Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Energy Auditor / Technical Energy Analyst

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity is for an Energy Auditor or Technical Energy Analyst to support prime contractors on energy savings performance contracting projects for the City of Pendleton in Oregon. The selected provider will be responsible for conducting comprehensive facility assessments and utility bill analyses to establish energy baselines and identify specific Energy Conservation Measures. Technical requirements include performing preliminary engineering cost analyses and developing savings assumptions through the use of energy modeling software and utility metering tools. The final deliverable for this engagement is a detailed investment-grade Technical Energy Analysis report. Interested parties should note the response deadline of November 10, 2026.

General Info

Energy Auditor for City of Pendleton energy projects; report due by November 10, 2026.

Place of Performance

Pendleton, OR, 97801, USA

Set-Aside

NONE

Documents

This scope was carved out of S-KN0040-00018195.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Professional Services for Energy Savings Performance Contracting

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → City of Pendleton
ContactsNo contacts available
OfficeN/A
Organization / AgencyOregon → City of Pendleton
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs facility assessments and utility analyses for prime contractors on City of Pendleton energy savings performance contracting projects. Conducts facility assessments, utility bill analysis, and develops energy baselines to identify Energy Conservation Measures (ECMs). Performs preliminary engineering cost analysis and develops savings assumptions using utility metering tools and energy modeling software. Delivers an investment-grade Technical Energy Analysis (TEA) report.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
ENVIRONMENTAL TRUST Comprehensive E mergency Management Plan Update & Environmental Engineering and Consulting Services
Solicitation # Environmental-Trust_RFP_FY-2027_Emergency-Plan-Update-Environmental-Services_10202026.pdf
The Confederated Tribes of the Colville Reservation is seeking professional services for a combined maximum budget of $289,497, divided into two primary functional areas. The first area, Emergency Management Planning, is capped at $150,000 and involves updating the 2014 Comprehensive Emergency Management Plan, developing Emergency Support Functions, creating hazard-specific annexes, and establishing the Tribes' first Continuity of Operations Plan and Tribal Threat and Hazard Identification and Risk Assessment. This scope also includes the development of an all-hazards tabletop exercise package and the facilitation of coordination workshops to integrate these planning components. The second area, Environmental Engineering and Consulting Services, is capped at $139,497 and focuses on technical field operations in Nespelem, Washington. Key tasks include biannual groundwater monitoring and testing at the Nespelem Post and Pole site, as well as the characterization, removal, and lawful disposal of hazardous materials at the Nespelem Recycle Center. The contractor must adhere to strict quality standards, including the use of approved Quality Assurance Project Plans and Health and Safety Plans, and provide detailed verification reports. Mandatory monthly progress reports are required for all activities, and all project communication costs must be integrated into the respective task budgets. TERO fees are handled separately by the Tribal Employment Rights Office and are not included in the scope of work budget.
Confederated Tribes of the Colville Reservation

POSTED

about 10 hours ago

DEADLINE

in 8 days
View Details
NAICS: 541620
New
SLED
Debris Monitoring Services
Solicitation # 2026-281
Collin County, Texas, is soliciting proposals for a stand-by contract for debris monitoring services to provide disaster recovery technical program management assistance on an as-needed basis. The primary objective is to ensure that all debris removal operations from public rights-of-way, private property, and other designated areas are documented in strict compliance with FEMA Public Assistance Program guidelines, 2 CFR 200, and other federal or state relief program regulations to maximize cost recovery. The contract features an initial one-year term with five optional one-year renewals. The scope of work includes real-time processing of load tickets via an automated tracking system, submission of daily operational and safety reports, and the validation of contractor invoices. All project documentation must be retained for at least seven years. The contract will be awarded to the responsible contractor offering the best evaluated offer through a multi-phase process involving a compliance review, a detailed proposal assessment, and optional demonstrations. Pricing is based on hourly rates for various specialized positions, such as project inspectors and grant management consultants. Per updated terms, all rates must be all-inclusive of insurance, taxes, overhead, and profit, with no separate payments for mobilization or demobilization. Additional charges must be structured as direct reimbursable expenses adhering to federal FEMA policies. Successful proposers may be required to provide performance and payment bonds for 100 percent of the contract total and must certify compliance with the Buy America Act, Davis-Bacon Act, and various federal labor and safety standards.
Fire Marshal

POSTED

about 19 hours ago

DEADLINE

in 1 day
View Details

More opportunities from Oregon → City of Pendleton

Same awarding agency

NAICS: 541330
SLED
Professional Services for Energy Savings Performance Contracting
Solicitation # S-KN0040-00018195
The City of Pendleton, Oregon, is soliciting Statements of Qualifications from Energy Service Companies (ESCOs) to provide professional services for an Energy Savings Performance Contracting (ESPC) program. This solicitation uses a one-step, qualifications-based selection process to identify the three highest-ranked responsive and qualified ESCOs for separate professional services agreements. The scope of work is limited to professional consulting services authorized via written task orders and specifically excludes physical construction, equipment installation, or design-build delivery. Services are divided into four phases: Technical Energy Analysis, Project Development Planning, ECM Design and Implementation Support, and Performance/Measurement and Verification (M&V) services. Potential improvement areas include HVAC controls, lighting, water conservation, solar, battery storage, and EV charging. To be eligible, respondents must be currently qualified under the Oregon Department of Energy (ODOE) ESCO Qualification Program and possess at least ten years of demonstrated ESPC or comparable turnkey energy services experience. The City will evaluate proposals based on Oregon municipal ESPC experience, water/wastewater facility expertise, project team qualifications, M&V approach, local presence, ability to secure grants, financial strength, and references from Oregon public entities. Proposed compensation must not be included in the submission. Selected agreements will have an initial four-year term with the possibility of three two-year extensions, for a maximum of ten years. Hard copy submissions are due by November 10, 2026, and must not exceed 30 printed sides to be considered responsive.
Engineering Services

POSTED

14 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS