Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Erosion Control and Riprap Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Colorado → Public WorksView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CO, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-038 (PL2201); CDOT M086-089 (25192).

The full solicitation package (13 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction of Wildhorse Trail (Westside Trail)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyColorado → Public Works
ContactsNo contacts available
OfficeN/A
Organization / Agency
Colorado → Public Works
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs riprap and cutoff walls for prime contractors on City/CDOT projects to stabilize creek banks and trail edges. Installs 1,105 SY of riprap with toe-down and constructs 56 SY of ford crossings and cutoff walls. Adheres to environmental restrictions on wetland disturbance and pollutant runoff. Delivers stabilized creek banks and ford crossings.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
ACADEMY OF RICHMOND COUNTY PARKING LOT PAVEMENT REPAIR and STRIPING
Solicitation # 26-214
The Richmond County Board of Education has issued RFP 26-214 for turnkey pavement repair and striping services at the Academy of Richmond County, located at 910 Russel St., Augusta, Georgia. The scope of work includes patching designated areas to match existing pavement, installing curb and gutter to enclose grease trap access manholes, and performing line striping. Specific technical requirements include the use of 3,000 FSI concrete with a fine broom finish, 98% compacted subgrade, and MPI #32 alkyd traffic-marking paint. All new striping and hatching must be yellow, while stop bars and existing crosswalks must be recoated in white, adhering to Georgia DOT Construction Standards. Asphalt top courses must cure for at least 14 days before painting. The contract will be awarded to the lowest responsible and responsive bidder, with an anticipated award date of October 20, 2026. Sealed bids are due by 3:00 PM on October 7, 2026, and must include turnkey pricing, a project lead time, company references, and a signed Sex Offender Acknowledgement Form. Contractors must maintain commercial general liability insurance of 2 million dollars and worker's compensation insurance of 1 million dollars. Compliance with Georgia state laws is mandatory, including E-Verify affidavits, periodic criminal history record inquiries under O.C.G.A. 35-3-34, and adherence to a smoke-free environment on school property. All work coordination and deliveries must be cleared through David Perry.
Richmond County Board of Education

POSTED

about 11 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 4 days
View Details

More opportunities from Colorado → Public Works

Same awarding agency

NAICS: 237990
SLED
Construction of Wildhorse Trail (Westside Trail)
Solicitation # 26-038 (PL2201); CDOT M086-089 (25192)
The Westside Trail project, identified by solicitation number 26-038 (PL2201) and CDOT M086-089 (25192), involves the construction of a multi-use trail along Wildhorse Creek from 18th Street to 24th Street in Pueblo, Colorado. Managed by the Public Works agency, the project aims to improve multimodal connectivity, safety, and accessibility for pedestrians and cyclists, providing vital links to schools, parks, and regional trail systems. The scope of work includes grading, drainage design, and the implementation of ADA-compliant access points to reduce vehicle dependency and promote active transportation within the Westside neighborhood. The procurement process requires contractors to adhere to several regulatory and legal frameworks, including the Federal Labor Standards Provisions for minimum wage and fringe benefits and the Federal Funding Accountability and Transparency Act reporting requirements. Additionally, contractors must comply with the City of Pueblo's Section 3 Utilization Plan to provide employment opportunities for low- and very low-income individuals. Financial and legal obligations include maintaining appropriate city licenses, adhering to a 3.7 percent sales and use tax rate, and providing performance and payment bonds to guarantee contract execution. The response deadline for this solicitation is September 23, 2026.
Other Heavy and Civil Engineering Construction

POSTED

10 days ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS