Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Erosion and Sedimentation Control

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity with Moore & Bruggink, Inc involves the installation and maintenance of temporary erosion and sedimentation control measures for sanitary sewer projects within the Village of Pierson. The selected provider will be responsible for implementing sediment and erosion control plans, which includes installing berms, dikes, and drains to manage water flow and minimize the exposure of bare soil. The primary objective is to ensure compliant site runoff control throughout the duration of the project. The scope of work also requires the contractor to perform a complete cleanup of all control measures within one week after they are no longer required. This solicitation is classified under NAICS code 238910 and was posted on September 25, 2026. Interested parties must submit their responses by the deadline of October 1, 2026, at 6:00 PM.

General Info

Moore & Bruggink subcontract for erosion control installation and maintenance in Village of Pierson.

Place of Performance

MI, USA

Set-Aside

NONE

Documents

This scope was carved out of 200152.01.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

200152.01 Pierson Sanitary Sewer - Contract I - Septic Tanks & Sewer

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMichigan → Moore & Bruggink, Inc
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and maintains temporary erosion control measures for prime contractors on Village of Pierson sanitary sewer projects. Installs berms, dikes, and drains to prevent water flow, minimizes bare soil exposure, and implements the sediment and erosion control plan. Performs cleanup within one week after measures are no longer required. Delivers compliant site runoff control.

Similar Contracts

Same NAICS industry code

More opportunities from Michigan → Moore & Bruggink, Inc

Same awarding agency

NAICS: 237110
New
SLED
200152.01 Pierson Sanitary Sewer - Contract II - Pump Stations
Solicitation # 48868
The Village of Pierson is soliciting bids for the 2026 Sanitary Sewer Improvements Contract II, focusing on pump station upgrades with an engineer's estimate of 235,000.00 dollars. The scope of work includes the replacement of two duplex pump stations, installation of level controls, a PLC-based control panel, a new manhole structure, and the replacement of pump discharge piping and valves. Additional requirements include electrical wiring, conduit, and miscellaneous site restoration, with a bid alternate available for a natural gas generator and service. The project is expected to be completed within 365 days and requires the contractor to provide a bypass pumping plan for approval prior to construction, specifically utilizing a pump capable of 600PS at a 150 foot distance. Encrypted bids must be submitted via Bid Express or in person at the Village of Pierson by 2:30 p.m. on October 1, 2026. Only bidders prequalified by the Village of Pierson will have their bids opened. A non-mandatory pre-bid meeting is scheduled for September 16, 2026, at 10 a.m. at 190 Grand Street. This project mandates compliance with American Iron and Steel requirements, meaning all iron and steel products must be produced in the United States, though waivers for de minimis, minor components, and pig iron apply. Technical specifications include the use of OBC coating for manholes and adherence to specific standards for pump installations and electrical safety disconnects.
Water and Sewer Line and Related Structures Construction

POSTED

about 19 hours ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS