Empire Camp SRRA Resurfacing
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Caltrans District 1 in Eureka is preparing to execute the Empire Camp SRRA Resurfacing project, which involves comprehensive pavement rehabilitation within the existing State right of way. The scope includes cold planing of asphalt concrete pavement, placing new HMA Type A material, replacing the asphalt surfacing, installing a PCC slab to accommodate ADA compliance, and reinstating pavement delineation. All construction activities will be confined to paved surfaces and non-vegetated turnouts to minimize environmental impact, with equipment staging strictly limited to existing infrastructure. Construction signage and portable changeable message signs will be deployed between PM 81.4 and PM 82.7 on Men-101, with no significant soil disturbance anticipated. The project aims to extend the service life of the roadway, enhance safety for travelers, and maintain regulatory compliance through improved accessibility and clear markings. The solicitation is listed as a forecast with a posted date of July 31, 2026, and primary contact for inquiries is James McIntosh, Senior Environmental Scientist, reachable via phone or email provided.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
