This is not a Request for Quote (RFQ) or Request for Proposal (RFP). The U.S. Army Corps of Engineers, Kansas City District, intends to issue an Invitation for Bid (IFB) on or about June 25, 2018 on the FedBizOps website at www.fbo.gov . This requirement includes a construction project entitled Stockton Lake Project Dam Spillway Repair. In accordance with FAR 36.204 and DFARS 236.204, the estimated magnitude of this construction project is: Between $500,000 to $1,000,000. The NAICS code for this specialty is 237990 (Other Heavy and Civil Engineering Construction). The size standard is $36.5 million. This requirement will be a 100% set-aside for small business. This IFB will result in the award of a single Firm-Fixed-Price (FFP) construction contract. When this IFB is issued, the solicitation will contain information as to when and where bids will be received and opened. A Bid bond will be required with your bid in the amount of 20% of the bidder proposed price or $3,000,000.00 whichever is less. Payment and Performance bonds will be required for the full amount (100%) of the awarded contract before the NTP can be issued. At this time, no pre-solicitation conference is planned for this solicitation. If the government does elect to hold a pre- solicitation conference, the pre-solicitation announcement will be modified accordingly. The Scope of work is a heavy construction action and the project consists of clearing and grubbing; minor excavation, fill, and grading of the existing streambanks; placing rock at the streambank toe both below and above the water surface; placing rock on the bank; and restoring the site with willow stakes, native trees, and grasses. The project starts approximately 400 feet upstream of the bridge and ends approximately 100 feet downstream of the bridge. Work will be conducted on both left and right descending banks. No work to the bridge structure itself. This project includes all work delineated in the Specifications and Plans and any incidental work to provide a complete and usable project. The estimated performance period for completion of construction is 60 calendar days from Notice to Proceed (NTP).

More opportunities from Department Of Defense → W071 Endist Kansas City

Same awarding agency

NAICS: 236220
New
Federal
Veterans Affairs St. Louis Health Care System (VASTLHCS) John Cochran (JC) Hospital in St. Louis, Missouri
Solicitation # W912DQ26RA060
The U.S. Army Corps of Engineers Kansas City District is soliciting proposals for an Integrated Design and Construction (IDaC) contract to modernize the Veterans Affairs St. Louis Health Care System John Cochran Hospital in St. Louis, Missouri. This large-scale project involves demolishing deficient buildings and constructing several new seismically compliant facilities, including a new inpatient bed tower, a clinical expansion, an engineering building, a central utility plant, a water tank, and three parking structures. The total construction cost limit for the requirement is 1.42 billion dollars. The project is being solicited as full and open and requires offerors to submit proposals subject to Project Labor Agreement requirements. The contract is structured with a Pre-Construction Services phase (CLIN 0001) with a performance period of 820 calendar days from the Notice to Proceed, followed by various construction options. Award will be made to a single responsible offeror using a best-value tradeoff process, where non-priced factors are significantly more important than price. To be eligible, offerors must achieve at least an acceptable rating for technical factors and small business participation. Required submissions include a proposal guarantee of 20 percent of the proposed price or 3 million dollars, whichever is less, and full payment and performance bonds upon award. Technical requirements mandate compliance with USACE EM 385-1-1 safety standards, LEED v5 building design, and FGI Hospital Guidelines. The scope includes complex deliverables such as a VA swing space and a phased turnover schedule for various medical zones. Offerors must provide a detailed staffing plan, including a Site Safety and Health Officer and a QC Manager, and must utilize a third-party vendor for cybersecurity assessments. Proposals must be submitted electronically in PDF format by November 25, 2026, adhering to strict page limits and formatting guidelines.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 27 days
View Details
NAICS: 332312
New
Federal
Debris Boom Supply and Install at Harry S. Truman Lake Project
Solicitation # W912DQ26QA080
Solicitation W912DQ26QA080 is a full and open, unrestricted competition for the design, fabrication, delivery, and optional installation of a debris boom system at Harry S. Truman Dam near Warsaw, Missouri. The primary objective of the approximately 2,000-foot boom is to protect the dam's tainter gates from floating debris to maintain spillway operational capacity and serve as a visual barrier for boaters. The system must be USA-made, utilizing domestic materials for all load-bearing components, and must be engineered to withstand specific hydraulic, wind, and wave conditions, including a minimum safety factor of 2.0 and the impact of a 100-foot log. A critical technical constraint prohibits any drilling into, on, or under the earthen dam. The contract is structured with three base CLINs covering design and fabrication, and one option CLIN for installation. Key deliverables include preliminary loading assumptions and drawings within 60 days of award, final professional engineer-stamped specifications and an O&M manual within 120 days, and on-site delivery within 240 to 300 days. Award will be based on the most advantageous offer, evaluating price, relevant experience, and past performance. Quotes must be submitted in PDF format to the designated points of contact by the revised deadline of November 2, 2026, and must include a completed SF 1449, pricing, and the required experience and past performance documentation.
Fabricated Structural Metal Manufacturing

POSTED

6 days ago

DEADLINE

in 4 days
View Details
NAICS: 237110
Federal
Atchison Storm Sewer Separation Improvements, Atchison, Kansas
Solicitation # W912DQ27BA002
The U.S. Army Corps of Engineers, Kansas City District, is soliciting bids for the Atchison Storm Sewer Separation Improvements project in Atchison, Kansas. This small business set-aside construction project, with an estimated value between 1 million and 5 million dollars, involves the separation of storm and sanitary sewers. The scope of work includes the installation of reinforced concrete pipe, reinforced concrete box culverts, and storm water inlets and junction boxes, as well as the removal of existing sewer structures. The contractor is responsible for providing all necessary labor, equipment, and supervision, including incidental grading and the restoration of parkways, driveways, sidewalks, and pavement to a condition equal to or better than the original state. The solicitation is issued as a sealed bid under NAICS code 237110, with a response deadline of November 13, 2026. The project is divided into two primary components: the 16th Street Alignment and an optional 15th Street Alignment. Key requirements include adherence to the City of Atchison Public Works Specifications, compliance with the Davis-Bacon Act, and the submission of a project schedule within 42 days of the notice to proceed. Contractors must provide performance and payment bonds and participate in a partnering session within 45 days of the award. Quality assurance involves inspections of precast concrete units upon delivery and mandatory approval of saddle installations by the Contracting Officer's Representative prior to backfilling.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 15 days
View Details
NAICS: 562910
Federal
SB ERS MATOC, USACE Northwestern Division and EPA Region 2
Solicitation # W912DQ26RA109
The U.S. Army Corps of Engineers, Kansas City District, is establishing a Multiple Award Task Order Contract (MATOC) for Environmental Remediation Services (ERS) to support the USACE Northwestern Division and EPA Region 2. This total small business set-aside under NAICS 562910 has a maximum value of 245 million dollars, with a minimum guarantee of 2,500 dollars per contract. The period of performance runs from June 4, 2027, to June 3, 2032, with a six-month extension option available through December 3, 2032. The scope of work is extensive, covering in-situ thermal and chemical remediation, operations and maintenance of groundwater treatment and soil vapor extraction systems, field investigations, remedial design, risk assessments, and support for abandoned mines programs. Task orders will be executed as either Firm Fixed Price or Cost Plus Fixed Fee. This is a competitive, best-value acquisition utilizing the Highest Technically Rated Offeror with Reasonable Price methodology. Proposals are evaluated based on corporate experience and past performance, with awards granted to the highest technically rated offerors whose pricing is determined to be fair and reasonable; no price-technical tradeoffs will be performed. Offerors must submit two separate electronic PDF volumes via the PIEE Solicitation Module. Contract administration requires the use of the Wide Area WorkFlow system for invoicing and adherence to strict quality standards, including the preparation of Contractor Quality Control Plans and Quality Assurance Project Plans for each task order.
Remediation Services

POSTED

20 days ago

DEADLINE

in 18 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS