This Solicitation opportunity from Oklahoma was posted on August 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Engineering Services Demolition Plans and Specifications for Boomer Lake Station Power Plant
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Stillwater Utilities Authority is seeking qualified engineering firms to develop comprehensive demolition plans, specifications, and bid documents for the decommissioning of the Boomer Lake Station Power Plant in Stillwater, Oklahoma. The project involves preparing detailed, bid-ready plans that ensure compliance with all relevant regulations, including OSHA, EPA, and state agencies, while addressing hazardous materials such as asbestos. The power plant, constructed in phases from 1955 through 2004, is currently inactive but deteriorating, situated adjacent to Boomer Lake and Boomer Lake Park. The scope of services includes site review, environmental assessment, hazard abatement coordination, cost estimation, and bid support, with optional construction oversight. The project timeline anticipates RFQ issuance on August 30, 2025, with responses due by October 1, 2025, and contract award expected in November 2025, contingent upon funding and approval. Respondents are required to submit a comprehensive package including a cover letter, firm profile, key personnel credentials, relevant project experience, and a detailed project approach. The evaluation will prioritize relevant experience (40%), team qualifications (25%), technical methodology (25%), and schedule (10%). The selected firm will enter into a formal agreement with the SUA, with the process managed through an online portal. The contract size is estimated between $500,000 and $2,000,000. Additional background information indicates minimal known hazardous materials, with existing environmental reports and drawings available for review. The RFQ emphasizes transparency, adherence to submission procedures, and the SUA’s right to reject responses, ensuring a competitive and compliant selection process for this significant demolition project.
General Info
Place of Performance
OK, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Milestone
Date
RFQ Issued
8/30/2025
Deadline for Questions
9/24/2025 – 5:00 PM CDT
Responses Due
10/1/2025 – 3:00 PM CDT
Selection of Consultant
October 2025
Contract Award
November 2025
5. RESPONSE REQUIREMENTS · Cover Letter – Brief introduction, statement of interest, and summary of qualifications. · Firm Profile – Size, location(s), history, and description of services. · Project Team – Names, titles, and qualifications of key personnel. · Relevant Experience/References – At least three similar demolition design projects with references. · Project Approach and Methodology – Describe the technical approach and compliance strategy. · Schedule – Proposed timeline for completing the work. 6. EVALUATION CRITERIA Qualifications will be evaluated according to the following criteria:
Evaluation Factor
Weight
Relevant project experience
40%
Qualifications of proposed team
25%
Technical approach and understanding of project
25%
Proposed schedule
10%
7. SUBMISSION INSTRUCTIONS All responses are to be submitted through Stillwater’s online portal; register at https://stillwater.ionwave.net. Questions about the RFQ should be submitted through the Ionwave portal and will be answered on the portal. Oral discussions are encouraged for clarification purposes; however, respondents shall not rely on oral responses to questions. No oral statements by any person shall modify or otherwise affect the provisions of this Request for Proposals and/or any contract resulting therefrom. All modifications, addenda or amendments must be made in writing by the SUA. 8. GENERAL CONDITIONS · The SUA reserves the right to reject any or all responses. · All costs incurred in the preparation of the response are the responsibility of the proposer. · The selected Consultant will enter into a written agreement with the SUA. · This RFQ and the selected response will be incorporated into the final contract. · Award is subject to availability of funds and SUA Trustee approval. 9. SUPPLEMENTAL INFORMATION · Asbestos-containing materials (ACM) - The only ACM known at this time is insulation blanketing encased between the inner and outer walls of the Unit #2 boiler. All but that asbestos was abated plant wide in the early 1990’s. · Lead-based paint (LBP) – We are not aware of any LBP · Polychlorinated biphenyls (PCBs) – We are not aware of any PCBs · Universal waste - Not Aware · Structural integrity concerns – Not Aware · Available Reports/Documents: Phase I ESA, Phase II ESA, original drawings, lead paint test results. See the “attachments” tab in the bid portal for this information.
More opportunities from Oklahoma → City of Stillwater
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
