Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Oregon Gulch Restoration Project (Notification of Lake or Streambed Alteration, No. EPIMS-TRI-66943-R1)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has entered into Lake and Streambed Alteration Agreement EPIMS-TRI-66943-R1 with Dustin Tillinghast for the Oregon Gulch Restoration Project. This action is required to address unauthorized activities, including stream channel relocation and impoundment, to comply with a Notice of Violation and Investigative Order R1-2023-0036 from the North Coast Regional Water Quality Control Board. The scope of work focuses on restoring floodplain connectivity and removing obstructions within Oregon Gulch and its tributaries. Key activities include the removal of one stream crossing, breaching a constructed channel in four locations, clearing remnants of an onstream impoundment, and removing deleterious materials from state waters. The project is managed by the California Fish and Wildlife Northern Region.

General Info

Dustin Tillinghast will restore Oregon Gulch to resolve water quality violations and obstructions.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-TRI-66943-R1_Tillinghast_Oregon Gulch Restoration_CEQA NOE

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Matthew MitchellSenior Environmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-TRI-66943-R1, pursuant to Section 1602 of the Fish and Game Code to Dustin Tillinghast. The purpose of the project is to implement corrective actions to comply with Cleanup and Abatement and Water Code Section 13267 Investigative Order No. R1-2023-0036 from the North Coast Regional Water Quality Control Board, and a CDFW Notice of Violation, for impacts to Oregon Gulch and associated tributaries resulting from unauthorized activities including stream channel relocation, impoundment, and obstruction. The project will include removal of one stream crossing, breaching of a constructed channel in four locations to restore floodplain connectivity, removal of the remnants of an onstream impoundment to restore additional floodplain connectivity, and removal of deleterious materials placed where they may enter waters of the state.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. The scope of work includes dredging within federal jurisdiction to a depth of -12 feet Mean Lower Low Water with a 1-foot overdepth, involving the removal and ocean disposal of gravel, sand, silt, and clay. Additionally, the project requires revetted mole repairs, which encompass clearing and grubbing, CRM wall repair, tree and vegetation removal, and the reworking or installation of stone to fill voids. The performance period is 200 calendar days from the notice to proceed. The solicitation is an invitation for bid under NAICS code 237990, with a response deadline of September 30, 2026. Bids must be submitted in sealed envelopes, as electronic submissions are not permitted. Evaluation is based on a pass/fail gate for compliance and completeness, with a bid guarantee required at 20 percent of the bid price or 3 million dollars, whichever is less. The contract emphasizes strict quality management, requiring the use of the USACE National Dredging Quality Management Program and a physical on-site presence for the Quality Control Manager. Payment will be processed through the USACE Finance Center, and the project must adhere to EM 385-1-1 safety requirements and specific environmental protections for the Hawaiian hoary bat pupping season.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility at the South Bay Water Reclamation Plant aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trades including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 14 days
View Details