Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

2026 HIGH PRIORITY FLOOD RISK REDUCTION PROJECTS

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 2026 High Priority Flood Risk Reduction Projects, managed by the Regional Water Quality Control Board for the San Francisco Bay, focus on mitigating flood risks in the City of San Mateo. The project targets the concrete-lined 16th Avenue and 19th Avenue channels, where overgrown invasive vegetation like cattails, brass buttons, and bitter dock has obstructed water flow and caused flooding in nearby streets and buildings. These channels serve as critical drainage paths leading to Seal Slough and the San Francisco Bay. Work will specifically include the removal of invasive vegetation along 420 linear feet of the 16th Avenue channel bank. To ensure long-term stability and ecological health, the area will be treated with a native seed mix to promote native vegetation cover and prevent future erosion. The project is coordinated between the California Regional Water Quality Control Board and the City of San Mateo to restore the conveyance capacity of these essential drainage systems.

General Info

San Mateo flood risk reduction via invasive vegetation removal and native seeding.

Agency

California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

San Mateo, CA

Set-Aside

NONE

Documents

(1)

NOE_465090_906603 2026 High Priority Flood Risk Reduction Projects

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Office AddressN/A
Contacts
Jackson FimriteEnvironmental Scientist
Gustavo LopezEnvironmental Programs Coordinator

Full Description

Show more
The Project will trim and remove vegetation to reduce flood risk in two high-priority locations in the City of San Mateo, San Mateo County. In both of the concrete-lined 16th Avenue and 19th Avenue channels, overgrown vegetation such as cattails, brass buttons, and bitter dock has reduced the conveyance capacity of the channels, leading to flooding of adjacent streets and building during high flow events. The 16th Avenue Channel drains to a local drainage system that discharges to Seal Slough and ultimately the San Francisco Bay.The 19th Avenue Channel drains to Borel Creek, which discharges into Seal Slough and then the Bay. Invasive vegetation will be removed from along 420 linear feet of the bank of the 16th Avenue channel. Following invasive removal, the area will be sprayed with a native seed mix to stabilize the bank and promote native vegetation cover

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. The scope of work includes dredging within federal jurisdiction to a depth of -12 feet Mean Lower Low Water with a 1-foot overdepth, involving the removal of gravel, sand, silt, and clay for ocean disposal. Additionally, the project requires revetted mole repairs, including clearing and grubbing, CRM wall repair, vegetation removal, and the reworking or installation of stone to fill voids. The performance period is 200 calendar days from the notice to proceed. This solicitation is an Invitation for Bid (W9128A26BA002) set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Bids must be submitted in sealed envelopes by September 30, 2026, as electronic submissions are not permitted. A bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less, is required. Award evaluation is based on a pass/fail gate for compliance and completeness, with labor surplus area status potentially serving as a tie-breaker. The project mandates strict adherence to USACE National Dredging Quality Management Program standards and EM 385-1-1 safety requirements, with a dedicated Quality Control Manager required on-site at all times.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in about 2 months
View Details