Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Pennsylvania was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Erosion and Sediment Control Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work covers approximately 50 acres and over 35 buildings, requiring mowing, string trimming, edging, and cleanup to maintain turf height between 3 and 4 inches. The contract is designed for an initial one-year term with four optional one-year renewals. Award will be granted to the responsible offeror who is technically acceptable and provides the lowest price. To be considered technically acceptable, offerors must be registered in the State of Kentucky, verified through the SAM portal, and provide a detailed price proposal, staffing plan, equipment list, safety program, and three references for similar contracts. The project mandates strict adherence to the Federal Acquisition Regulation, OSHA, EPA, and Davis-Bacon Act labor standards, specifically Wage Determination Number KY20210041. Contractors must submit weekly certified payroll and a signed Statement of Compliance with every invoice to receive payment. Performance is monitored by the Center, and any rejected work must be corrected within 48 hours at no additional cost. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

25 minutes ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract calls for the installation of temporary and permanent erosion and sediment control systems in Chester County, Pennsylvania, to ensure compliance with environmental regulations. Work includes establishing silt fences, sediment basins, and other stormwater management features designed to prevent soil displacement and water contamination during construction or land alteration activities. These measures are essential for protecting local waterways and meeting state and federal environmental standards. The solicitation is structured as a subcontract opportunity with a response deadline of August 21, 2026, and falls under NAICS code 561730, which classifies it within environmental waste and remediation services. All work must be performed on-site within Chester County, and the agency responsible is Chester County under the state of Pennsylvania. There is no set-aside designation specified, and the opportunity is open to eligible subcontractors who can demonstrate the capability to execute the required environmental protection systems as outlined in the scope of work.

General Info

Install erosion and sediment controls in Chester County, Pennsylvania, by August 21, 2026, for environmental compliance.

Place of Performance

Chester County, PA, USA

Set-Aside

NONE

Documents

This scope was carved out of Pocopson Township, Chester County.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Route 52 and Parkersville Road Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Chester County
ContactsNo contacts available
OfficeN/A
Organization / AgencyPennsylvania → Chester County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of temporary and permanent erosion/sediment control systems including silt fences, sediment basins, and stormwater management features in compliance with environmental regulations.

More opportunities from Pennsylvania → Chester County

Same awarding agency

NAICS: 562111
SLED
2026 Yard Waste Removal (Re-bid)
Solicitation # 20261012
Kennett Township is soliciting lump sum bids for the 2026 Yard Waste Removal project to clear approximately 20,000 cubic yards of woody debris from its facility at 557 Bayard Road, Kennett Square, Pennsylvania. The waste consists primarily of tree branches, trunks under 18 inches in diameter, Christmas trees, leaves, and grass clippings. Contractors may choose to grind the material onsite or haul it away for offsite grinding. The selected contractor must complete the removal within 45 calendar days of the bid award, which is anticipated around November 6, 2026. Failure to meet this timeline will result in a penalty of 200 dollars per day. Work is permitted Monday through Saturday from 7:00 am to 7:00 pm. The contract requires strict adherence to state-mandated prevailing wage rates, and certified payrolls must be submitted to receive payment. Bidders must provide a 10 percent bid bond and comprehensive insurance coverage, including Commercial General Liability, Automobile Liability, and Workers Compensation, naming Kennett Township as an additional insured. Required submission documents include a Non-Collusion Affidavit, a Prevailing Wage Compliance Form, and a Public Works Employment Verification Form confirming E-Verify usage. Bids must be submitted via the PennBID Platform. Payment is structured as a 50 percent interim payment upon removal of half the pile and a final payment upon completion and demobilization, with ACH and check payments requiring Board of Supervisors approval.
Solid Waste Collection

POSTED

13 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS