Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on March 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EN27TIJ403 - Kitnayakwa FSR Construction and Bridge Installation

Closed
BCEN27TIJ403International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Fleet Fast EV Charging - ConstructionThe Port of Seattle’s Aviation Project Management Group is forecasting a construction contract for fast electric vehicle charging infrastructure for its fleet operations, with the solicitation expected to be released in the near future. The project falls under NAICS code 237310, which categorizes it as electrical and other construction services, indicating that it will involve site preparation, electrical system installations, and potentially associated civil works for charging stations. The contract will be managed by the Port of Seattle as the lead agency, with the primary point of contact being Angela Peterson, who can be reached via phone or email for inquiries, and Katie Techa serving as the project manager for technical coordination. The work is anticipated to take place at locations under the Port’s operational control related to fleet vehicle use, though specific sites have not yet been defined. There are no details provided on set-aside provisions, indicating the opportunity may be open to all eligible contractors. The posting date suggests the formal solicitation will follow in 2026, allowing potential vendors time to prepare proposals aligned with the Port’s sustainability and fleet electrification goals. Interested parties should monitor the provided UI link for updates and the official solicitation when it becomes available.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will focus on upgrading the entry and exit drives along 19th Avenue West, demolishing the remaining slab of the Downie Building (C-14), and replacing its footprint with a mix of new parking, green space, and pollinator habitat, potentially incorporating a stormwater treatment facility. Existing pavement in poor condition will be milled and overlaid, while stormwater infrastructure will be fully replaced and expanded to divert runoff from combined sewer lines to dedicated storm lines, with water quality treatment applied to qualifying pavement areas. A new irrigation system will support the landscaped green spaces, including the renovated median within the entry drive, and electric vehicle charging stations will be installed in the new parking area. The project also includes the addition of a protected two-way bike lane linking the terminal entry to the existing West Wall bike path, along with enhanced pedestrian connections to the intersection of 21st Avenue West and W Emerson Place and the nearby King County Metro bus stop. Improved lighting will be installed throughout the new parking area and connecting paths, and new wayfinding elements will guide pedestrian and bicycle traffic. All work is being led by the Port of Seattle through its Waterfront Project Management team, with the project classified under NAICS code 237310 for heavy and civil engineering construction, and the solicitation is forecasted for release in July 2026, with Mike Van Cleve and Terrence Moody listed as primary contacts.
Waterfront Project Management

POSTED

about 3 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a wide range of asphalt paving, striping, and related infrastructure work across multiple Port of Seattle facilities including Seattle-Tacoma International Airport, maritime properties, and surrounding areas. Work includes new asphalt placement and patching, overlays with fabric, crack sealing, seal coating, profile grinding, spoil hauling and disposal, removal of existing pavement markings, surface preparation for new striping, stripe painting, saw cutting and coring of non-hazardous materials, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and enhancements to road drainage systems which may necessitate permitting. All tasks are to be executed under a unit price framework scheduled for performance in 2026, with specifications designed to ensure comprehensive surface maintenance and improvement across Port-controlled properties. The contract is managed by Port Construction Services under the Port of Seattle, with primary point of contact Heather Bowden available via phone and email for inquiries, and Lesley Miles serving as the project manager. Although no solicitation number is provided and the posting date is listed as July 26, 2026, the document is classified as a forecast, indicating this is a planning notice rather than an active procurement. The NAICS code 237310 confirms the scope falls under Highway, Street, and Bridge Construction, and all work is to be conducted at various locations within the Port’s jurisdiction without restriction to a single site.
Port Construction Services

POSTED

about 3 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
CDBG Project #51-04-25 - Studio Fitness Court Park Equipment InstallationSealed bids for the CDBG Project #51-04-25, Studio Fitness Court Park Equipment Installation at 100 Garrett Road, Upper Darby, PA 19082, will be accepted electronically via the PennBid platform until August 13, 2026, at 4:00 PM EST, with no physical opening. The scope is limited to the installation of Studio Fitness Park Equipment only, and all bids must comply with the contract documents including site plans, demolition and repair details, and technical specifications. Bidders are required to submit a bid bond equal to 10% of the bid amount, and the successful bidder must provide a performance bond and a labor and materials bond each at 100% of the contract value, as well as a maintenance bond of 25% up to $200,000 plus 10% on any excess. The award will be made to the lowest responsible bidder on a lowest price technically acceptable basis, with the owner retaining the right to reject any or all bids. This project is federally funded through HUD, triggering Davis-Bacon Act wage requirements for contracts over $2,000, Section 3 participation requirements for contracts over $200,000, and Buy American Act obligations for iron, steel, and other specified construction materials. All subcontractors require prior written approval, and certified weekly payrolls must be submitted under Davis-Bacon regulations. Bidders must also comply with EEO, ADA, and environmental regulations, and must submit complete electronic proposals including bid forms, subcontractor lists, insurance certificates, responsibility certifications, and bid bonds through PennBid. A fee of 0.0033% of the contract value up to $5,000 is due to PennBid upon award. Work must begin no later than April 15, 2026, and be completed by July 14, 2026. All materials must meet approved standards, substitutions require written permission, and performance will be inspected and accepted on-site based on density and mixture testing criteria. No CAGE code or AAC/TAS/ACRN information is provided, payment processes are not detailed, and no COR or COTR is listed, though oversight is assigned to HUD or its designee. Bidders must be registered with a UEI and complete all affirmative certification forms, though no socioeconomic status or Section 3 designations are claimed in the submitted documentation.
Delaware County

POSTED

about 22 hours ago

DEADLINE

in 18 days
NAICS: 237310
New
International
2026 Territorial Drive Widening - Phase 1 & 2The 2026 Territorial Drive Widening Phase 1 & 2 Project aims to enhance traffic operations, safety, and capacity along a major corridor in the City of North Battleford, Saskatchewan. Phase 1 focuses on widening the intersection of Territorial Drive and the adjacent Service Road to increase turning radii and pavement width, improving maneuverability for all vehicles, particularly large commercial trucks, transit buses, and emergency vehicles, while also including a pavement overlay on the southbound lanes to extend their service life. Phase 2 extends the widening efforts northbound from the Carlton Trail intersection to the Airport Road intersection, adding lane width to improve traffic flow and reduce congestion on this heavily used stretch of roadway. The project is being executed in two distinct phases to ensure systematic improvements across the corridor while minimizing long-term disruption. All qualified contractors are invited to submit bids to perform the work as the Prime Contractor, with proposals due to the City Clerk's Department by August 6, 2026, either by mail or email. Questions regarding the bid documents must be submitted by August 4, 2026. The solicitation is identified by number 20260724 and was posted on July 25, 2026, with the formal closing time set for 8:30 PM on the due date. Bids must be directed to the City Clerk’s Department at 1291-101st Street, PO Box 460, North Battleford, SK S9A 2Y6, or emailed to tenders@cityofnb.ca, with the City Clerk’s Department serving as the primary point of contact for all inquiries.
City of North Battleford

POSTED

2 days ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The contract involves the reactivation and construction work on the Kitnayakwa Forest Service Road (FSR), specifically the first 1.8 kilometers which requires light brushing prior to construction commencement. The scope includes subgrade preparation, installation of two culverts, and surfacing over a 280-meter section from the start of construction. This work is essential to facilitate the installation of a supplied 18-meter bridge, with no further construction planned beyond this 280-meter mark. Surfacing material is expected to be sourced from road fill, but if additional surfacing is needed, the contract will be amended to include pit run material from a designated existing pit located at the junction of Br. 19 and Kitnayakwa FSR. Bidders are instructed to base their bids on surfacing using road cut material. All questions related to the contract must be submitted in writing by 11:00 am on April 14, 2026, and responses will be made available by April 16, 2026. Tender submissions must comply with the specified terms and conditions within the tender package, noting that certain forms of bid deposit are not eligible for electronic bidding. The contract emphasizes that the lowest bid may not necessarily be accepted, and results will be posted on BC Bid following the tender opening and contract award. Additional contracting advisories and guidance can be accessed through a specified government website. The solicitation was posted on March 26, 2026, with a submission deadline of April 28, 2026, and is managed by the Skeena Business Area of BC Timber Sales under the Government of Canada.

General Info

Reactivate Kitnayakwa FSR’s first 1.8 km, install culverts, and surface 280 meters for bridge installation.

Agency

Government of Canada → Skeena

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Skeena
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Skeena
Office AddressN/A
Contacts
Contracting Authority

Full Description

Show more
1.8 km of reactivation, consisting of light brushing is required before the start of construction. Subgrade construction, two culvert installs, and surfacing of the Kitnayakwa FSR (Spur 1) is for 280 m from the start of construction. The construction is necessary to necessitate the installation of the supplied 18 m bridge. No further construction is anticipated past 0+280 m.Final surfacing material is expected to be from road fill material. If further surfacing is required, the contract will be amended for final surfacing with pit run. A pit run location and rip rap location has been identified as an existing pit at the start of the reactivation, specifically the junction of Br. 19 and Kitnayakwa FSR at 19 km. Bidder are asked to bid with surfacing from road cut material.Questions & AnswersAll contract related questions must be submitted in writing ONLY to the following email address: Forests.SkeenaTimberSalesOffice@gov.bc.ca. Deadline for receiving questions is 11:00 am on April 14, 2026. If questions are received, a Question & Answer document will be posted to BC Bid by April 16, 2026.Tender submissions must be submitted in accordance with the terms and conditions specified in the tender package.If your bid deposit is in the form of cash, money order, certified cheque or bank draft, you will not be able to e-bid. See allowable submission delivery method(s) above. Also see Conditions of Tender for acceptable bid securities.The lowest priced or any tender will not necessarily be accepted.Unverified bid results will be posted to BC Bid after tender opening and once awarded the contract award results will be available on BC Bid.Please see the following website forimportant BCTS Contracting advisory notices and guidance information:https://www2.gov.bc.ca/gov/content/industry/forestry/bc-timber-sales/contractingTimber Sales ManagerSkeena Business AreaBC Timber Sales