Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Encroachment Permit 1225-6US-0671

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Caltrans, District 12 - Orange

Place of Performance

Buena Park, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 12 - Orange
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 12 - Orange
Office AddressN/A
Contacts
Bahar HeydariAssociate Environmental Planner

Full Description

Show more
The applicant, Southern California Edison, under Encroachment Permit 12-25-6-US-0671, proposes removal and replacement of a deteriorated transmission pole #1353353E on State Route 39 in the city of Buena Park, County of Orange. Ground disturbance for the wood pole removal would include excavation by truck-mounted auger and/or backhoe measuring approximately 2-3 feet in diameter and approximately 7-11 feet deep. Work activities would generally take place within a 50-foot buffer around the pole. No vegetation removal is required. The purpose of the project is to replace the deteriorated pole. The total Disturbed Soil Area is unknown. The work proposed by the applicant will occur within Caltrans Right of way. No new right of way is required..

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
24-17.10
Solicitation # 24-17.10
Project 24-17.10 involves the electrical construction of the Piqua 69kV The Site Substation for the City of Piqua, Ohio. With an engineer's estimate of $1,310,000, the scope of work includes furnishing and installing a complete electrical system, including wiring for major equipment, relay controls, power distribution, and grounding. The contractor is responsible for installing owner-purchased major equipment as well as providing contractor-supplied materials such as substation stone, aggregate subbase, lighting fixtures, and above-ground conduits. Technical requirements include adherence to specific civil site plans for grading and drainage, as well as strict concrete and earthwork compaction standards. The contract is governed by EJCDC C-700 Standard General Conditions and C-800 Supplementary Conditions. Bidders must provide a bid bond for 10 percent of the total bid amount and, upon award, furnish performance and payment bonds equal to the contract price. Compliance with State of Ohio Prevailing Wages, the Americans with Disabilities Act, and Drug-Free Workplace programs is mandatory. Award selection is based on a comparison of the relative merits of each offering. Payment is processed monthly through the contract administrator, with 90 percent of equipment value payable upon undamaged delivery and final payment contingent upon the satisfactory energization and acceptance of the total system.
City of Piqua

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 237130
New
Federal
FCI Marion - Emergency Repair Tornado Damage
Solicitation # 15BBNF26Q40900001
The Federal Bureau of Prisons, Federal Correctional Institution (FCI) Marion in Marion, Illinois, is seeking a single award from a responsible small business to perform emergency repairs for tornado damage. The scope of work includes providing all necessary equipment, labor, and materials to replace two transformers and the 3-phase overhead primary distribution line. This is a 100 percent small business set-aside under NAICS code 237130, with a size standard of 45 million dollars. The contract is a firm fixed price agreement with a mandatory performance period of 90 calendar days, requiring work to begin within 10 calendar days of the notice to proceed. Interested offerors must be registered in the System for Award Management (SAM) and submit quotations by December 03, 2026, at 12:00 pm Eastern Time. Submissions must include a specification sheet, submittal information, and specific documentation including a bid bond, criminal history check forms, and a responsibility questionnaire with at least five references from the last 24 months. A site visit is scheduled for October 28, 2026, requiring prior NCIC background check approval. Award evaluation will focus on contractor responsibility and past performance, and the selected contractor must adhere to strict security clearances, prevailing wage requirements, and government inspection standards.
Fao

POSTED

1 day ago

DEADLINE

in about 2 months
View Details
NAICS: 237130
New
SLED
IFB-26-27-015-Brookview Road Transmission Pole Access Road
Solicitation # IFB-26-27-015
The City of Danville is soliciting bids from Virginia-licensed contractors for the construction of an access road off Brookview Road to provide access to electrical transmission poles. Located within a 100-foot wide City easement on parcel 00182, the scope of work includes mobilization, clearing, grubbing, grading, the installation of storm culverts, curb and gutter, and paving. Technical specifications require a heavy-duty pavement section consisting of a 2-inch asphalt surface course, a 2-inch binder course, and an 8-inch aggregate base course. The project also includes a stormwater Best Management Practice and requires the contractor to provide an as-built survey. Bids are due by October 8, 2026, and will be awarded to the lowest responsive and responsible bidder based on a lump sum base bid, with unit prices used only for valuing approved changes. The project timeline specifies substantial completion within 60 calendar days and final completion within 75 calendar days from the Notice to Proceed. Contractors must provide a 5% bid bond, as well as 100% performance and payment bonds, with the performance bond remaining in effect for one year after final acceptance. Liquidated damages are set at $500 per day. Key compliance requirements include adhering to OSHA and VOSH clearances, maintaining a minimum 20-foot distance from energized transmission lines, and following VDOT Road and Bridge Specifications. Additionally, the contract mandates a drug-free workplace, equal employment opportunities, and a 24-month guaranty period for defects following acceptance. Payment terms include a 5% retainage withheld from invoices until final completion.
City of Danville

POSTED

2 days ago

DEADLINE

in 2 days
View Details
NAICS: 237130
New
SLED
Water Meter Gateway Tower
Solicitation # CIP PW 26-30
The City of Lathrop is soliciting bids for the Water Meter Gateway Tower project (CIP PW 26-30) located at 2908 Hemsworth Court, Lathrop, California. The project involves the construction of an 80-foot tall, self-supporting triangular lattice steel data transmission tower that is TIA-222-I compliant and capable of withstanding 110 mph wind gusts. The scope of work includes providing CA engineer-stamped plans, constructing a drilled concrete pier and pad, installing a city-furnished NEMA 3-rated equipment cabinet, and running electrical and communication conduits to a control hut. Additional site work includes asphalt removal and replacement and the installation of a traffic-rated concrete box. The facility is designed to support multiple gateway antennae for transmitting data from telemetrically-enabled water meters to City offices. The contract will be awarded to the lowest bidder based on the base bid price, with an engineer's estimate of 125,000 dollars. Work must commence within 10 working days of the Notice to Proceed and be completed within 40 working days. Bidders must provide a 10 percent bid bond, and the successful contractor must provide 100 percent performance and payment bonds, along with a 10 percent warranty bond. As a public works project, compliance with California Labor Code Section 1700 regarding prevailing wages is mandatory. Bids must be submitted in a sealed envelope to the City Clerk by October 20, 2026, and must include proof of current DIR registration. Progress payments will be processed monthly upon review by the project engineer.
City of Lathrop

POSTED

4 days ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
Federal
EIE490 Microreactor Synchronization, Eielson AFB, Alaska
Solicitation # W911KB279A007
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence through a Request for Information for the EIE490 Microreactor Synchronization project at Eielson Air Force Base, Alaska. This initiative involves the design and construction required to install a 45MWth/5 Mwe nuclear microreactor, specifically focusing on extending water, power, communications, and heating systems to support plant operations. A primary objective is the synchronization of the nuclear microreactor and the Combined Heat and Power Plant with the base electrical and steam heating distribution grids. The project is funded via MILCON with a target budget of approximately 135 million dollars. The project timeline indicates that planning and development began in December 2025, with a planned construction award in fiscal year 2028, substantial completion by October 2030, and fiscal closeout in fiscal year 2031. Key site challenges include a high water table and likely soil contamination, including PFAS. The government is currently evaluating the most effective contracting vehicle, considering options such as a standard FAR-based Firm-Fixed-Price contract or an Other Transaction Authority approach like Construction Manager at Risk. This RFI is voluntary and intended for market research under NAICS code 237130 to determine industry capabilities and the optimal project delivery method.
W2SN Endist Alaska

POSTED

4 days ago

DEADLINE

in 10 days
View Details
NAICS: 237130
New
Federal
Request for Information/Market Intelligence Notice: Microgrid Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)
Solicitation # W912QR-PDBOTA-ERCIP_FTSILLCAMPPARKS
The U.S. Army Corps of Engineers, Louisville District, is conducting market research through a Request for Information to evaluate the feasibility of using Progressive Design-Build via an Other Transaction Agreement for the construction of microgrids. These projects aim to provide emergency power support to critical facilities for at least 14 days during utility grid outages. The government is specifically considering two projects: a new 18MW natural gas reciprocating internal combustion engine power plant at Fort Sill, Oklahoma, and the expansion of an existing microgrid at Camp Parks, California, which will include natural gas generators, battery energy storage, and integration with solar PV arrays. This notice is for informational purposes only and does not constitute a formal solicitation. The government is seeking industry feedback on company profiles, experience with Other Transaction Authority and Progressive Design-Build, bonding capabilities, and recommendations for acquisition strategies. Interested parties must submit their responses to the designated point of contact by October 16, 2026. The primary objective is to gather intelligence on commercial practices and risk-sharing terms to shape the final acquisition approach under 10 U.S.C. section 2808a.
W072 Endist Louisville

POSTED

4 days ago

DEADLINE

in 10 days
View Details
NAICS: 237130
New
International
New Underground Electric Service System
Solicitation # NCC-CS-041053-NRFP
The National Capital Commission is soliciting proposals for the installation of a new underground electrical service system at Jacques Cartier Park North in Gatineau, Quebec. The project aims to provide a permanent, higher-capacity power supply to support major events, such as Winterlude, while reducing reliance on diesel generators. The scope of work includes the removal of existing electrical infrastructure and the installation of a new 600V Hydro-Quebec service, a main distribution cabinet, low-voltage distribution for the park and Maison du Vélo, and the provision of power pedestals for temporary event connections. The project is divided into two phases: Phase 1 (Core Scope) focuses on infrastructure and civil works in the western portion of the park near Laurier Street, including chambers CT-1 and CT-2, while Phase 2 (Option Scope) extends to the south-east and north-east kiosks and associated pull manholes. The contract has a one-year term with an option to extend for an additional year. Bidders must be Canadian suppliers and hold specific Régie du bâtiment du Québec (RBQ) licenses, including subclasses 1.4, 1.5, 1.7, and 16, with the electrical subclass requiring a valid CMEQ license. Additionally, the contractor or their subcontractor must be recognized by Hydro-Quebec to perform underground civil and electrical distribution work. Key project requirements include the protection of significant trees, adherence to a spill prevention and response plan, and the reinstatement of the park to its original condition. Award decisions will be based on a two-tiered financial framework; if the combined price for both phases exceeds the budget, the NCC may award the contract for Phase 1 only to the top-ranked proponent. Performance and labour and material payment bonds are required at 50 percent of the project value.
National Capital Commission

POSTED

5 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS