Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Colorado was posted on October 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Erosion Control & Site Work

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
CLASS 2 LANDFILL PARTIAL CLOSURE
Solicitation # 27027
The County of Greenville is soliciting proposals for the partial closure construction of the Class 2 Unit 2 Landfill at the Twin Chimneys Landfill in South Carolina. The scope of work involves significant earthwork, including approximately 301,000 cubic yards of excavation and 120,000 cubic yards of structural fill for a perimeter berm. Key deliverables include the construction of a stormwater pond, subgrade preparation, stone access roads, and the implementation of erosion control measures such as silt fencing, seeding, and gabion baskets. The project requires the contractor to provide a South Carolina-licensed land surveyor for as-built surveys and a licensed firm for soil testing. The County desires substantial completion within 210 calendar days, with a tentative Notice to Proceed date of December 18, 2026. Proposals are due by November 16, 2026, and will be evaluated on a point system covering responsiveness, experience, project approach, pricing, equipment, and references. Award decisions will heavily weigh integrity, reputation, and past performance. The contract requires a bid bond as well as performance and payment bonds equal to the contract price, remaining in effect for one year after final payment. Quality control is a dual-layered process where the contractor manages Construction Quality Control (CQC) through an independent laboratory, while the Owner performs Construction Quality Assurance (CQA) through a separate licensed firm. Payment is based on a mix of lump sum and unit price items, with undisputed invoices due upon receipt and subject to a non-appropriation clause.
LANDFILL OPERATIONS

POSTED

about 7 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

This subcontract for the Colorado Department of Transportation involves the installation of erosion control measures and the performance of debris removal to support prime contractors. The scope of work specifically includes the placement of silt fences and wattles along shoulders at CO 7 at Lily Lake and US 34 near Steamer Drive, as well as the delivery of installed systems and the clearing of debris. The project is categorized under NAICS code 238910 and is located in Larimer. Key administrative details include a posting and response deadline of October 8, 2026.

General Info

Subcontract for erosion control and debris removal for CDOT in Larimer, Colorado.

Place of Performance

Larimer, CO, USA

Set-Aside

NONE

Documents

This scope was carved out of C26435R.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Call 002 C26435R

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs erosion control measures and performs debris removal for prime contractors on Colorado Department of Transportation projects. Installs erosion control in shoulders at CO 7 at Lily Lake and US 34 near Steamer Dr using silt fences and wattles. Delivers installed erosion control systems and cleared debris.

More opportunities from Colorado Department of Transportation

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS