Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Lake El Estero Aquatic Vegetation Removal

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Monterey is seeking a contractor for the Lake El Estero Aquatic Vegetation Removal project to mechanically remove wigeon grass from the urban lake. Using specialized aquatic harvesting equipment, the contractor will cut and collect vegetation from the surface without disturbing the lakebed. The harvested materials will be staged in designated upland areas for drying before being transported to an approved off-site disposal facility. The primary goals of this project are to restore safe recreational use for activities such as paddle boating, improve water circulation, and support the lake's ecological and hydraulic functions. By implementing best management practices and resource protection measures, the project aims to benefit local residents and visitors while minimizing environmental impacts. The project is managed by the Community Development Director, Kimberly Cole, and will be performed in Monterey, California.

General Info

Contractor to mechanically remove wigeon grass from Lake El Estero in Monterey, California.

Agency

California → City of Monterey

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Monterey, CA

Set-Aside

NONE

Documents

(1)

26_0811 City of Monterey NOE Final

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Monterey
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Monterey
Office AddressN/A
Contacts
Kimberly ColeCommunity Development Director

Full Description

Show more
The project consists of mechanical removal of wigeon grass from Lake El Estero, an existing managed urban lake owned and maintained by the City of Monterey. Vegetation would be removed using specialized aquatic harvesting equipment designed to cut and collect vegetation above the sediment surface without disturbing the underlying lakebed. Harvested vegetation would be temporarily staged in designated upland areas for vegetation dry-out before being transported to an approved off-site disposal facility. The purpose of the project is to restore and maintain safe recreational use of the lake, including paddle boat operations, improve water circulation, support operation of existing lake infrastructure, and maintain the lake's ecological and hydraulic function. The project would benefit the City of Monterey, residents, and visitors by maintaining an existing public recreational facility while minimizing environmental impacts through implementation of best management practices and resource protection measures.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. The scope of work includes dredging within federal jurisdiction to a depth of -12 feet Mean Lower Low Water with a 1-foot overdepth, involving the removal of gravel, sand, silt, and clay for ocean disposal. Additionally, the project requires revetted mole repairs, including clearing and grubbing, CRM wall repair, vegetation removal, and the reworking or installation of stone to fill voids. The performance period is 200 calendar days from the notice to proceed. This solicitation is an Invitation for Bid (W9128A26BA002) set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Bids must be submitted in sealed envelopes by September 30, 2026, as electronic submissions are not permitted. A bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less, is required. Award evaluation is based on a pass/fail gate for compliance and completeness, with labor surplus area status potentially serving as a tie-breaker. The project mandates strict adherence to USACE National Dredging Quality Management Program standards and EM 385-1-1 safety requirements, with a dedicated Quality Control Manager required on-site at all times.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in about 2 months
View Details