Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Engineering and Inspection Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract is for engineering and inspection services aimed at ensuring third-party verification of compliance with project specifications and Georgia DOT standards, focusing on quality assurance throughout the project lifecycle. It is issued as a subcontract under NAICS code 541330 by the Putnam County Board of Commissioners in Georgia, with the solicitation posted on August 6, 2026, and responses required by September 3, 2026, at 7:00 PM. The work is intended to support infrastructure projects within the state, requiring rigorous adherence to state transportation guidelines and technical specifications. All inspection activities must be conducted by qualified entities capable of delivering objective assessments and documented compliance reports to meet regulatory requirements. The place of performance and specific project location are not designated in the provided details, indicating the scope may cover multiple sites across the county or region.

General Info

Engineering and inspection services for Georgia DOT compliance under subcontract, due September 3, 2026.

Agency

Georgia → Putnam County Board of CommissionersView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Putnam County Board of Commissioners
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → Putnam County Board of Commissioners
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Third-party inspection and quality assurance to verify compliance with project specifications and Georgia DOT standards.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms to provide comprehensive design, bidding support, and engineering services during construction for the Corydon Well Replacement Project in California. The project involves designing a new municipal groundwater production well to replace and decommission the existing Corydon well, with work divided into two phases: Phase 1 focuses on technical specifications, civil site design, line-bid items for drilling and abandonment, and full-time on-site construction management oversight; Phase 2 covers detailed architectural, civil, mechanical, structural, electrical, and instrumentation and controls design, along with a line-item bid schedule for equipping, testing, and commissioning the new well. The well must comply with AWWA potable water standards, feature a 24-inch stainless steel Ful-Flo louvered screen, match existing vertical turbine pump systems, and tie into the Corydon Blend station and Malaga blending location, meeting all requirements from the State Water Resources Control Board, Department of Water Resources, and Elsinore Valley Municipal Water District. The consultant will prepare a Preliminary Design Report, review up to 200 submittals, assist with domestic water supply permit amendments, and develop record drawings reflecting field changes while supporting start-up, commissioning, and operator training. Proposals must demonstrate relevant qualifications and experience with utilities or government agencies, a clear understanding of the project scope, a feasible schedule with risk mitigation strategies, innovative yet practical solutions, cost transparency, and overall proposal quality. The award will be based on demonstrated competence and professional qualifications, not lowest cost. Submission requires strict adherence to formatting guidelines including a cover letter, detailed staff resumes, representative project lists, three professional references, district contract history, and a fully itemized cost proposal broken down by task. Required certifications and documentation include American Iron and Steel Compliance, Lobbying Certification, Debarment and Suspension Certification, System for Award Management information, Executive Order N-6-22 Certification, Conflict of Interest Disclaimer, Insurance Acknowledgment, and Public Works Contractor Registration—all submitted via Attachment “2.” Additionally, the contractor must comply with Build America Buy America requirements, including domestic-content certifications and waiver memoranda for non-compliant materials, and adhere to federal mandates on telecommunications restrictions, anti-trafficking, environmental recovered materials, civil rights compliance, and sanctions against Iran and Russia. The proposal submission deadline is September 1, 2026, via the PlanetBids portal, with questions due by August 2
Ardurra Group, Inc.

POSTED

about 14 hours ago

DEADLINE

in 25 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project - Professional Design, Bidding Support, Engineering Services During Construction
Solicitation # corydon-well-replacement-project-professional-design-bidding-support-engineering-services-during-0
The Corydon Well Replacement Project, managed by Elsinore Valley Municipal Water District, seeks professional design, bidding support, and engineering services during construction for a critical water infrastructure upgrade in Lake Elsinore, California. The scope of work encompasses full-service engineering support from initial design through construction phase, ensuring technical accuracy, regulatory compliance, and efficient project delivery. The solicitation is open to qualified firms with experience in water system engineering and is specifically set aside for Disadvantaged Business Enterprises under Department of Transportation guidelines, reflecting a commitment to inclusive contracting. The project is identified under bid/contract number C2305 and falls under NAICS code 541330 for architectural and engineering services. The solicitation was posted on August 7, 2026, with a response deadline of September 1, 2026, and is being administered by AKM Consulting Engineers, which serves as both the contracting agency and point of contact. Primary communications regarding the solicitation should be directed to Katie Neubauer via phone or email provided. Although specific address details for the office or performance location are not listed, the project’s physical performance is confirmed to be in Riverside County, California. Interested parties are encouraged to review the full solicitation details through the official SBA opportunity portal to ensure alignment with all submission requirements and eligibility criteria for DBE participation.
AKM Consulting Engineers

POSTED

about 14 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project involves designing a new municipal groundwater production well to replace and permanently abandon the existing Corydon Well on Elsinore Valley Municipal Water District property, with full engineering and construction support services required throughout both design and implementation phases. The scope encompasses hydrogeological evaluation, aquifer analysis, well design adhering to AWWA standards and matching the existing casing depth with a 24-inch stainless steel Ful-Flo louvered screen, civil and structural site design including grading, drainage, and utility coordination, mechanical and electrical engineering for well equipping, instrumentation and SCADA systems, geotechnical and soil testing, water quality sampling, environmental permitting with SWRCB and NPDES compliance, borehole geophysical logging, and comprehensive construction management with full-time on-site oversight during drilling and equipping. The project is divided into two phases: Phase 1 focuses on technical specifications, site design, bidding support, and construction management for drilling and abandonment, while Phase 2 covers detailed architectural, mechanical, structural, and electrical designs for facility equipping, testing, and commissioning, supported by engineering services during construction. Compliance with the Build America, Buy America Act and 2 CFR Part 184 is mandatory, requiring documented sourcing of domestic iron, steel, and manufactured products, along with certification of non-collusion and adherence to federal procurement rules. The consultant must submit a cost proposal with hourly rates broken down by task, capped at a not-to-exceed amount of $1,000,000, partially funded by a $400,000 BOR Grant, with the remainder covered by non-federal sources. The solicitation requires proposers to demonstrate relevant experience in municipal groundwater projects, provide detailed resumes of proposed key personnel including licensed California professionals, and confirm current certifications including DBE, MBE, WOSB, or small business status, as the set-aside prioritizes small, disadvantaged, and minority-owned businesses. Subcontractors must also meet these certifications and be disclosed in the proposal. Required documentation includes a Conflict of Interest Disclaimer, American Iron and Steel Certification, Certification Regarding Lobbying, Debarment and Suspension Certification, SAM registration, Public Works Contractor Registration, Executive Order N-6-22 Certification confirming no ties to sanctioned Russian entities, and a California Air Resources Board Certificate of Reported Compliance. Proposals must be submitted via the PlanetBids portal by September 1, 2026, and must include a cover letter, three references, insurance
GEI Consultants, Inc.

POSTED

about 14 hours ago

DEADLINE

in 25 days
View Details
NAICS: 541330
New
SLED
Engineering Services – Emergency Generator Installation for Municipal Wells (3 Sites)
Solicitation # 26-31
Murray City is seeking qualified engineering firms to provide professional engineering services for the design, bidding, and construction support of emergency backup power systems at three municipal culinary water wells, funded in part by a federal EPA Community Grant and subject to 2 CFR Part 200 Uniform Guidance. The project, identified as RFQ 26-31, has an estimated budget of $120,000 and follows a Qualifications-Based Selection (QBS) process in alignment with the Brooks Act, meaning price will not be considered during evaluation. The selection process is two-phased: Phase I involves independent scoring of Statements of Qualifications (SOQs) based on project understanding, relevant experience with water systems and generators, qualifications of key personnel, experience with federally funded projects, past performance, and familiarity with local conditions, totaling 200 points. The top three firms will proceed to Phase II interviews, where they will be scored on technical approach, risk understanding, continuity of water operations, federal compliance, team availability, schedule coordination, and scenario-based responsiveness, adding another 100 points for a maximum combined score of 300. The highest-ranked firm will be selected for contract negotiation, during which scope and fee will be finalized under a time and expense basis. Work will be performed at three specific sites in Murray City, including 6722 South Courtland Avenue, 2205 East Eagle Ray Court, and an additional well within the city limits. The consultant must demonstrate compliance with all applicable federal, state, and local regulations, including Davis-Bacon Act wage requirements, Build America, Buy America (BABA), American Iron and Steel (AIS), Clean Air Act, Federal Water Pollution Control Act, and Utah Division of Drinking Water standards. Additional mandates include maintaining professional liability insurance of at least $2 million with appropriate coverage terms, adhering to confidentiality obligations for non-public information, disclosing potential conflicts of interest per 2 CFR 200.318(c), and certifying compliance with the Byrd Anti-Lobbying Amendment and debarment status via SAM.gov. SOQs must not exceed 16 pages excluding cover pages and resumes and must be submitted by September 7, 2026, via the Utah Public Procurement Place (U3P) platform or as a sealed hard copy to Murray City’s Purchasing Agent. All services must be performed according to a detailed schedule submitted with the proposal, with time deemed of the essence. Payment
Utah

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
International
Forestry and Parks - Request for Proposal - ENGINEERING, DESIGN AND CONSTRUCTION ADMINISTRATION CONSULTANT SERVICES at Moose Mountain Parking Upgrades at Kananaskis Public Land Use Zone
Solicitation # AB-2026-05557
The Consultant will be responsible for reviewing and validating the Integrated Development Plan for parking area upgrades at three locations within the Kananaskis Public Land Use Zone — the Base of Moose Mountain Road, the 2 Kilometer Parking Area, and the Top of Moose Mountain Road — with total new disturbances of approximately 0.429 hectares across the sites. This includes conducting field validation of proposed improvements, refining designs based on ground conditions, constructability, environmental constraints, regulatory compliance, traffic flow, parking functionality, and operational needs, all while adhering to approved disturbance limits unless additional approval is obtained from Alberta Forestry and Parks. The Consultant must apply proven non-urban park design practices throughout all project phases, from assessment and conceptual design through detailed design, regulatory approvals, tender documentation, construction administration, and final project close-out. The work requires full engineering and design services to deliver safe, efficient, and environmentally responsible parking infrastructure upgrades, including improved traffic circulation, vehicle movement, and site access. The project must be initiated within five business days after contract execution and completed by February 28, 2028, with all design, approvals, and construction oversight delivered on schedule. The locations are precisely defined by geographic coordinates, and the Consultant must work closely with the Province to ensure alignment with all regulatory, environmental, and operational expectations. The project is managed by Alberta Forestry and Parks, with Monica Purewal serving as the primary point of contact, and the solicitation number AB-2026-05557 governs all aspects of engagement.
Forestry and Parks

POSTED

about 20 hours ago

DEADLINE

in 27 days
View Details
NAICS: 541330
New
SLED
26-0088-2 Design Engineering Consultant for Wahlstrom/Forbes Pavement & Drainage Reconstruction
Solicitation # PE-77548-NONST-2027-000000401
Chatham County is soliciting proposals from qualified consulting firms to provide professional engineering services for pavement and drainage improvements along Wahlstrom Road and Forbes Road, aiming to resolve existing drainage issues and enhance the structural integrity of the roadway. The project requires a comprehensive evaluation of the current pavement conditions and the development of targeted recommendations for resurfacing and structural upgrades capable of supporting the high volume of heavy truck traffic alongside regular passenger vehicles. The selected firm must assess existing infrastructure, identify deficiencies, and propose durable solutions that extend the service life of the roads while improving overall performance and safety. The solicitation, titled Design Engineering Consultant for Wahlstrom/Forbes Pavement & Drainage Reconstruction with number PE-77548-NONST-2027-000000401, was posted on August 6, 2026, with a response deadline of September 8, 2026. The work is to be performed within Chatham County, Georgia, and the procurement is conducted under the state’s SLED agency framework. Interested firms should submit their proposals by the stated deadline, with all inquiries directed to Sabrina Tippett at stippet@chathamcounty.org. The opportunity is open to qualified vendors with demonstrated expertise in roadway design, pavement analysis, and drainage system engineering.
Chatham County

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Georgia → Putnam County Board of Commissioners

Same awarding agency

NAICS: 237110
New
SLED
Concrete Culvert ConstructionThe contract entails the construction of a triple 9-foot by 5-foot concrete culvert, encompassing all associated work such as formwork assembly, reinforcement installation, concrete pouring, and proper curing procedures, along with full site coordination to ensure seamless execution. The work must meet all applicable engineering and safety standards, with attention to precise dimensions, structural integrity, and long-term durability under expected environmental and load conditions. All materials and methods must comply with industry best practices and local regulatory requirements, and the contractor is responsible for managing logistics, labor, equipment, and timelines to complete the project efficiently and without disruption. This subcontract is issued by the Putnam County Board of Commissioners in Georgia under NAICS code 237110 for sewer and water infrastructure construction, with a response deadline of September 3, 2026. The solicitation opened on August 6, 2026, and while specific location details within the county are not provided, performance is expected to occur within Putnam County. There is no set-aside designation indicated, and the contract opportunity is accessible through the Georgia Department of Administrative Services portal via the provided link. Contractors must ensure full compliance with contractual obligations, including scheduling, reporting, and quality control, to fulfill the scope without delay or deviation.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 27 days
View Details