400 Oyster Point Bay Trail Repair Project (Project)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The 400 Oyster Point Bay Trail Repair Project, managed by the Regional Water Quality Control Board in California, involves constructing a new 8-foot-wide concrete pathway in South San Francisco. This project aims to relocate the trail further from the high tide line to prevent seasonal flooding and ensure year-round pedestrian access. The scope of work includes removing vegetation within the new alignment, protecting surrounding flora, and raising the existing parking lot connection to match the new trail grade. During the construction process, the existing trail will be closed, though a small portion will be replaced in-kind to maintain connectivity to the new path. Once construction is complete, the project will include the planting of new vegetation to mitigate environmental impacts and address flooding. The project is currently listed as a forecast with Jackson Fimrite serving as the primary environmental scientist contact.
General Info
Agency
NAICS
Place of Performance
South San Francisco, CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
