Erosion and Sediment Control Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract titled Erosion and Sediment Control Installation is a subcontract issued by Caltrans District 4 - Bay Area/Oakland under the California agency, with a posted date of June 18, 2026. It is designated under NAICS code 238990 for other specialty trade contractors and pertains to the installation of temporary erosion control measures including silt fencing, mulching, and wattles to mitigate soil loss and prevent water contamination during and after vegetation removal activities. The work is specifically scheduled to take place in Calistoga, California, with no set-aside type specified and no point of contact detailed in the contract data. The scope of work focuses on implementing immediate, site-specific sediment control practices to comply with environmental protection standards during construction-related vegetation clearance. These measures are critical to maintaining water quality and reducing sediment runoff into nearby waterways. While the contract does not include details on duration, budget, or performance metrics, the location and nature of the work indicate it is tied to a larger infrastructure or land disturbance project in the Calistoga area. The UI link provided directs to the official project record for additional context through the CEQA Net portal.

General Info

Caltrans contracts Erosion Control Installation in Calistoga with silt fencing, mulching, and wattles for sediment prevention.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

Calistoga, CA

Set-Aside

NONE

Documents

This scope was carved out of FR_NOE_Signed.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Vegetation Management Along State Route 29

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install temporary erosion control measures such as silt fencing, mulching, and wattles to prevent soil loss and water contamination during and after vegetation removal.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
SLED
Shell Point Tennis/Pickleball Court Resurfacing
Solicitation # 102026
Beaufort County Procurement Services has issued Invitation for Bid IFB 102026 for the inspection, repair, and resurfacing of the tennis and pickleball courts at Shell Point Park in Beaufort, South Carolina. The project is necessitated by safety concerns and structural damage caused by root intrusion. The scope of work includes site preparation, demolition, and the application of a multi-layer sports surfacing system with a specific color scheme of blue in-bounds, light blue non-volley, and green out-of-bounds areas. Additionally, the contractor must install new pickleball net posts, center anchors, and nets for two courts, ensuring all work meets USAPA standard specifications for texture, slip resistance, and dimensional requirements. Bids must be submitted electronically by 2:00 pm on October 20, 2026. The award will be based on a formal sealed bid process, typically favoring the lowest responsive and responsible bidder. Requirements for submission include a bid bond for at least five percent of the total bid, and the awarded contractor must provide performance and payment bonds equal to one hundred percent of the contract amount. The project must be completed within 180 calendar days from the Notice to Proceed. Contractors are required to comply with Title VI of the Civil Rights Act and must provide a Proposed Utilization Plan for Small and Minority Business Enterprise participation unless they are self-performing one hundred percent of the work. Payment is structured monthly at ninety percent of the cost of work in place, subject to approval by the County Representative.
Capital Projects/Facilities

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS