Erosion Control & Riprap Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for the City and County of San Francisco involves the installation of erosion control systems for SFPUC water projects. The selected provider will be responsible for laying geotextile fabric and placing large riprap stones to stabilize stream banks and culverts, acting as a subcontractor to prime contractors. The scope of work requires strict adherence to the project's Mitigation Reporting or Monitoring Plan and compliance with CDFW permitting jurisdiction. The final deliverable is a fully installed erosion control system designed to prevent soil erosion and ensure structural stability.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
This scope was carved out of Rehabilitation of the Existing San Joaquin Pipelines.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
