This Solicitation opportunity from Department Of Defense was posted on July 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Environmental Dredging Services to remediate contaminated sediment associated with the Callahan Mine Superfund Site in Brooksville, Maine.

Awarded
W912WJ25BA005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of the entire building, including cleaning visible mold from CMU walls, concrete floors, and vinyl tiles, as well as the removal and replacement of affected drywall, gypsum wallboard, and acoustical tile ceiling finishes. Additionally, the contractor must clean or replace damaged theater seating cushions and perform dehumidification to maintain humidity levels at or below 50 percent. All work must adhere to ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the findings of the Micro Air Inc. Mold Testing report dated April 11, 2024. The contract is a single lump sum award based on best value, with evaluation weights distributed across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Key requirements include the provision of a Certified Industrial Hygienist for verification and final clearance, a detailed remediation plan featuring HEPA filtration and negative air pressure, and compliance with Davis-Bacon Act wage determinations. Bidders must hold a valid Indiana Contractor's License and provide proof of automobile and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Proposals must be submitted on company letterhead and include a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Work must commence within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract involves providing environmental dredging services to remediate contaminated sediments at the Callahan Mine Superfund Site in Brooksville, Maine. The scope includes dredging approximately 6,000 to 10,000 cubic yards of sediment from Goose Cove, an area covering about 1.5 acres located on the Penobscot Bay side of the former Goose Falls Dam. The work requires removing sediment to a depth of 2 to 4 feet, with the sediment being hydraulically pumped approximately 1,500 feet to a designated disposal area within a former mine pit. The project must account for challenging mobilization conditions due to tidal influences, and structures such as moorings and pipes within the dredging zone will need to be removed and later replaced. Environmental safety measures include real-time hydrogen sulfide monitoring and turbidity controls to prevent excessive sediment plumes during dredging operations. Historically, the site was a hard-rock open-pit mine, with effluent containing fine-grained waste deposited into Goose Cove and surrounding areas, leading to the accumulation of mine waste sediments. These deposits are located in Goose Cove, Dyer Cove, and South Goose Pond, with the targeted dredging area coinciding with known mine waste deposits. The project aims to address environmental concerns related to sediment contamination stemming from past mining activities, with specific attention to sediment management, safety protocols, and access control during operations. The contract is managed by the U.S. Army Corps of Engineers, New England District, with a response deadline of May 27, 2025, and involves compliance with environmental and safety regulations to ensure effective remediation of the site.

General Info

Environmental remediation dredging of 6,000-10,000 cubic yards sediment at Callahan Mine, Maine.

NAICS

562910 - Remediation Services

Place of Performance

Brooksville Maine, MA, 04617

Set-Aside

NONE

Documents

10

Amendment 0001 - W912WJ25BA0050001

PDF, High priority: read this first2 pages · amendment
High

Amendment 0002 - Goose Cove Remediation Callahan Mine Superfund Site

PDF, High priority: read this first8 pages · amendment
High

Amendment 0002 - Section 01 35 29.13 Health, Safety, and Emergency Response Procedures

PDF, High priority: read this first17 pages · amendment
High

Amendment 0003 - W912WJ25BA0050003

PDF, High priority: read this first3 pages · amendment
High

Amendment 0004

PDF, High priority: read this first5 pages · amendment
High

Amendment 0006 to Solicitation W91ZWJ25BA005

PDF, High priority: read this firstamendment
High

W91ZWJ25BA005 Amendment 0005

PDF, High priority: read this firstamendment
High

Wage Determination ME20250001 - Heavy Dredging (Maine)

PDF, High priority: read this firstwage-determination
High

Abstract of Offers - W912WJ25BA005 (Goose Cove Remediation)

PDF, Low priority2 pages · abstract-of-offers
Low

Callahan Mine Analytical Report - L2363970

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

11 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from May 19, 2025 to May 27, 2025.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts2 people available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA

Full Description

Show more
Environmental Dredging Services to remediate contaminated sediment associated with the Callahan Mine Superfund Site in Brooksville, Maine. The work consists of providing Environmental Remediation Services for dredging approximately 6,000 to 10,000 cubic yards of sediment from Goose Cove and covering an area of approximately 1.5 acres. The Goose Cove sediment removal area is located on the Penobscot Bay side of the former Goose Falls Dam with a tidal range of approximately 10 feet and a Mean Lower Low Water (MLLW) depth of approximately 4 to 6 feet. A maximum removal depth of 2-4 ft is required based on the requirements of the Record of Decision and Remedial Design. Tidal surface elevations in this area will provide unimpeded barge access; however, mobilization to this area presents several challenges. Structures within the proposed sediment removal area such as a steel pipe, chains, and moorings, will be removed by the Contractor prior to dredging, and moorings will be replaced after remediation is complete. Unauthorized boat access to Goose Cove will be controlled during remediation activities.Goose Cove sediment removal can be completed using mechanical or hydraulic methods. Sediment removed from Goose Cove will be hydraulically pumped approximately 1,500 feet to a CAD cell (former mine pit) for tremie placement. Real time hydrogen sulfide air monitoring will be required at the disposal location following an approved UFP-QAPP prepared by the Contractor. To protect against unintended releases of excessive sediment plumes, a turbidity curtain and turbidity monitoring may be required.The former Callahan Mine was a hard-rock, open-pit mine developed in Goose Pond, a shallow tidal estuary of approximately 75 acres in the Town of Brooksville, Maine. The Site is located approximately 15 miles west of the town of Blue Hill and 35 miles west of the town of Bar Harbor on the northwest side of the Cape Rosier peninsula on Penobscot Bay.Goose Cove is a narrow 15.5-acre inlet located adjacent to the northwestern end of Goose Pond, immediately north of Goose Falls. During early mine operations, groundwater seepage into the pit and entrained rock dust were pumped to an outfall in Goose Cove. This effluent likely contained fine grained drilling and blasting waste. Because of concerns about sediment accumulation in Goose Cove, an embayment within Goose Pond (Dyer Cove) was dammed off and used as a settling pond to remove a portion of the sediment (rock flour and silt) prior to discharge to Goose Cove. In addition, berms were constructed across portions of Goose Pond to separate surface water flows from mine operating areas and provide a sedimentation basin for overflow and decant discharge from the Tailings Impoundment. As a result of these operations, deposits of light gray, talcose sediment (termed mine waste) accumulated in portions of Goose Cove, Dyer Cove, and South Goose Pond. Areas of mapped mine waste (MACTEC, 2009) coincide with areas used as effluent settling ponds, effluent discharge locations, and sumps. There is an approximate 1.5-acre area (MACTEC, 2009) in Goose Cove coinciding with mine waste deposits like those in Goose Pond.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 541330
New
Federal
Architectural-Engineering Services for Hazardous, Toxic, and Radioactive Waste Services for Various Locations within the U.S. Army Corps of Engineers New England District Mission Boundaries and Other North Atlantic Division Mission Boundaries
Solicitation # W912WJ27RA001
The U.S. Army Corps of Engineers New England District is establishing a Multiple Award Task Order Contract (MATOC) pool for Architect-Engineering services to support Hazardous, Toxic, and Radioactive Waste (HTRW) projects. The total value of the pool is up to $49,000,000.00, with awards anticipated for a minimum of three small businesses and up to three unrestricted contracts. Work will primarily be performed within the six New England states, New York, and New Jersey, but may extend to other areas within the North Atlantic Division mission area, including Pennsylvania, Delaware, Maryland, Virginia, West Virginia, and the District of Columbia. The scope of work includes CERCLA investigations, the development of Quality Assurance Project Plans, advanced risk assessments, remedial designs, and construction cost estimates using MII. All work must comply with the DERP statute, CERCLA, the National Oil and Hazardous Substances Pollution Contingency Plan, and applicable DoD and Army policies. The selection process is conducted under the Brooks Act, with primary evaluation factors focusing on experience in CERCLA investigations, handling emerging contaminants such as PFAS and 1,4 Dioxane, and the ability to meet state regulatory requirements in regions like Massachusetts, Connecticut, and New Jersey. Large firms are evaluated on their ability to execute $4 million per year, while small businesses are evaluated on a $1 million annual capacity. Secondary tiebreaker factors include geographic proximity to the mission area, the extent of small business participation for large firms, and the volume of DoD contract awards in the previous 12 months. Submissions must be made electronically via the PIEE Solicitation module by January 29, 2027, and must adhere to strict page limits of 65 pages for large firms and 50 pages for small businesses.
Engineering Services

POSTED

about 14 hours ago

DEADLINE

in 3 months
View Details
NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS