Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Environmental Compliance and Endangered Species Protection

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
Monroe Area Recharge Project
Solicitation # RFP-2026-0001
The Lower Loup Natural Resources District is seeking a qualified professional engineering consultant for the Monroe Area Recharge Project in southwestern Platte County, Nebraska. The project aims to design and implement a system to divert water from the Loup Power Canal into identified wetlands and drainages to facilitate groundwater recharge and baseflow retiming. The scope of work includes an existing conditions assessment, site identification and prioritization, conceptual and final design, permitting support, and the development of a final hydrologic modeling report and an operations and maintenance plan. All designs must adhere to Federal Energy Regulatory Commission requirements, including specific mandates for minimum flow in bypass reaches, run-of-canal operations, water temperature limits of 93 degrees Fahrenheit, and a maximum diversion of 2,000 cfs between March 1 and June 30. Proposals are due by 5:00 pm on October 2, 2026, and must consist of four hard copies and one digital version delivered to the district office in Ord, Nebraska. Selection will be based on technical qualifications, a proven track record with similar water retiming projects, the proposed approach, and cost effectiveness. Work is scheduled to commence by December 1, 2026, with a timeline to be mutually agreed upon following the award. The contract requires the consultant to be fully insured for general liability and workers compensation. Payment will be processed on a monthly basis, subject to a 10 percent retainage that will be released upon project completion.
Lower Loup Natural Resources District

POSTED

about 23 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This contract requires strict adherence to environmental compliance measures focused on protecting the endangered Red-Cockaded Woodpecker and Okaloosa Darter through the establishment and maintenance of mandated buffer zones. All activities must align with the guidance provided by the Natural Resources Branch to ensure no disturbance occurs within designated habitats, and species protection protocols must be implemented throughout the project lifecycle. The effort involves monitoring, reporting, and operational adjustments to safeguard these federally protected species while conducting work in the designated area near Goulds, Florida, with a ZIP code of 32542. The contract is classified as a subcontract under NAICS code 541620, relating to environmental consulting services, and was posted on May 4, 2026, with a response deadline of May 28, 2026, at 3:00 PM. It is issued by the Department of Defense through the FA2823 AFTC PZIO office and is part of a broader initiative to meet federal environmental standards. The place of performance is specifically tied to the Goulds region, and all work must be executed with full awareness of ecological constraints and regulatory obligations. Failure to comply with buffer zone requirements or species protection mandates may result in non-conformance and corrective action.

General Info

Environmental consulting subcontract ensuring buffer zones protect endangered species in Goulds, DoD project.

Agency

Department Of Defense → FA2823 Aftc PzioView Agency

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

GOULDS, FL, 32542, USA

Set-Aside

NONE

Documents

This scope was carved out of FA282326R4004.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Double Branch Timber Sale - Eglin AFB, FL

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2823 Aftc Pzio
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA2823 Aftc Pzio
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Ensure compliance with buffer zones for Red Cockaded Woodpecker and Okaloosa Darter, and implement species protection measures under guidance from the Natural Resources Branch.

More opportunities from Department Of Defense → FA2823 Aftc Pzio

Same awarding agency

NAICS: 561621
New
Federal
AA/ACS LENEL REPLACEMENT
Solicitation # FA282326Q3007
Solicitation FA282326Q3007 is a total small business set-aside for a firm-fixed-price delivery order to replace the end-of-life Access Control System (ACS) in Building 351 at Eglin Air Force Base, Florida. The scope of work includes the installation of a high-performance desktop workstation, upgrading to the latest Lenel OnGuard software and licensing, and installing a CAC/PIN-capable HID Prox reader. Additionally, the contractor must integrate the existing main entry reader into a new standalone ACS panel and provide an operational badge printer. The project requires full database programming, user profile setup, and on-site system validation testing. The period of performance is estimated at 45 to 60 calendar days from award to final government acceptance, with a project kickoff meeting scheduled within seven days of award. Work must be performed during standard duty hours. Award will be based on the lowest price, technically acceptable (LPTA) basis, with technical acceptability and risk assessments, including DFARS provision 252.204.7024, serving as pass/fail gates. Final acceptance is contingent upon the delivery of signed system test reports and closeout documentation. A site visit is scheduled for September 8, 2026, requiring advance personnel information for base pass processing by September 4, 2026, and adherence to REAL ID requirements.
Security Systems Services (except Locksmiths)

POSTED

4 days ago

DEADLINE

in 1 day
View Details
NAICS: 238210
Federal
Bldg. 696, Network Wiring Upgrade (LAN Drops)
Solicitation # FA282326Q0084
The Air Force Test Center, Operational Contracting Division at Eglin Air Force Base, is soliciting quotations for a firm-fixed-price contract to perform a network wiring upgrade at Building 696. This project involves the engineering, furnishing, installation, and testing of 166 NIPR drops on the first floor of the south end of the building, including CAT6A data cabling, patch panels, and associated telecommunications room work. The acquisition is a 100 percent small business set-aside under NAICS code 238210, with a size standard of 19.0 million dollars. The period of performance is 120 calendar days after award, and all deliverables are provided FOB Destination. Award will be granted to the responsible offeror providing the lowest-priced, technically acceptable solution. Technical evaluations are based on a strict acceptable or unacceptable basis regarding the Performance Work Statement and 96th Communications Squadron Cyber Infrastructure Standards. Key requirements include the use of BICSI Registered Cabling Installers at the technician level and adherence to ANSI/TIA, NEC, and UFC standards. Offerors must submit their quotations electronically via the PIEE Solicitation Module by September 17, 2026, including their business size status, UEI, CAGE code, and a detailed list of proposed products with part numbers and quantities. Final acceptance is contingent upon the submission of copper to fiber test reports and as-built drawings, verified by the 96 CS/SCXP Project Manager.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

12 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS