Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Baylands Trail Replenishment Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Baylands Trail Replenishment Project, managed by the City of Palo Alto's Public Works Engineering department, involves the repair and elevation of a 250-foot section of trail within the Baylands Nature Preserve. The project aims to mitigate seasonal flooding by adding four 4-inch layers of aggregate, totaling at least 12 inches, to the existing trail surface. This work will result in a stabilized, flood-resilient pathway approximately 9 feet wide, extending from the parking lot east of Embarcadero Road to the Lucy Evans Baylands Interpretive Nature Center. To minimize environmental impact on the tidal marsh ecosystem, the project will utilize hand tools and small machinery. The project is classified as a forecast with a posted date of August 12, 2026, and is located at 2775 Embarcadero Road, Palo Alto, California. It is officially categorized under CEQA Categorical Exemption 15301 as a modification to an existing facility, meaning it is exempt from further environmental review. Key project contacts include Senior Project Manager Megha Bansal and Planning Manager Claire Raybould. While the scope of work and environmental exemptions are detailed, specific contract values, award methodologies, and formal delivery schedules have not been defined.

General Info

Palo Alto project to repair and reinforce a 250-foot stretch of Baylands Trail.

Agency

California → City of Palo Alto

Place of Performance

2775 Embarcadero Road, Palo Alto, CA, Palo Alto, CA, 94303

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Palo Alto
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Palo Alto
Office AddressN/A
Contacts
Megha BansalSenior Project Manager, Public Works Engineering
Claire RaybouldPlanning Manager

Full Description

Show more
The proposed Palo Alto Baylands Trail Replenishment Project entails the replenishment and repair of the surface of the trail leading from the parking lot east of Embarcadero Road west to the Lucy Evans Baylands Interpretive Nature Center. The project is located within the Baylands Nature Preserve, a 1,940-acre open space tract of marshland that is owned by the City of Palo Alto (City). The project site includes: a portion of the San Francisquito Creek Trail, a gravel parking lot that would serve as a staging area, and a portion of Embarcadero Road. The raised trail connecting Embarcadero Road to Baylands Interpretive Nature Center is prone to flooding due to seasonal inundation and weather impacts. The project would add four 4-inch layers of aggregate totaling at least 12-inches to the existing 12.5-foot-wide trail. The additional layers will result in about a 9-foot path width along the top of the trail. The additional aggregate will extend from the far side of the access path to the Nature Center to the western edge of the road pavement of Embarcadero Road, roughly 250 feet.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 4 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS