Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Millerton State Recreation Area South Finegold Picnic and Temperance Flat Areas Interpretive Display Case Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Parks and Recreation is seeking a contractor to install new interpretive display cases and signs at the South Finegold and Temperance Flat Day Use Areas within the Millerton Lake State Recreation Area in Fresno County. The primary objective of this project is to provide visitors with essential information regarding park rules, operating hours, facility locations, area orientation, and critical water safety tips for unguarded shorelines. This project is classified as a forecast under NAICS code 237990 and is categorically exempt from certain environmental reviews under CCR sections 15301, 15303, and 15304 due to the limited nature of the new structures. The scope of work at each site requires the excavation of two 15-inch by 15-inch by 24-inch deep post holes to secure 4x6 redwood posts with concrete. Contractors must attach a prebuilt display case to the posts, apply a resin stain to all exposed wood, and install educational materials secured by a locking plexiglass window. Project administration is managed by the Central Valley District, with Andrew Collum serving as the primary point of contact and Danielle Gehart as the District Superintendent.

General Info

Contractor to install interpretive signs and display cases at Millerton Lake State Recreation Area.

Agency

California Parks and Recreation, Department of

Place of Performance

Sky Harbour Rd., Wellbarn Rd., CA, 93626

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Andrew CollumEnvironmental Scientist

Full Description

Show more
Install new interpretive display cases and signs at South Finegold and Temperance Flat Day Use Areas in Millerton Lake State Recreation Area to provide visitors with information about park rules, park hours, areas and facilities of interest, and area orientation in relation to balance of park lands. Display case will also relay important water safety tips for visitors entering the water at unguarded shorelines. Using mechanical equipment or hand tools at each site work will: • Excavate two (2) 15-in. x 15-in. x 24-in. deep post holes; • Insert one (1) 4x6 redwood post in each hole and pour concrete to secure; • Attach one (1) prebuilt display case to the posts; • Apply a resin stain to the exposed wood; and • Affix educational/informational materials and secure the case with a locking plexiglass window.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 5 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 6 hours ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS