Residual Management System (RMS) for the Lower Heron Tanks 1 and 2
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The State Water Resources Control Board of California is forecasting a project to implement a Residual Management System for the Lower Heron Tanks 1 and 2 in Santa Clarita. These two 2.5-million-gallon storage tanks, originally built in 1998, require a long-term solution to address ongoing water quality challenges. The project involves the onsite construction of a prefabricated structure to house a DeNora ChlorTec sodium hypochlorite generation system, liquid ammonium sulfate chemical storage, pumps, and various analytical equipment. In addition to the physical structure, the contract includes necessary electrical and SCADA improvements to ensure proper system integration and monitoring. All construction activities will be contained within the existing facility property boundaries, requiring no external expansion. The project is managed by the Angeles District Engineer, Bill Liang.
General Info
Agency
NAICS
Place of Performance
north of 17705 Heron Ln., Santa Clarita, CA 91387, Santa Clarita, CA, 91387Set-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
