Epcor - Request for Proposal - Fort Road Substation and 72 kV Transmission Line Construction

Closed
AB-2026-00985International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The project requires the contractor to provide all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this solicitation is that the existing network service must remain fully operational throughout the installation process until the owner authorizes the final switch-over. The contractor must adhere to industry standards, manufacturer requirements, and local codes, while maintaining all OSHA safety standards and site security protocols. Bids are due by September 30, 2026, and must include a completed Mandatory Bid Document with a clear bid price and authorized signature. A pre-bid meeting is scheduled for September 17, 2026. The selected contractor must hold a valid State License for General Contracting and maintain all necessary Builder’s Risk and Liability insurance. Payment will be issued as a single lump sum upon project completion, following the submission of required purchasing documents and a closeout package containing OTDR and optical loss test results. Work hours are restricted to 8:00 AM to 3:00 PM, Monday through Friday, unless otherwise approved by the owner. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and SDVOSB.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 11 hours ago

DEADLINE

in 20 days
NAICS: 237130
New
SLED
2026 Digital Enterprise Network Expansion - Phase 2
Solicitation # 0510-047-2026
The City of West Des Moines is soliciting bids for the 2026 Digital Enterprise Network Expansion project, identified as project number 0510-017-2026. This public improvement project involves the installation of a multi-user fiber optic conduit network within the public right-of-way to enable fiber optic connectivity for every residence and business in the city. The selected contractor will be responsible for providing all labor, equipment, and materials, including the installation of vaults, conduit, tracer wire, and test stations. Electronic bids must be submitted via wdm.ionwave.net by 2:00 p.m. on September 23, 2026, and must be accompanied by a bid bond or certified check equal to ten percent of the total bid amount. The City Council will hold a public hearing and potentially take action on the proposals on October 5, 2026. The successful bidder must provide a performance and payment bond for one hundred percent of the contract price, as well as a maintenance guarantee for eighteen months following acceptance. Work must commence within ten days of the notice to proceed and be completed by January 29, 2027, with liquidated damages of five hundred dollars per day assessed for delays. Payment will be made based on monthly estimates at ninety-seven percent of the contract value for completed work. Preference is given to Iowa-based products and labor in accordance with state statutes, and bidders must submit a completed Bidder Status Form to be considered responsive.
City Of West Des Moines

POSTED

about 14 hours ago

DEADLINE

in 14 days
NAICS: 237130
New
Federal
Building refurbishment in Hutchinson, KS at the HTI ARSR
Solicitation # 6973GH-26-R-00147
The Federal Aviation Administration (FAA) is soliciting proposals for the refurbishment of the ARSR building at the HTI facility in Hutchinson, Kansas. This small business set-aside project, identified as solicitation 6973GH-26-R-00147, is estimated to be valued between $500,000 and $1,000,000. The scope of work includes electrical upgrades, such as replacing a 600A MDPE1 panel with an 800A panel, selective demolition of unused vents, windows, and ladders, the installation of a new chain link perimeter fence, and the abatement and disposal of asbestos-containing materials and lead. The project specifically excludes any roofing work. The contract will be awarded as a firm-fixed-price agreement based on the Lowest Priced Technically Acceptable offer. Technical proposals must include a narrative and a detailed work plan, along with at least two references from projects valued over $100,000 completed within the last five years. Performance must begin within 15 calendar days of the notice to proceed and be completed within 45 calendar days, with a requirement that work be substantially complete within 30 days. Offerors must be registered in the System for Award Management (SAM) and adhere to Davis-Bacon wage determinations and FAA Acquisition Management System (AMS) provisions. Proposals are due by September 14, 2026, at 5:00 p.m. CT.
6973GH Franchise Acquisition Svcs

POSTED

about 15 hours ago

DEADLINE

in 5 days
NAICS: 237130
New
Federal
CJAG Power Distribution
Solicitation # W9136426P0000040397
Solicitation W91364-26-P-0000-040397 is a 100% small business set-aside for a firm-fixed-price purchase order to construct the CJAG Load Line 6 Electrical System at Camp James A. Garfield Joint Training Center in Ravenna, Ohio. The project requires the installation of approximately 1,400 linear feet of underground medium-voltage electrical service, connecting a 4.16kv overhead power line to a new pad-mounted transformer. The system must provide 750kw of steady power with a peak surge capacity of 2,000 kV. The scope of work includes route surveying, trenching, conduit installation with concrete encasement, cable pulling, grounding, and comprehensive testing, including Megger and VLF Hi-pot testing. All work must comply with NEC Article 300 and other applicable electrical standards. The contract requires the awardee to provide all necessary personnel, equipment, and quality control, with a final Quality Control Plan due within 10 days of award. Performance is scheduled to begin 10 calendar days after receipt of order and must be completed by December 1, 2026. An offer guarantee is required, and performance and payment bonds must be furnished within 10 calendar days after receipt of order. Award will be based on the best value, evaluating technical acceptability, relevant past performance in medium-voltage electrical systems, and price reasonableness. Quoters must submit a detailed technical approach, a project schedule, and documentation of all required licenses and certifications to the contracting officer, Barry B. Beale.
W7NU Uspfo Activity Oh Arng

POSTED

about 15 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract involves the construction of the Fort Road Substation, which includes the installation of 240/72kV and 240/15kV electrical equipment, located at 12310 162 St, NW, Edmonton, Alberta. In addition, the project requires building a double circuit above-ground 72 kV transmission line connecting the newly constructed Fort Road Substation to the existing EDTI Namao Substation at 12715-101 St NW, Edmonton. This Request for Proposal, issued by Epcor under the Government of Canada, aims to solicit qualified contractors to complete this infrastructure upgrade essential for improving the electrical distribution network in the area. The solicitation was posted on March 10, 2026, with a response deadline of March 31, 2026. It is managed by Epcor, a federal organization located in Alberta, with Michael Rutto serving as the primary contracting authority. The project emphasizes ensuring the delivery of high-voltage electrical infrastructure to enhance capacity and reliability in Edmonton, Alberta. Interested bidders are expected to adhere to the specified timelines and coordinate closely with the designated contact to submit proposals that meet the technical and logistical requirements outlined in the RFP.

General Info

Construction of Fort Road Substation and 72kV transmission line to enhance Edmonton’s electrical network.

Agency

Government of Canada → Epcor

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Epcor
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Epcor
Office AddressN/A
Contacts
Michael RuttoContracting Authority

Full Description

Show more
This RFP is for the construction of Fort Road 240/72kV and 240/15kV Substation located at 12310 162 St, NW, Edmonton, AB and double circuit above ground 72 kV transmission line between new Fort Road Substation and existing EDTI Namao Substation located at 12715- 101 St NW, Edmonton, AB.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS