Erosion Control Installation (Bonded Fiber Matrix)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the application of a bonded fiber matrix across four acres of disturbed soil to control erosion and promote the establishment of vegetation. This work is part of a subcontract under the Colorado Department of Transportation and is targeted at land in Weld County where soil stability has been compromised, requiring immediate environmental mitigation. The bonded fiber matrix will serve as a protective layer to reduce runoff, retain moisture, and create conditions conducive to seed germination and root development, ensuring long-term land recovery. The solicitation was posted on August 27, 2026, with the same date set as the response deadline, indicating an expedited process likely tied to seasonal or regulatory timelines for erosion control. The NAICS code 561730 identifies this as an environmental remediation and waste management service, aligning with standard practices for post-disturbance land restoration. Performance is required at the designated location in Weld County, and while no point of contact or specific set-aside details are provided, the contract is structured as a subcontract within CDOT’s broader infrastructure or road development initiative.
General Info
Agency
NAICS
Place of Performance
Weld, CO, USASet-Aside
Documents
This scope was carved out of C27453.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
Call 002 C27453
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
