Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Tahoe Keys Marina Redevelopment Project

Forecast
2026040227State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Tahoe Keys Marina Redevelopment Project, managed by the City of South Lake Tahoe under solicitation number 2026040227, involves the comprehensive revitalization of the marina facilities located at 2435 Venice Drive, South Lake Tahoe, California. Proposed by Tahoe Keys SMI, LLC, the project scope includes the demolition of three existing marina buildings, ancillary structures, parking lots, and utilities. In their place, the redevelopment will feature new buildings, parking lots, and upgraded water connections to mains on Venice Drive East and Tahoe Keys Boulevard. Key deliverables include a 52,600-square-foot indoor boat storage facility with water tanks, three units of workforce housing to replace those demolished, and dedicated spaces for boat sales, retail, concessions, and restaurants. Additionally, the project requires the relocation of the existing boat launch and gantry crane and the replacement of the lagoon bulkhead. The project is subject to strict environmental and regulatory standards, including compliance with the California Environmental Quality Act (CEQA). A Negative Declaration was prepared, indicating no significant environmental impacts. A critical component of the work is bringing the site into compliance with water quality best management practices and implementing measures to control aquatic invasive species. Administrative oversight is provided by the City of South Lake Tahoe, with John Hitchcock serving as the Planning Manager. Official project approval and environmental review compliance were certified through Notices of Determination issued in June and August 2026.

General Info

Tahoe Keys SMI will redevelop South Lake Tahoe marina with storage and workforce housing.

Place of Performance

Tahoe Keys Boulevard and Venice Drive, South Lake Tahoe, CA, 96150

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of South Lake Tahoe
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
John HitchcockPlanning Manager
Eric MetzVice President of Development

Full Description

Show more
Tahoe Keys SMI, LLC (TKSMI) is proposing the redevelopment of the Tahoe Keys Marina(TKM) in order to revitalize the TKM landside facilities and operations. The Project would involve the demolition of 3 existing marina buildings, other ancillary structures on the site, and existing parking lots and utilities. Landside redevelopment would include new buildings, parking lots, entrances, and utilities (including upgraded water connections to mains in Venice Drive East and Tahoe Keys Boulevard). Buildings would include an approximately 52,600-square-foot indoor boat storage facility with indoor water tanks, 3 units of workforce housing (to replace the 3 existing units that would be demolished as part of the Project), and space for restaurants, retail, concessions, and boat sales. The existing boat launch and gantry crane would be relocated, and the existing bulkhead that borders the lagoon would be replaced. A significant element of the Project is bringing the site into compliance with water quality best management practices (BMPs) and assisting in controlling aquatic invasive species (AIS).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 9 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS