Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Environmental Compliance and CEQA Oversight

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract obligates the contractor to ensure all project activities fully comply with the California Environmental Quality Act Class 1 exemption and the California Code of Regulations Title 23 provisions governing levee construction and maintenance. The work requires strict adherence to environmental regulatory standards to qualify for the CEQA Class 1 exemption, which typically applies to actions that do not have a significant effect on the environment, and to the specific technical and safety requirements outlined in Title 23 for levee systems. The contractor must implement procedures to document compliance, conduct necessary assessments, and coordinate with relevant authorities to uphold regulatory integrity throughout the project lifecycle. The contract is a subcontract under the Central Valley Flood Protection Board, governed by NAICS code 541620, indicating environmental consulting and related services. All project activities must be performed in alignment with state environmental and flood protection mandates, with the place of performance located within California’s Central Valley region. The contract was posted on June 10, 2026, and the primary reference for project details is accessible through the CEQAnet portal, ensuring transparency and traceability of environmental documentation. Failure to meet these regulatory requirements could result in project delays, penalties, or loss of exemption status, making thorough compliance a central and non-negotiable component of the work.

General Info

Contractor must comply with CEQA Class 1 exemption and Title 23 levee standards in California’s Central Valley.

Agency

California → Central Valley Flood Protection Board

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of WA2026053.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

DSID 22856 Bogle Pipe Removal Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Ensure all project activities comply with CEQA Class 1 exemption and CCR Title 23 levee regulations.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Monroe Area Recharge Project
Solicitation # RFP-2026-0001
The Lower Loup Natural Resources District is seeking a qualified professional engineering consultant for the Monroe Area Recharge Project in southwestern Platte County, Nebraska. The project aims to design and implement a system to divert water from the Loup Power Canal into identified wetlands and drainages to facilitate groundwater recharge and baseflow retiming. The scope of work includes an existing conditions assessment, site identification and prioritization, conceptual and final design, permitting support, and the development of a final hydrologic modeling report and an operations and maintenance plan. All designs must adhere to Federal Energy Regulatory Commission requirements, including specific mandates for minimum flow in bypass reaches, run-of-canal operations, water temperature limits of 93 degrees Fahrenheit, and a maximum diversion of 2,000 cfs between March 1 and June 30. Proposals are due by 5:00 pm on October 2, 2026, and must consist of four hard copies and one digital version delivered to the district office in Ord, Nebraska. Selection will be based on technical qualifications, a proven track record with similar water retiming projects, the proposed approach, and cost effectiveness. Work is scheduled to commence by December 1, 2026, with a timeline to be mutually agreed upon following the award. The contract requires the consultant to be fully insured for general liability and workers compensation. Payment will be processed on a monthly basis, subject to a 10 percent retainage that will be released upon project completion.
Lower Loup Natural Resources District

POSTED

about 19 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS