Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Athletic Fields Turf Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Foothill-De Anza Community College District is undertaking a project to replace artificial turf systems on six athletic fields, specifically four at Foothill College and two at De Anza College. The scope of work includes the removal of existing turf and infill, localized inspection and repair of the aggregate base, shock pad, and drainage systems, and the installation of new synthetic turf with field markings. All work is restricted to the existing field footprints to ensure there is no expansion of facility use or capacity. The project requires the use of PFAS-free materials and heat-reduction technology, and it must include an end-of-life management plan for recycling or disposal. The project is classified as a forecast with a posted date of August 11, 2026, and is managed by David Fisch, Director of the Capital Construction Program. It has been granted categorical exemptions under CEQA Guidelines Sections 15301 and 15302, as the work constitutes a like-for-like replacement of existing facilities. Performance is expected to take approximately eight weeks per field, with work hours generally scheduled between 7:00 a.m. and 6:00 p.m. on weekdays. Materials are to be acquired through a cooperative purchasing agreement, and the project will be executed on an as-needed basis, starting with the Foothill College football field.

General Info

Contractor to replace artificial turf and infill on six California community college fields.

Agency

California → Foothill-De Anza Community College District

Place of Performance

Perimeter Road and El Monte Road; Campus Drive and S Sterling Road, CA, 94022

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Foothill-De Anza Community College District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Foothill-De Anza Community College District
Office AddressN/A
Contacts
David FischDirector, Capital Construction Program

Full Description

Show more
Foothill-De Anza Community College District will replace the artificial turf systems on four athletic fields at Foothill College and two athletic fields at De Anza College. The project includes removal and replacement of the existing artificial turf and infill; inspection and localized repair the existing shock pad, aggregate base, and drainage system, where necessary, to restore the existing field to its intended function; and installation of new synthetic turf, infill, and field markings. The project would occur entirely within the existing athletic field footprints and would not expand the existing use or capacity of the facilities.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 3 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 6 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS