Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Belmont Pier Dock Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Long Beach is seeking a contractor for the Belmont Pier Dock Replacement Project located in the Belmont Pier Planned Development District. This project involves the construction of a new consolidated concrete dock to serve Long Beach Transit Aqualink and public moorings at the southeast end of the Belmont Pier. The new facility will replace two previous concrete docks and a gangway that were damaged beyond repair during a storm in February 2017. The project aims to restore the dock area to approximately 2,080 square feet, adhering to the standards previously approved under Coastal Development Permit 05-06-214 by the California Coastal Commission. Administrative oversight for the project is managed by planners Kevin Nguyendo and Hugo Liu within the City of Long Beach, California.

General Info

City of Long Beach seeks contractor to replace Belmont Pier concrete dock facilities.

Agency

California → City of Long Beach

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Long Beach, CA

Set-Aside

NONE

Documents

(1)

CE26 - 060 - 35 39TH PL- KN

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Long Beach
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Long Beach
Office AddressN/A

Full Description

Show more
The proposed project (Project) involves the construction of a new consolidated concrete dock for Long Beach Transit Aqualink and public moorings at the southeast end of the Belmont Pier in the Belmont Pier Planned Development District (PD-2). The Project would replace two concrete docks that were damaged beyond repair in a storm event in February 2017. The previous docks (2,080 total square feet of dock area) and gangway were approved under a Coastal Development Permit (CDP 05-06-214) issued by the California Coastal Commission in 2007.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. The scope of work includes dredging within federal jurisdiction to a depth of -12 feet Mean Lower Low Water with a 1-foot overdepth, involving the removal of gravel, sand, silt, and clay for ocean disposal. Additionally, the project requires revetted mole repairs, including clearing and grubbing, CRM wall repair, vegetation removal, and the reworking or installation of stone to fill voids. The performance period is 200 calendar days from the notice to proceed. This solicitation is an Invitation for Bid (W9128A26BA002) set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Bids must be submitted in sealed envelopes by September 30, 2026, as electronic submissions are not permitted. A bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less, is required. Award evaluation is based on a pass/fail gate for compliance and completeness, with labor surplus area status potentially serving as a tie-breaker. The project mandates strict adherence to USACE National Dredging Quality Management Program standards and EM 385-1-1 safety requirements, with a dedicated Quality Control Manager required on-site at all times.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in about 2 months
View Details