Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Baylands Trail Replenishment Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Palo Alto is initiating the Baylands Trail Replenishment Project to repair and reinforce the surface of the trail connecting Embarcadero Road to the Lucy Evans Baylands Interpretive Nature Center. Located within the 1,940-acre Baylands Nature Preserve, the project addresses frequent flooding caused by seasonal inundation and weather impacts. The scope of work involves adding four 4-inch layers of aggregate, totaling at least 12 inches of material, to a 250-foot stretch of the existing 12.5-foot-wide trail, resulting in a final path width of approximately 9 feet. The project site encompasses a portion of the San Francisquito Creek Trail, a section of Embarcadero Road, and a gravel parking lot intended for use as a staging area. This forecast was posted on August 12, 2026, with performance centered in Palo Alto, California. Key points of contact for the initiative include Senior Project Manager Megha Bansal and Planning Manager Claire Raybould.

General Info

Palo Alto project to repair and reinforce a 250-foot stretch of Baylands Trail.

Agency

California → City of Palo Alto

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

2775 Embarcadero Road, Palo Alto, CA, Palo Alto, CA, 94303

Set-Aside

NONE

Documents

(1)

Baylands Baylands Trail Replenishment Project_Updated

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Palo Alto
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Palo Alto
Office AddressN/A
Contacts
Megha BansalSenior Project Manager, Public Works Engineering
Claire RaybouldPlanning Manager

Full Description

Show more
The proposed Palo Alto Baylands Trail Replenishment Project entails the replenishment and repair of the surface of the trail leading from the parking lot east of Embarcadero Road west to the Lucy Evans Baylands Interpretive Nature Center. The project is located within the Baylands Nature Preserve, a 1,940-acre open space tract of marshland that is owned by the City of Palo Alto (City). The project site includes: a portion of the San Francisquito Creek Trail, a gravel parking lot that would serve as a staging area, and a portion of Embarcadero Road. The raised trail connecting Embarcadero Road to Baylands Interpretive Nature Center is prone to flooding due to seasonal inundation and weather impacts. The project would add four 4-inch layers of aggregate totaling at least 12-inches to the existing 12.5-foot-wide trail. The additional layers will result in about a 9-foot path width along the top of the trail. The additional aggregate will extend from the far side of the access path to the Nature Center to the western edge of the road pavement of Embarcadero Road, roughly 250 feet.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. The scope of work includes dredging within federal jurisdiction to a depth of -12 feet Mean Lower Low Water with a 1-foot overdepth, involving the removal of gravel, sand, silt, and clay for ocean disposal. Additionally, the project requires revetted mole repairs, including clearing and grubbing, CRM wall repair, vegetation removal, and the reworking or installation of stone to fill voids. The performance period is 200 calendar days from the notice to proceed. This solicitation is an Invitation for Bid (W9128A26BA002) set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Bids must be submitted in sealed envelopes by September 30, 2026, as electronic submissions are not permitted. A bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less, is required. Award evaluation is based on a pass/fail gate for compliance and completeness, with labor surplus area status potentially serving as a tie-breaker. The project mandates strict adherence to USACE National Dredging Quality Management Program standards and EM 385-1-1 safety requirements, with a dedicated Quality Control Manager required on-site at all times.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in about 2 months
View Details