This Solicitation opportunity from California was posted on September 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Engineering Design Services During Construction for Bermuda Drive Bridge Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Background The City of San Mateo is seeking proposals for Engineering Services During Construction for the Bermuda Drive Bridge Replacement Project. This project aims to replace the existing bridge, which serves as a critical link between Fiesta Drive and Annapolis Drive, providing access to adjacent housing developments. The current bridge, constructed in 1954, has been found to have significant structural deficiencies and safety concerns, necessitating its replacement with a new design that enhances structural integrity and safety features. Work Details The selected consultant will provide engineering technical consultation during the construction of the Bermuda Drive Bridge Replacement Project. The scope of services includes: 1. Regulatory Permit Compliance: Ensure compliance with applicable permits including biological monitoring, dewatering activities management, and habitat restoration plans. 2. Coordination Services: Coordinate with utility companies and Native American tribes as needed. 3. Clarification and Interpretation of Contract Documents: Serve as a technical resource on design-related matters and respond to Requests for Information (RFIs). 4. Review of Submittals: Conduct technical reviews of shop drawings and material submittals for compliance with contract documents. 5. Construction Oversight and Field Visits: Provide professional engineering support through periodic field visits to observe contractor work. 6. Biological Support Services: Conduct biological monitoring during construction activities, including nesting bird deterrence and annual monitoring of plant cover. Period of Performance The project is scheduled to commence with utility relocation in January 2026, followed by two phases of bridge construction from April 2026 to February 2028. This will conclude with a three-year plant establishment period post-construction. Place of Performance The work will be performed at the Bermuda Drive Bridge over Borel Creek in San Mateo, California. Bidder Requirements Proposers must comply with federal regulations due to partial funding from Caltrans. There is a Disadvantaged Business Enterprise (DBE) goal of 8% participation for this project.
General Info
Place of Performance
CA, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
