Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

EV Infrastructure Site Assessment and Design

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves providing technical evaluation and design planning for prime contractors working on Leading by Example projects for the Massachusetts Department of Energy Resources. The scope of work includes conducting site assessments for charger placement and electrical capacity using CAD software and power quality analyzers. The selected provider must hold a Professional Engineer license to certify designs and is responsible for delivering a comprehensive Site Assessment Report and a detailed Installation Proposal. The project is based in Boston and falls under NAICS code 541330.

General Info

PE-licensed provider performs EV charger site assessments and design planning in Boston.

Agency

Massachusetts → ENE01 - Department of Energy ResourcesView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Floor Boston, MA, 02114, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-27-1041-ENE01-ENE01-132621.

The full solicitation package (18 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

DOER PON-ENE-2027-001 LBE Clean Energy Grants for State Entities Fleet EVSE Deployment 4.0

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMassachusetts → ENE01 - Department of Energy Resources
ContactsNo contacts available
OfficeN/A
Organization / Agency
Massachusetts → ENE01 - Department of Energy Resources
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs technical evaluation and design planning for prime contractors on Massachusetts Department of Energy Resources (DOER) Leading by Example projects. Conducts site assessments for electrical capacity and charger placement using power quality analyzers and CAD software. Professional Engineer (PE) license required for design certification. Delivers Site Assessment Report and detailed Installation Proposal.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is soliciting sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessment and permitting support. The solicitation specifically encourages participation from certified Disadvantaged Business Enterprises, including MBE, WBE, and OBE firms. Interested parties must contact Kiewit to receive an Invitation to Bid through the Building Connected electronic system, with a final bid deadline of September 11, 2026. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Additionally, Kiewit emphasizes the importance of labor harmony, as they are signatories to several collective bargaining agreements. Detailed plans and specifications are available for review at Kiewit's Costa Mesa, California office, and further inquiries regarding the project schedule or requirements should be directed to Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 9 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Massachusetts → ENE01 - Department of Energy Resources

Same awarding agency

NAICS: 238210
SLED
DOER PON-ENE-2027-001 LBE Clean Energy Grants for State Entities Fleet EVSE Deployment 4.0
Solicitation # BD-27-1041-ENE01-ENE01-132621
The Leading by Example Clean Energy Grants for State Entities - Fleet EVSE Deployment 4.0 is a grant solicitation issued by the Massachusetts Department of Energy Resources (DOER) to support the electrification of state agency fleets through the installation of electric vehicle supply equipment (EVSE). The program provides a total funding pool of up to $627,390 to be distributed among eligible state entities. Individual grant awards are capped at $300,000 per entity, though this maximum may be increased by up to $25,000 for projects located in Environmental Justice (EJ) neighborhoods. For domicile sites, charging element installation costs are generally capped at $5,000 per location. The scope of work includes the procurement and installation of Level 1, Level 2, and DC Fast Charging ports, as well as pre-wiring for future EV-ready parking spaces. To be eligible for funding, applicants must demonstrate a clear commitment to fleet electrification, including a requirement to purchase or lease at least one electric vehicle within 18 months of a signed agreement, with leases requiring a minimum term of 36 months. For non-domicile sites, applicants must commit to completing installation within six months of a signed contract. Recipients are also required to operate and maintain the installed equipment for a minimum of five years. Evaluation criteria focus on the agency's electrification strategy, project justification, site readiness, and the potential impact on Environmental Justice populations. Applications must be submitted via the specified spreadsheet format and include required supplemental documentation, such as vendor installation proposals and, where applicable, domicile survey confirmations.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

20 days ago

DEADLINE

in 10 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS