Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on July 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Excavation and Earthwork Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract titled Excavation and Earthwork Services encompasses comprehensive site excavation, grading, trenching, and backfill activities necessary for the preparation of foundations and utility installations. Work under this subcontract is required to meet technical specifications for earthmoving operations including soil removal, landscape shaping, utility trench creation, and proper compaction and restoration of disturbed areas. The solicitation was posted on July 8, 2026, with a firm deadline for responses set for August 10, 2026, at 5:00 PM, indicating a timeframe for qualified contractors to submit proposals. The North American Industry Classification System code 237990 categorizes this as Other Heavy and Civil Engineering Construction, aligning the scope with large-scale infrastructure earthwork rather than residential or light commercial earthmoving. The contract is issued by the City of Cartersville under the Georgia state agency structure, though specific performance location details, contact information, and set-aside designations are not provided. Proposals must be submitted through the official Georgia procurement portal linked in the posting.

General Info

Excavation and earthwork services for infrastructure under City of Cartersville, due August 10, 2026.

Documents

This scope was carved out of SP-26-001.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Natural Gas Main Relocation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Cartersville
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Site excavation, grading, trenching, and backfill operations for foundations and utilities.

More opportunities from Georgia → City of Cartersville

Same awarding agency

NAICS: 237110
SLED
Project: Mechanicsville & Jones Mill Road Water Main Replacement
Solicitation # CATL250055
The City of Cartersville, Georgia, is soliciting sealed bids for the Mechanicsville and Jones Mill Road Water Main Replacement project under solicitation number CATL250055. This locally funded project requires all material, labor, and equipment to complete water main replacements across two distinct phases. Phase I involves the installation of approximately 4,346 linear feet of 8-inch and 70 linear feet of 6-inch PC 350 DIP water main, along with 818 linear feet of 2-inch SDR9 water service. Phase II consists of 6,785 linear feet of 8-inch PC 350 DIP water main and 1,069 linear feet of 2-inch SDR9 water service. Bids must be submitted based on unit price items. The project follows a strict sequential timeline where Phase II cannot begin until Phase I is substantially complete. Phase I must reach substantial completion within 180 calendar days and final completion within 210 calendar days from the notice to proceed. Phase II must then reach substantial completion within 180 calendar days and final completion within 210 calendar days following the substantial completion of Phase I. Interested bidders must submit their sealed proposals by 3:00 PM on November 12, 2026, to 301 Douthit Ferry Road, Cartersville, GA 30120. Mandatory submission requirements include a bid form, bid bond, form of qualification of bidder, non-collusion affidavit, and an immigration and security form. A bid security deposit of 5 percent is required, and bids remain valid for 60 days after the opening date.
Water and Sewer Line and Related Structures Construction

POSTED

27 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS