Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Erosion Control & Seeding

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → County of SacramentoView Agency

NAICS

561730 - Landscaping ServicesView NAICS

Place of Performance

Sloughhouse, CA, 95683, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260901044.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Kiefer Landfill- Module 5, Phase 1 Liner Construction

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → County of Sacramento
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → County of Sacramento
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Implements environmental controls and site stabilization for prime contractors on County of Sacramento landfill projects. Installs erosion and sediment control measures and performs seeding of disturbed areas using silt fences, seed, mulch, and erosion control blankets. Delivers a stabilized site meeting environmental compliance.

Similar Contracts

Same NAICS industry code

NAICS: 561730
New
Snow Plowing and Ice Management in Bangor, ME
Solicitation # snow-plowing-ice-management-bangor-me
Arbor E&T dba EQUUS Workforce Solutions is soliciting quotes from licensed and insured providers for comprehensive snow plowing and ice management services at the Penobscot Job Corps Center located at 1375 Union Street, Bangor, Maine. The contract period runs from October 15, 2026, through April 30, 2027, with the possibility of annual renewals upon mutual written agreement. Bids are due by 12:00 Noon on Friday, September 4, 2026. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. The scope of work requires the contractor to clear all parking spaces, drive lanes, and primary perimeter walkways to a minimum width of 4 feet, ensuring surfaces are cleared to bare pavement. Services are automatically triggered by 4.0 inches of snow accumulation, and all primary areas must be clear by 6:00 AM on weekdays, weekends, and holidays. Following plowing, premium rock salt must be applied to the primary asphalt road, parking lots, and sidewalks. Contractors must conduct a joint pre-season inspection with the Facility Supervisor before October 15, 2026, to document existing property damage. Safety and compliance requirements include the use of high-visibility safety vests and vehicle strobe lights during all operations. Contractors must provide a Certificate of Insurance proving at least $1,000,000 in Commercial General Liability insurance, naming the client as an additional insured. Pricing should be submitted based on per-event and hourly rates. The primary point of contact for this solicitation is David Landry, F&A Director.
Arbor E&T, LLC

POSTED

about 11 hours ago

DEADLINE

in about 1 hour
View Details

More opportunities from California → County of Sacramento

Same awarding agency

NAICS: 237990
New
SLED
Kiefer Landfill- Module 5, Phase 1 Liner Construction
Solicitation # 20260901044
The County of Sacramento is soliciting bids for the construction of the Module 5, Phase 1 base liner system and related structures at the Kiefer Landfill in Sloughhouse, California. This project involves the development of approximately 24 acres, including earthwork for soil excavation and stockpiling, the installation of a multi-layer base liner system consisting of HDPE geomembranes, GCL, and geotextiles, and the construction of a leachate collection and removal system. Additional infrastructure work includes surface water drainage structures, perimeter access road extensions, and the installation of utility alignments for electrical power, landfill gas header pipes, and leachate force mains. The estimated construction cost is 29 million dollars, which includes a 500,000 dollar bonus for early completion by March 15, 2028. The contract will be awarded to the lowest qualified, responsive, and responsible bidder. Bids must be submitted electronically via the Sacramento County portal by October 8, 2026, at 2:00 PM. Requirements for bidders include a bid bond of at least 10 percent of the aggregate bid sum, a valid CSLB license, and registration with the California Department of Industrial Relations. The successful contractor must provide performance and payment bonds for 100 percent of the contract price and adhere to prevailing wage requirements. The project has a completion timeline of 350 working days, with liquidated damages set at 10,000 dollars per calendar day for delays beyond the established completion date. Quality assurance is managed through a comprehensive CQA plan and strict testing requirements for all liner layers and welding certifications.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details