Enhanced Watershed Management Programs (EWMP) Program EIR

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Inglewood is forecasting a project under the Enhanced Watershed Management Programs to manage stormwater runoff from an 857-acre drainage area within the Ballona Creek Watershed. The primary objective is to reduce pollutant loads entering Centinela Creek through the installation of an infiltration chamber, diversion structure, pretreatment device, dry creek channel, and bioretention area. To facilitate these installations, the project will involve the relocation of various utilities within the park. Beyond environmental infrastructure, the project includes the restoration and enhancement of park amenities affected by construction, including play fields, trails, exercise areas, lighting, and parking lots. The initiative incorporates mitigation measures and findings from the certified EWMP PEIR to ensure that all potential impacts remain less than significant. The project is located in Inglewood, California, and is coordinated by the city's Stormwater Runoff Coordinator.

General Info

Inglewood project managing stormwater runoff via infrastructure installation and park amenity restoration.

Agency

California → City of Inglewood

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Warren Lane / Centinela Ave, Inglewood, CA, 90301

Set-Aside

NONE

Documents

(1)

NOD Addendum to 2015 EWMP PEIR for EVJr

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Inglewood
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Inglewood
Office AddressN/A
Contacts
Anna GroehnertStormwater Runoff Coordinator

Full Description

Show more
The Project would capture, treat, and infiltrate stormwater runoff from an 857-acre drainage area within the Ballona Creek Watershed to reduce pollutant loads to Centinela Creek, a tributary to the Ballona Creek Estuary, and provide aesthetic and recreational enhancements. Project components include an infiltration chamber, a diversion structure, a pretreatment device, a dry creek channel, and a bioretention area. The Project includes restoration and enhancement of park amenities disturbed by construction of stormwater facilities, such as play fields, trails, exercise areas, seating, signage, lighting, and parking lot improvements. The Project would relocate various utilities within the Park to accommodate the stormwater facilities. The Addendum has incorporated applicable mitigation measures from the MMRP, findings of fact, and statement of overriding considerations of the certified EWMP PEIR (May 2015) to ensure all potential impacts remain less than significant.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. The scope of work includes dredging within federal jurisdiction to a depth of -12 feet Mean Lower Low Water with a 1-foot overdepth, involving the removal and ocean disposal of gravel, sand, silt, and clay. Additionally, the project requires revetted mole repairs, which encompass clearing and grubbing, CRM wall repair, tree and vegetation removal, and the reworking or installation of stone to fill voids. The performance period is 200 calendar days from the notice to proceed. The solicitation is an invitation for bid under NAICS code 237990, with a response deadline of September 30, 2026. Bids must be submitted in sealed envelopes, as electronic submissions are not permitted. Evaluation is based on a pass/fail gate for compliance and completeness, with a bid guarantee required at 20 percent of the bid price or 3 million dollars, whichever is less. The contract emphasizes strict quality management, requiring the use of the USACE National Dredging Quality Management Program and a physical on-site presence for the Quality Control Manager. Payment will be processed through the USACE Finance Center, and the project must adhere to EM 385-1-1 safety requirements and specific environmental protections for the Hawaiian hoary bat pupping season.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility at the South Bay Water Reclamation Plant aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trades including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.