Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Environmental/Containment Design (Booms)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity is for the Golden Gate Bridge, Highway and Transportation District to provide design and specification services for the replacement of fixed containment booms at ferry berth projects in Larkspur, California. The selected professional will be responsible for determining containment capacity, developing detailed specifications for anchoring systems and boom materials, and ensuring all designs comply with current spill containment regulations. The final deliverables for this engagement include comprehensive design plans and technical specifications. Qualified candidates must hold a Professional Engineer license or be a Certified Environmental Professional. Interested parties should note that the solicitation was posted on October 12, 2026, with a response deadline of November 14, 2026. The project falls under NAICS code 541620, focusing on specialized environmental and containment engineering.

General Info

Design and specification services for ferry berth containment boom replacement in Larkspur, California.

Documents

This scope was carved out of 2026-F-068.

The full solicitation package (15 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Larkspur Ferry Terminal Berth Utility Improvements Engineering & Design

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Golden Gate Bridge, Highway and Transportation District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs design and specification work for the replacement of fixed containment booms for prime contractors on Golden Gate Bridge, Highway and Transportation District ferry berth projects. Determines containment capacity, develops specifications for boom materials and anchoring systems, and ensures compliance with spill containment regulations. Requires PE or Certified Environmental Professional. Delivers design plans and specifications for fixed containment boom replacement.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Climate Change Vulnerability Analysis for Live Oak Canal and Gilsizer Slough Drainage Districts
Solicitation # 20261027054
The Sutter County Development Services Department is soliciting proposals for a professional consultant to perform a climate change vulnerability analysis for the Live Oak Canal and Gilsizer Slough Drainage Districts in Yuba City, California. The project requires a comprehensive evaluation of existing roadway crossings, including culverts and bridges, and their connected open channels to determine their ability to convey anticipated flows based on the latest state climate and precipitation prediction models. Key tasks include conducting a structural stability and erosion potential assessment, performing a condition survey of the drainage system, importing survey data into the County's GIS system, and producing a Final Hydraulics Report and a Vulnerability Analysis report for approval by the Sutter County Board of Supervisors. Proposals are due by November 24, 2026, and will be evaluated based on project understanding, scope of work, project manager qualifications, demonstrated competence, and client references. Notably, cost proposals are not required during the initial phase; the top-ranked consultant will submit a cost proposal following a scoping meeting. The contract requires compliance with California Prevailing Wage Laws and DIR registration. The final project acceptance by the Board of Supervisors is tentatively scheduled for April through May 2028. Invoices for services are payable within thirty days of approval, and the project is managed by Neal Hay, Director of Development Services.
Sutter County Development Services Department

POSTED

about 4 hours ago

DEADLINE

in 27 days
View Details

More opportunities from California → Golden Gate Bridge, Highway and Transportation District

Same awarding agency

NAICS: 541330
SLED
Larkspur Ferry Terminal Berth Utility Improvements Engineering & Design
Solicitation # 2026-F-068
Solicitation 2026-F-068 is a request for engineering and design services for the Larkspur Ferry Terminal Berth Utility Improvements project, issued by the Golden Gate Bridge, Highway and Transportation District. The primary objective is to develop construction bid documents, including detailed plans, technical specifications, and cost estimates, for a restoration project targeted for the 2027/2028 winter work window. The scope of work encompasses repairs to camel structures, coating renewal, and the replacement of fixed containment booms, requiring the consultant to provide licensed Professional Engineers and perform field verification of all existing systems. The selection process is a multi-step evaluation involving a review of Statement of Qualifications and Proposals, potential interviews, and final contract negotiations. Proposals must be submitted electronically via the Bonfire portal by November 13, 2026, with technical and cost proposals uploaded separately. The contract includes strict compliance requirements, such as the Fly America Act, ADA and Title VI non-discrimination standards, and specific insurance and indemnification mandates. While no specific DBE/SBE goal is established, firms are required to report their socioeconomic status and describe their subcontractor selection process. Performance begins upon a written Notice to Proceed, and the contract stipulates liquidated damages of 500 dollars per calendar day for delays beyond the final acceptance date.
Engineering Services

POSTED

16 days ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS